| EP4241435 - METHODS, SYSTEMS, AND COMPUTER READABLE MEDIA FOR PROVIDING OPTIMIZED BINDING SUPPORT FUNCTION (BSF) PACKET DATA UNIT (PDU) SESSION BINDING DISCOVERY RESPONSES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.12.2025 Database last updated on 01.04.2026 | |
| Former | The patent has been granted Status updated on 10.01.2025 | ||
| Former | Grant of patent is intended Status updated on 09.09.2024 | ||
| Former | Request for examination was made Status updated on 11.08.2023 | ||
| Former | The international publication has been made Status updated on 13.05.2022 | ||
| Former | unknown Status updated on 03.09.2021 | Most recent event Tooltip | 20.03.2026 | Lapse of the patent in a contracting state New state(s): LU | published on 22.04.2026 [2026/17] | Applicant(s) | For all designated states Oracle International Corporation 500 Oracle Parkway Mailstop 5OP7 Redwood Shores, CA 94065 / US | [2023/37] | Inventor(s) | 01 /
KRISHAN, Rajiv Bangalore 560103 / IN | 02 /
THAKUR, Raghuvamshi Vasudev Singh Bangalore 560048 / IN | [2023/37] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2023/37] | Application number, filing date | 21759196.5 | 21.07.2021 | [2023/37] | WO2021US42658 | Priority number, date | US202017093016 | 09.11.2020 Original published format: US202017093016 | [2023/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022098403 | Date: | 12.05.2022 | Language: | EN | [2022/19] | Type: | A1 Application with search report | No.: | EP4241435 | Date: | 13.09.2023 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.05.2022 takes the place of the publication of the European patent application. | [2023/37] | Type: | B1 Patent specification | No.: | EP4241435 | Date: | 12.02.2025 | Language: | EN | [2025/07] | Search report(s) | International search report - published on: | EP | 12.05.2022 | Classification | IPC: | H04M15/00, H04W24/04, H04W88/18, H04W92/00, H04L12/14, H04L67/51, H04W4/24, H04W8/00 | [2024/40] | CPC: |
H04W24/04 (EP,US);
H04L67/51 (EP,US);
H04L12/1407 (EP);
H04L67/02 (US);
H04L67/14 (US);
H04M15/41 (EP);
H04M15/44 (EP);
H04M15/66 (EP);
H04M15/8214 (EP);
H04M15/8228 (EP);
H04W4/24 (EP);
H04W4/50 (US);
|
| Former IPC [2023/37] | H04L65/40, H04M15/00, H04W24/04, H04W88/18, H04W92/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN, SYSTEME UND COMPUTERLESBARE MEDIEN ZUR BEREITSTELLUNG VON SITZUNGSBINDUNGSERKENNUNGSREAKTIONEN MIT OPTIMIERTER BINDUNGSUNTERSTÜTZUNGSFUNKTION (BSF) | [2023/37] | English: | METHODS, SYSTEMS, AND COMPUTER READABLE MEDIA FOR PROVIDING OPTIMIZED BINDING SUPPORT FUNCTION (BSF) PACKET DATA UNIT (PDU) SESSION BINDING DISCOVERY RESPONSES | [2023/37] | French: | PROCÉDÉS, SYSTÈMES ET SUPPORTS LISIBLES PAR ORDINATEUR POUR FOURNIR DES RÉPONSES DE DÉCOUVERTE DE LIAISON DE SESSION D'UNITÉ DE DONNÉES EN PAQUET (PDU) À FONCTION DE PRISE EN CHARGE DE LIAISON (BSF) OPTIMISÉE | [2023/37] | Entry into regional phase | 05.04.2023 | National basic fee paid | 05.04.2023 | Designation fee(s) paid | 05.04.2023 | Examination fee paid | Examination procedure | 05.04.2023 | Examination requested [2023/37] | 05.04.2023 | Date on which the examining division has become responsible | 18.07.2023 | Amendment by applicant (claims and/or description) | 10.09.2024 | Communication of intention to grant the patent | 02.01.2025 | Fee for grant paid | 02.01.2025 | Fee for publishing/printing paid | 02.01.2025 | Receipt of the translation of the claim(s) | Opposition(s) | 13.11.2025 | No opposition filed within time limit [2026/04] | Fees paid | Renewal fee | 14.06.2023 | Renewal fee patent year 03 | 12.06.2024 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 12.02.2025 | BG | 12.02.2025 | CZ | 12.02.2025 | DK | 12.02.2025 | EE | 12.02.2025 | ES | 12.02.2025 | FI | 12.02.2025 | HR | 12.02.2025 | IT | 12.02.2025 | LV | 12.02.2025 | NL | 12.02.2025 | PL | 12.02.2025 | RO | 12.02.2025 | SE | 12.02.2025 | SK | 12.02.2025 | SM | 12.02.2025 | NO | 12.05.2025 | RS | 12.05.2025 | GR | 13.05.2025 | IS | 12.06.2025 | PT | 12.06.2025 | LU | 21.07.2025 | [2026/17] |
