| EP4256010 - COMPOSITION [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 14.06.2024 Database last updated on 19.03.2026 | |
| Former | Grant of patent is intended Status updated on 11.02.2024 | ||
| Former | Request for examination was made Status updated on 08.09.2023 | ||
| Former | The international publication has been made Status updated on 17.06.2022 | ||
| Former | unknown Status updated on 03.12.2021 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For:AL
AT
BE
BG
CH
CZ
DK
EE
ES
FI
FR
GR
HR
HU
IS
LI
LT
LU
LV
MC
MK
NL
NO
PL
PT
RO
SE
SI
SK
SM
Unilever IP Holdings B.V. Bronland 14 6708 WH Wageningen / NL | For:CY
DE
GB
IE
IT
MT
RS
TR
Unilever Global IP Limited Port Sunlight Wirral, Merseyside CH62 4ZD / GB | [2025/39] |
| Former [2023/41] | For:AL
AT
BE
BG
CH
CZ
DK
EE
ES
FI
FR
GR
HR
HU
IS
LI
LT
LU
LV
MC
MK
NL
NO
PL
PT
RO
SE
SI
SK
SM
Unilever IP Holdings B.V. Weena 455 3013 AL Rotterdam / NL | ||
| For:CY
DE
GB
IE
IT
MT
RS
TR
Unilever Global IP Limited Port Sunlight Wirral, Merseyside CH62 4ZD / GB | Inventor(s) | 01 /
BATCHELOR, Stephen, Norman Wirral, CH63 3JW / GB | 02 /
BURNHAM, Neil, Stephen Wirral, CH63 3JW / GB | [2023/41] | Representative(s) | Unilever Patent Group Bronland 14 6708 WH Wageningen / NL | [N/P] |
| Former [2023/41] | Brooijmans, Rob Josephina Wilhelmus Unilever Patent Group Bronland 14 6708 WH Wageningen / NL | Application number, filing date | 21811400.7 | 26.11.2021 | [2023/41] | WO2021EP83173 | Priority number, date | EP20200212171 | 07.12.2020 Original published format: EP 20212171 | [2023/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022122417 | Date: | 16.06.2022 | Language: | EN | [2022/24] | Type: | A1 Application with search report | No.: | EP4256010 | Date: | 11.10.2023 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.06.2022 takes the place of the publication of the European patent application. | [2023/41] | Type: | B1 Patent specification | No.: | EP4256010 | Date: | 17.07.2024 | Language: | EN | [2024/29] | Search report(s) | International search report - published on: | EP | 16.06.2022 | Classification | IPC: | C11D1/00, C11D1/29, C11D1/72, C11D1/83, C11D17/00, C11D3/40 | [2023/41] | CPC: |
C11D17/0008 (EP);
C11D1/83 (EP,US);
C11D3/349 (US);
C11D3/40 (EP);
C11D3/42 (US);
C11D3/50 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/41] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ZUSAMMENSETZUNG | [2023/41] | English: | COMPOSITION | [2023/41] | French: | COMPOSITION | [2023/41] | Entry into regional phase | 23.05.2023 | National basic fee paid | 23.05.2023 | Designation fee(s) paid | 23.05.2023 | Examination fee paid | Examination procedure | 01.04.2022 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 23.05.2023 | Examination requested [2023/41] | 23.05.2023 | Date on which the examining division has become responsible | 12.02.2024 | Communication of intention to grant the patent | 10.06.2024 | Fee for grant paid | 10.06.2024 | Fee for publishing/printing paid | 10.06.2024 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
26.03.2025
27.03.2025
ADMISSIBLE Dalli-Werke GmbH & Co. KG Zweifaller Strasse 120 52224 Stolberg / DE Opponent's representative f & e patent Braunsberger Feld 29 51429 Bergisch Gladbach / DE | 02
14.04.2025
15.04.2025
ADMISSIBLE Henkel AG & Co. KGaA Henkelstrasse 67 40589 Düsseldorf / DE | [2025/21] |
| Former [2025/18] | |||
| Opponent(s) | 01
26.03.2025
27.03.2025
ADMISSIBLE Dalli-Werke GmbH & Co. KG Zweifaller Strasse 120 52224 Stolberg / DE Opponent's representative f & e patent Braunsberger Feld 29 51429 Bergisch Gladbach / DE | 08.05.2025 | Invitation to proprietor to file observations on the notice of opposition | 04.09.2025 | Reply of patent proprietor to notice(s) of opposition | 01.09.2026 | Date of oral proceedings | Fees paid | Renewal fee | 24.11.2023 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.11.2021 | AT | 17.07.2024 | BG | 17.07.2024 | CZ | 17.07.2024 | DK | 17.07.2024 | EE | 17.07.2024 | FI | 17.07.2024 | HR | 17.07.2024 | IT | 17.07.2024 | LV | 17.07.2024 | MC | 17.07.2024 | NL | 17.07.2024 | PL | 17.07.2024 | RO | 17.07.2024 | SE | 17.07.2024 | SK | 17.07.2024 | SM | 17.07.2024 | NO | 17.10.2024 | RS | 17.10.2024 | GR | 18.10.2024 | IS | 17.11.2024 | PT | 18.11.2024 | IE | 26.11.2024 | LU | 26.11.2024 | BE | 30.11.2024 | CH | 30.11.2024 | [2026/16] |
| Former [2026/10] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| IT | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SE | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| IE | 26.11.2024 | ||
| LU | 26.11.2024 | ||
| BE | 30.11.2024 | ||
| CH | 30.11.2024 | ||
| Former [2025/48] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SE | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| IE | 26.11.2024 | ||
