EP4276274 - SYSTEM AND METHOD FOR CONTROLLING CARBON SEQUESTRATION [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 10.05.2024 Database last updated on 15.06.2024 | |
Former | The application has been published Status updated on 13.10.2023 | Most recent event Tooltip | 28.05.2024 | New entry: Renewal fee paid | Applicant(s) | For all designated states ABB SCHWEIZ AG Bruggerstrasse 66 5400 Baden / CH | [2023/46] | Inventor(s) | 01 /
HOLDEN, Ian Welwyn, AL6 0QQ / GB | 02 /
MARTINI, Riccardo 16137 Genova / IT | [2023/46] | Representative(s) | Maiwald GmbH Engineering Elisenhof Elisenstrasse 3 80335 München / DE | [2023/46] | Application number, filing date | 22173328.0 | 13.05.2022 | [2023/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4276274 | Date: | 15.11.2023 | Language: | EN | [2023/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.11.2022 | Classification | IPC: | E21B41/00, B65G5/00, F24T10/30, E21B43/16 | [2023/46] | CPC: |
E21B41/0064 (EP);
F24T10/30 (EP);
E21B2200/20 (EP);
E21B2200/22 (EP);
E21B43/16 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/24] |
Former [2023/46] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR STEUERUNG VON KOHLENSTOFFSEQUESTRIERUNG | [2023/46] | English: | SYSTEM AND METHOD FOR CONTROLLING CARBON SEQUESTRATION | [2023/46] | French: | SYSTÈME ET PROCÉDÉ DE CONTRÔLE DE SÉQUESTRATION DE CARBONE | [2023/46] | Examination procedure | 03.05.2024 | Amendment by applicant (claims and/or description) | 03.05.2024 | Examination requested [2024/24] | 03.05.2024 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 27.05.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]US2003168211 (ARNAUD JOHNNY [US], et al) [A] 1-15 * paragraphs [0061] , [0 65] - [0067]; figures 1-3, 7-9 *; | [XAI] - GESSER RODRIGO S ET AL, "Advanced control applied to a gas compression system of an offshore platform: From modeling to related system infrastructure", JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, ELSEVIER, AMSTERDAM, NL, vol. 208, doi:10.1016/J.PETROL.2021.109428, ISSN 0920-4105, (20210828), (20210828), XP086884577 [X] 1-6,8-13,15 * pages 3-4, 8 - page 11; figures 1-6 * [A] 7 [I] 14 DOI: http://dx.doi.org/10.1016/j.petrol.2021.109428 | [A] - Belfroid S P C, "Porthos - CO2 injection", (20200930), URL: https://www.commissiemer.nl/projectdocumenten/00007542.pdf, (20221025), XP055974506 [A] 1-15 * pages 21, 24; figures 9, 11 * |