| Former [2025/49] | AT | 12.02.2025 | |
| BG | 12.02.2025 | ||
| CZ | 12.02.2025 | ||
| DK | 12.02.2025 | ||
| EE | 12.02.2025 | ||
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| IT | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| RO | 12.02.2025 | ||
| SE | 12.02.2025 | ||
| SK | 12.02.2025 | ||
| SM | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/48] | AT | 12.02.2025 | |
| BG | 12.02.2025 | ||
| CZ | 12.02.2025 | ||
| DK | 12.02.2025 | ||
| EE | 12.02.2025 | ||
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| IT | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| SE | 12.02.2025 | ||
| SM | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/47] | BG | 12.02.2025 | |
| DK | 12.02.2025 | ||
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| IT | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| SE | 12.02.2025 | ||
| SM | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/46] | BG | 12.02.2025 | |
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| SE | 12.02.2025 | ||
| SM | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/42] | BG | 12.02.2025 | |
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| SE | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/35] | BG | 12.02.2025 | |
| ES | 12.02.2025 | ||
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| GR | 13.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/34] | ES | 12.02.2025 | |
| FI | 12.02.2025 | ||
| HR | 12.02.2025 | ||
| LV | 12.02.2025 | ||
| NL | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| NO | 12.05.2025 | ||
| RS | 12.05.2025 | ||
| IS | 12.06.2025 | ||
| PT | 12.06.2025 | ||
| Former [2025/33] | ES | 12.02.2025 | |
| FI | 12.02.2025 | ||
| PL | 12.02.2025 | ||
| RS | 12.05.2025 | Cited in | International search | [XI] NOKIA ET AL: "Correction of PCF discovery via BSF to consider eSBA binding principles", vol. SA WG2, no. Reno, USA; 20191218 - 20191222, 21 November 2019 (2019-11-21), XP051828291, Retrieved from the Internet | [AD] "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Binding Support Management Service; Stage 3 (Release 16)", no. V16.5.0, 25 September 2020 (2020-09-25), pages 1 - 34, XP051961097, Retrieved from the Internet | [AD] "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Network Function Repository Services; Stage 3 (Release 16)", vol. CT WG4, no. V16.5.0, 25 September 2020 (2020-09-25), pages 1 - 195, XP051961081, Retrieved from the Internet | [XI] ANONYMOUS: "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System Architecture for the 5G System (5GS); Stage 2 (Release 16)", vol. SA WG2, no. V16.2.0, 24 September 2019 (2019-09-24), pages 1 - 391, XP051784669, Retrieved from the Internet | by applicant | US202017093016 | "Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Binding Support Management Service; Stage", 3GPP TS 29.521, September 2020 (2020-09-01) | "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Network Function Repository Services", 3GPP TS 29.510, September 2020 (2020-09-01) |