| LU | 26.11.2024 | ||
| BE | 30.11.2024 | ||
| CH | 30.11.2024 | ||
| Former [2025/47] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SE | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| LU | 26.11.2024 | ||
| BE | 30.11.2024 | ||
| CH | 30.11.2024 | ||
| Former [2025/42] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SE | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| LU | 26.11.2024 | ||
| CH | 30.11.2024 | ||
| Former [2025/35] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| LU | 26.11.2024 | ||
| CH | 30.11.2024 | ||
| Former [2025/34] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| LU | 26.11.2024 | ||
| Former [2025/33] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| MC | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/23] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| CZ | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| EE | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SK | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/21] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| DK | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| RO | 17.07.2024 | ||
| SM | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/11] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| HR | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| RS | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/09] | AT | 17.07.2024 | |
| BG | 17.07.2024 | ||
| FI | 17.07.2024 | ||
| LV | 17.07.2024 | ||
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| IS | 17.11.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/08] | FI | 17.07.2024 | |
| NL | 17.07.2024 | ||
| PL | 17.07.2024 | ||
| NO | 17.10.2024 | ||
| GR | 18.10.2024 | ||
| PT | 18.11.2024 | ||
| Former [2025/04] | NL | 17.07.2024 | |
| PT | 18.11.2024 | ||
| Former [2025/03] | PT | 18.11.2024 | Cited in | International search | [XY] US2008064619 (BASTIGKEIT THORSTEN et al.) | [XY] US2019010426 (SCIALLA STEFANO et al.) | [Y] WO2018206202 (UNILEVER PLC et al.) | [A] EP2714878 (UNILEVER PLC NO 41424 et al.) | by applicant | WO2007147866 | WO2009141172 | WO2009141173 | WO2020023812 | US5574179 | US4956447 | US4861512 | US4702857 | WO2007079850 | WO2016005271 | "Non-ionic Surfactants: Organic Chemistry", 1998, MARCEL DEKKER | KREUTZER, U. R, JOURNAL OF THE AMERICAN OIL CHEMISTS' SOCIETY, vol. 61, no. 2, pages 343 - 348 | SANCHEZ M.A. ET AL., J.CHEM.TECHNOL.BIOTECHNOL, vol. 92, 2017, pages 27 - 92 | "Ullmann's Enzyclopaedie der technischen Chemie", vol. 56, 1995, MARCEL DEKKER, pages: 436 | GUPTA M.K.: "A Practical Guide to Vegetable Oil Processing", 2017, ACADEMIC PRESS | SAAD M.G. ET AL.: "Algal Biofuels: Current Status and Key Challenges", ENERGIES, vol. 12, 2019, pages 1920 | MASRI M.A. ET AL.: "A sustainable, high-performance process for the economic production of waste-free microbial oils that can replace plant-based equivalents", ENERGY ENVIRON. SCI., vol. 12, 2019, pages 2717 | CTFA: "International Buyers Guide", 1992, WILEY-VCH | OPD: "Chemicals Buyers Directory 80th Annual Edition", 1993, SCHNELL PUBLISHING CO | POUCHER, JOURNAL OF THE SOCIETY OF COSMETIC CHEMISTS, vol. 6, no. 2, 1955, pages 80 | BELITZ H.-D.GROSCH W.: "Food Chemistry", SPRINGER | Opposition | US2019010426 | WO2007111887 | US2008234165 | DE102012201980 | US2006183656 | US4515704 | US2009118155 | WO0036068 | WO2018104379 | US2008177089 | WO2006004876 | WO2007087252 | WO2012159778 | WO2011060028 | WO2017123457 | ANONYMOUS: "Tinopal CBS-X - Technical information ", BASF, 1 March 2011 (2011-03-01), pages 1 - 4, XP093270938, Retrieved from the Internet | D9 - Optical Brightener DMS-X | ANONYMOUS: "Kokosl ", WIKIPEDIA, 24 June 2024 (2024-06-24), pages 1 - 9, XP093270943, Retrieved from the Internet | ANONYMOUS: "Talll-Fettsuren (TOFA): Eine hervorragende Quelle fr Fettsuren auf Pflanzenbasis", WER TEC, 28 May 2024 (2024-05-28), pages 1 - 2, XP093270946, Retrieved from the Internet | FALBE J: "Surfactants in Consumer Products - Theory, Technology andApplication ", 1 January 1987, SPRINGER-VERLAG , HEIDELBERG , ISBN: 978-0-387-17019-0, article BIERMANN F, F. LANGE, R. PIORR, U. PLOOG, H. RUTZEN, J. SCHINDLER, R. SCHMID: "3 Synthesis of Surfactants", pages: 24 - 33, XP093270960, DOI: 10.14220/9783737005913.back DOI: http://dx.doi.org/10.14220/9783737005913.back | ANONYMOUS: "Lutensol AT types ", BASF - TECHNICAL INFORMATION, 1 August 2013 (2013-08-01), pages 1 - 8, XP093270963, Retrieved from the Internet | ANONYMOUS: "Safety Data Sheet Lutensol AT 25 E (Meaux)", BASF, 23 October 2017 (2017-10-23), pages 1 - 10, XP093270966 | ANONYMOUS: "LUTENSOL SURFACTANTS PRODUCT GUIDE - SUPERIOR PERFORMANCE WITH SUSTAINABLE INGREDIENTS", BASF, 1 December 2020 (2020-12-01), pages 1 - 32, XP093270970, Retrieved from the Internet |