| EP4046828 - WEAR DETECTION SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.10.2025 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 15.11.2024 | ||
| Former | Grant of patent is intended Status updated on 09.07.2024 | ||
| Former | Request for examination was made Status updated on 13.01.2023 | ||
| Former | The application has been published Status updated on 22.07.2022 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): BE, IE | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states Schunk Transit Systems GmbH Hauptstraße 97 35435 Wettenberg / DE | [2022/34] | Inventor(s) | 01 /
SPIES, Jürgen 35428 Langgöns / DE | 02 /
PFEFFER, Daniel 35325 Mücke / DE | 03 /
NETTESHEIM, Dr. Stefan 12205 Berlin / DE | 04 /
JAKUBITH, Dr. Sven 12203 Berlin / DE | 05 /
FLEISCHHAUER, Guntram 35102 Lohra / DE | 06 /
STAUBACH, Timo 36358 Herbstein / DE | [2022/34] | Representative(s) | advotec. Patent- und Rechtsanwaltspartnerschaft mbB Georg-Schlosser-Straße 6 35390 Gießen / DE | [N/P] |
| Former [2022/34] | advotec. Patent- und Rechtsanwaltspartnerschaft Tappe mbB Georg-Schlosser-Straße 6 35390 Gießen / DE | Application number, filing date | 22162605.4 | 10.02.2012 | [2022/34] | Priority number, date | DE20111005302 | 09.03.2011 Original published format: DE102011005302 | [2022/34] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP4046828 | Date: | 24.08.2022 | Language: | DE | [2022/34] | Type: | B1 Patent specification | No.: | EP4046828 | Date: | 18.12.2024 | Language: | DE | [2024/51] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.07.2022 | Classification | IPC: | B60C11/24, F16D66/02, H01R39/58 | [2022/34] | CPC: |
B60C11/246 (EP,US);
F16D66/02 (KR);
F16D66/021 (US);
B60C11/24 (KR);
F16D66/026 (EP,US);
H01R39/58 (EP,KR,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/07] |
| Former [2022/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERSCHLEISSERKENNUNGSSYSTEM UND VERFAHREN | [2022/34] | English: | WEAR DETECTION SYSTEM AND METHOD | [2022/34] | French: | SYSTÈME ET PROCÉDÉ DE DÉTECTION D'USURE | [2022/34] | Examination procedure | 12.01.2023 | Amendment by applicant (claims and/or description) | 12.01.2023 | Examination requested [2023/07] | 12.01.2023 | Date on which the examining division has become responsible | 10.07.2024 | Communication of intention to grant the patent | 07.11.2024 | Fee for grant paid | 07.11.2024 | Fee for publishing/printing paid | 07.11.2024 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12709810.1 / EP2683561 | Opposition(s) | 19.09.2025 | No opposition filed within time limit [2025/48] | Fees paid | Renewal fee | 17.03.2022 | Renewal fee patent year 03 | 17.03.2022 | Renewal fee patent year 04 | 17.03.2022 | Renewal fee patent year 05 | 17.03.2022 | Renewal fee patent year 06 | 17.03.2022 | Renewal fee patent year 07 | 17.03.2022 | Renewal fee patent year 08 | 17.03.2022 | Renewal fee patent year 09 | 17.03.2022 | Renewal fee patent year 10 | 17.03.2022 | Renewal fee patent year 11 | 17.02.2023 | Renewal fee patent year 12 | 23.02.2024 | Renewal fee patent year 13 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 18.12.2024 | CZ | 18.12.2024 | DK | 18.12.2024 | EE | 18.12.2024 | ES | 18.12.2024 | FI | 18.12.2024 | HR | 18.12.2024 | IT | 18.12.2024 | LV | 18.12.2024 | MC | 18.12.2024 | NL | 18.12.2024 | PL | 18.12.2024 | RO | 18.12.2024 | SE | 18.12.2024 | SK | 18.12.2024 | SM | 18.12.2024 | IE | 10.02.2025 | LU | 10.02.2025 | FR | 18.02.2025 | BE | 28.02.2025 | CH | 28.02.2025 | GB | 18.03.2025 | NO | 18.03.2025 | RS | 18.03.2025 | GR | 19.03.2025 | IS | 18.04.2025 | PT | 21.04.2025 | DE | 02.09.2025 | [2026/09] |
| Former [2026/08] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| DK | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| MC | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| LU | 10.02.2025 | ||
| FR | 18.02.2025 | ||
| CH | 28.02.2025 | ||
| GB | 18.03.2025 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| DE | 02.09.2025 | ||
| Former [2026/07] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| DK | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| MC | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| LU | 10.02.2025 | ||
| CH | 28.02.2025 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| DE | 02.09.2025 | ||
| Former [2025/48] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| DK | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| MC | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| LU | 10.02.2025 | ||
| CH | 28.02.2025 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/47] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| DK | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| MC | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| LU | 10.02.2025 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/43] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| MC | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/42] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SE | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/36] | BG | 18.12.2024 | |
| CZ | 18.12.2024 | ||
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| IT | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SK | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/35] | BG | 18.12.2024 | |
| EE | 18.12.2024 | ||
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| RO | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/34] | BG | 18.12.2024 | |
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| IS | 18.04.2025 | ||
| PT | 21.04.2025 | ||
| Former [2025/33] | BG | 18.12.2024 | |
| ES | 18.12.2024 | ||
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| PL | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| Former [2025/32] | BG | 18.12.2024 | |
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| SM | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| Former [2025/25] | BG | 18.12.2024 | |
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NL | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | ||
| Former [2025/23] | BG | 18.12.2024 | |
| FI | 18.12.2024 | ||
| HR | 18.12.2024 | ||
| LV | 18.12.2024 | ||
| NO | 18.03.2025 | ||
| RS | 18.03.2025 | ||
| GR | 19.03.2025 | Documents cited: | Search | [A] DE19840081 (CONTITECH TRANSPORTBANDSYSTEME et al.) | [A] GB2092390 (SBW ENGINEERS LTD et al.) [A] 1-10 * column 1, lines 3-17 * * column 2, line 39 - column 3, line 24; figure 2a * | [A] DE102007009423 (SCHUNK KOHLENSTOFFTECHNIK GMBH et al.) [A] 1-10 * the whole document * | [AD] DE3247330 (BBC BROWN BOVERI & CIE et al.) [AD] 1-10 * the whole document * | by applicant | DE102007009423 |