EP4262330 - SECONDARY DRILLING PROCESS [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 15.09.2023 Database last updated on 19.10.2024 | |
Former | The international publication has been made Status updated on 25.06.2022 | Most recent event Tooltip | 07.06.2024 | Supplementary search report | published on 10.07.2024 [2024/28] | 07.06.2024 | Change - classification | published on 10.07.2024 [2024/28] | 07.06.2024 | Change - classification | published on 10.07.2024 [2024/28] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2023/42] | Inventor(s) | 01 /
GONG, Lili Shenzhen, Guangdong 518129 / CN | 02 /
XIE, Ertang Shenzhen, Guangdong 518129 / CN | 03 /
GAO, Feng Shenzhen, Guangdong 518129 / CN | 04 /
YANG, Dongcheng Shenzhen, Guangdong 518129 / CN | [2023/42] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2023/42] | Application number, filing date | 21905551.4 | 03.12.2021 | [2023/42] | WO2021CN135425 | Priority number, date | CN202011474637 | 14.12.2020 Original published format: CN202011474637 | [2023/42] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022127622 | Date: | 23.06.2022 | Language: | ZH | [2022/25] | Type: | A1 Application with search report | No.: | EP4262330 | Date: | 18.10.2023 | Language: | EN | [2023/42] | Search report(s) | International search report - published on: | CN | 23.06.2022 | (Supplementary) European search report - dispatched on: | EP | 06.06.2024 | Classification | IPC: | B23B35/00, H05K3/00, H05K1/02, G05B19/402, // H05K1/11 | [2024/28] | CPC: |
B23B35/00 (EP);
B26F1/16 (CN);
B26D7/02 (CN);
B26D7/27 (CN);
G05B19/402 (EP);
H05K3/0008 (EP);
H05K3/0047 (EP);
G05B2219/45129 (EP);
H05K1/0251 (EP);
H05K1/0298 (EP);
H05K1/115 (EP);
H05K2203/0207 (EP);
Y02P90/02 (EP)
(-)
|
Former IPC [2023/42] | H05K3/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/42] | Title | German: | SEKUNDÄRBOHRVERFAHREN | [2023/42] | English: | SECONDARY DRILLING PROCESS | [2023/42] | French: | PROCESSUS DE PERÇAGE SECONDAIRE | [2023/42] | Entry into regional phase | 10.07.2023 | Translation filed | 10.07.2023 | National basic fee paid | 10.07.2023 | Search fee paid | 10.07.2023 | Designation fee(s) paid | 10.07.2023 | Examination fee paid | Examination procedure | 10.07.2023 | Amendment by applicant (claims and/or description) | 10.07.2023 | Examination requested [2023/42] | Fees paid | Renewal fee | 31.12.2023 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [Y]US2009179017 (MATSUMOTO HISASHI [US], et al); | [XYI]CN110839321 (SHENNAN CIRCUITS CO LTD) |