Extract from the Register of European Patents

EP About this file: EP4152999

EP4152999 - ICE CRAMPON [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.12.2025
Database last updated on 10.03.2026
FormerThe patent has been granted
Status updated on  17.01.2025
FormerGrant of patent is intended
Status updated on  18.09.2024
FormerExamination is in progress
Status updated on  02.02.2024
FormerRequest for examination was made
Status updated on  24.02.2023
FormerThe international publication has been made
Status updated on  26.11.2021
Formerunknown
Status updated on  25.06.2021
Most recent event   Tooltip06.02.2026Lapse of the patent in a contracting state
New state(s): MC
published on 11.03.2026 [2026/11]
Applicant(s)For all designated states
Blue Ice Europe
336 Route du Nant Jorland
ZA des Trabets
74310 Les Houches / FR
[2023/13]
Inventor(s)01 / IBARRA, Juan-Manuel
26400 CREST / FR
02 / ODDOU, Paul
Oceanside, CA 92054 / US
 [2023/13]
Representative(s)Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[N/P]
Former [2023/13]Germain Maureau
12, rue Boileau
69006 Lyon / FR
Application number, filing date21732419.303.05.2021
[2023/13]
WO2021FR50761
Priority number, dateFR2020000502319.05.2020         Original published format: FR 2005023
[2023/13]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2021234237
Date:25.11.2021
Language:FR
[2021/47]
Type: A1 Application with search report 
No.:EP4152999
Date:29.03.2023
Language:FR
The application published by WIPO in one of the EPO official languages on 25.11.2021 takes the place of the publication of the European patent application.
[2023/13]
Type: B1 Patent specification 
No.:EP4152999
Date:19.02.2025
Language:FR
[2025/08]
Search report(s)International search report - published on:EP25.11.2021
ClassificationIPC:A43C15/06
[2023/13]
CPC:
A43C15/061 (EP); A43C15/063 (US); A43C15/066 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/13]  
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:STEIGEISEN[2024/40]
English:ICE CRAMPON[2023/13]
French:CRAMPON À GLACE[2023/13]
Former [2023/13]EISKRAMPEN
Entry into regional phase17.11.2022National basic fee paid 
17.11.2022Designation fee(s) paid 
17.11.2022Examination fee paid 
Examination procedure17.11.2022Examination requested  [2023/13]
17.11.2022Date on which the examining division has become responsible
13.01.2023Amendment by applicant (claims and/or description)
06.02.2024Despatch of a communication from the examining division (Time limit: M04)
27.05.2024Reply to a communication from the examining division
19.09.2024Communication of intention to grant the patent
09.01.2025Fee for grant paid
09.01.2025Fee for publishing/printing paid
09.01.2025Receipt of the translation of the claim(s)
Opposition(s)20.11.2025No opposition filed within time limit [2026/05]
Fees paidRenewal fee
27.03.2023Renewal fee patent year 03
12.04.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ19.02.2025
ES19.02.2025
HR19.02.2025
MC19.02.2025
PL19.02.2025
SK19.02.2025
SM19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
CH31.05.2025
IS19.06.2025
[2026/11]
Former [2026/09]CZ19.02.2025
ES19.02.2025
HR19.02.2025
PL19.02.2025
SK19.02.2025
SM19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
CH31.05.2025
IS19.06.2025
Former [2025/49]CZ19.02.2025
ES19.02.2025
HR19.02.2025
PL19.02.2025
SK19.02.2025
SM19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
IS19.06.2025
Former [2025/48]CZ19.02.2025
ES19.02.2025
HR19.02.2025
PL19.02.2025
SM19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
IS19.06.2025
Former [2025/46]ES19.02.2025
HR19.02.2025
PL19.02.2025
SM19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
IS19.06.2025
Former [2025/35]ES19.02.2025
HR19.02.2025
PL19.02.2025
NO19.05.2025
RS19.05.2025
GR20.05.2025
IS19.06.2025
Former [2025/34]ES19.02.2025
HR19.02.2025
PL19.02.2025
NO19.05.2025
RS19.05.2025
IS19.06.2025
Former [2025/33]ES19.02.2025
PL19.02.2025
RS19.05.2025
Cited inInternational search[XAI] DE3803755  (SALEWA GMBH SPORTGERAETEFAB et al.)
 [XAI] DE3418832  (SALEWA GMBH SPORTGERAETEFAB et al.) [X] 1-5,7-10,13 * columns 2,4; figures 1,3 *[A] 14,15 [I] 6,11,12
 [XI] AT360406  (LAPRADE USINES SA et al.) [X] 1-5,7-10,14 * pages 3,5,6; figures 1-4 *[I] 6,11-13,15
 [XAI] US3786579  (CLARK J et al.) [X] 1-5,7-10,13 * page 2; figures 1,2,6 *[A] 14,15 [I] 6,11,12
 [XAI] DE102016212445  (OBERALP SPA et al.) [X] 1-5,7-10,13 * columns 1,2; figures 1,2,3 *[A] 14,15 [I] 6,11,12
by applicantDE7529410
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.