blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4017196

EP4017196 - METHOD AND DEVICE FOR DETERMINING PRIORITY OF HARQ FEEDBACK IN NR V2X [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  15.06.2023
Database last updated on 16.09.2024
FormerRequest for examination was made
Status updated on  20.05.2022
FormerThe international publication has been made
Status updated on  15.03.2022
Most recent event   Tooltip27.06.2024New entry: Despatch of examination report + time limit 
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2022/25]
Inventor(s)01 / HWANG, Daesung
IP Center
LG Electronics Inc.
19, Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
02 / LEE, Seungmin
IP Center
LG Electronics Inc.
19, Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
03 / SEO, Hanbyul
IP Center
LG Electronics Inc.
19, Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
 [2022/25]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2022/25]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date21772335.218.02.2021
[2022/25]
WO2021KR02059
Priority number, dateUS202062991551P18.03.2020         Original published format: US 202062991551 P
KR2020003781627.03.2020         Original published format: KR 20200037816
KR2020005653612.05.2020         Original published format: KR 20200056536
US202063104497P22.10.2020         Original published format: US 202063104497 P
[2022/25]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021187759
Date:23.09.2021
Language:KO
[2021/38]
Type: A1 Application with search report 
No.:EP4017196
Date:22.06.2022
Language:EN
[2022/25]
Search report(s)International search report - published on:KR23.09.2021
(Supplementary) European search report - dispatched on:EP12.10.2022
ClassificationIPC:H04W72/12, H04L5/00, H04L1/18, H04W72/14, H04W72/04, H04W92/18
[2022/45]
CPC:
H04L5/0055 (EP,CN,KR,US); H04L1/1854 (EP,KR); H04L1/1812 (CN,KR,US);
H04L1/0018 (KR); H04L1/1848 (EP); H04L1/1861 (EP);
H04L1/1893 (EP); H04L1/1896 (EP); H04L5/0094 (EP);
H04W4/40 (EP,KR); H04W72/0446 (CN); H04W72/20 (KR);
H04W72/21 (US); H04W72/23 (EP,CN,KR,US); H04W72/56 (CN);
H04W72/569 (KR); H04W92/18 (EP,KR); H04L1/1822 (EP) (-)
Former IPC [2022/25]H04W72/12, H04L5/00, H04L1/18, H04W72/14, H04W92/18, H04W4/40
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/25]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR BESTIMMUNG DER PRIORITÄT EINER HARQ-RÜCKKOPPLUNG IN NR V2X[2022/25]
English:METHOD AND DEVICE FOR DETERMINING PRIORITY OF HARQ FEEDBACK IN NR V2X[2022/25]
French:PROCÉDÉ ET DISPOSITIF POUR DÉTERMINER LA PRIORITÉ D'UNE RÉTROACTION HARQ DANS NR V2X[2022/25]
Entry into regional phase15.03.2022Translation filed 
15.03.2022National basic fee paid 
15.03.2022Search fee paid 
15.03.2022Designation fee(s) paid 
15.03.2022Examination fee paid 
Examination procedure15.03.2022Examination requested  [2022/25]
21.04.2023Amendment by applicant (claims and/or description)
21.04.2023Date on which the examining division has become responsible
14.06.2023Despatch of a communication from the examining division (Time limit: M04)
28.09.2023Reply to a communication from the examining division
31.10.2023Despatch of a communication from the examining division (Time limit: M04)
09.02.2024Reply to a communication from the examining division
19.02.2024Despatch of a communication from the examining division (Time limit: M04)
11.06.2024Reply to a communication from the examining division
26.06.2024Despatch of a communication from the examining division (Time limit: M04)
Fees paidRenewal fee
23.02.2023Renewal fee patent year 03
26.02.2024Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[E]EP4027732  (LG ELECTRONICS INC [KR]);
International search[A]US2019174533  (LEE YOUNGDAE [KR], et al) [A] 1-20* See paragraphs [0115]-[0128]; and figure 7. *;
 [A]  - Ericsson, "Text proposal for TS 38.213 endorsed in [100e-NR-5G_V2X_NRSL- RA_Mode1-03]", 3GPP Draft; R1-2001414, (20200306), vol. RAN WG1, pages 1 - 2, XP051860460 [A] 1-20 * See section 16.5. *
 [A]  - Ericsson, "Feature lead summary#4 on Resource allocation for NR sidelink Mode 1", 3GPP Draft; R1-2001367, (20200306), vol. RAN WG1, pages 1 - 44, XP051860420 [A] 1-20 * See section 1. *
 [A]  - RAN WG1, "Remaining issues on Mode 1 resource allocation in NR V2X", (20200215), vol. RAN WG1, pages 1 - 44, XP051853345 [A] 1-20 * See section 2. *
 [A]  - OPPO, "Remaining issues of mode 1 resource allocation for NR-V2X", 3GPP Draft; R1-2000490, (20200215), vol. RAN WG1, pages 1 - 9, XP051853329 [A] 1-20 * See section 2. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.