blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4303177

EP4303177 - MOLTEN METAL CATALYSED PYROLYSIS [Right-click to bookmark this link]
StatusThe application has been published
Status updated on  08.12.2023
Database last updated on 03.10.2024
Most recent event   Tooltip05.09.2024New entry: Additional fee for renewal fee: despatch of communication + time limit 
Applicant(s)For all designated states
Nederlandse Organisatie voor toegepast- natuurwetenschappelijk onderzoek TNO
Anna van Buerenplein 1
2595 DA 's-Gravenhage / NL
[2024/02]
Representative(s)Nederlandsch Octrooibureau
P.O. Box 29720
2502 LS The Hague / NL
[2024/02]
Application number, filing date22183986.308.07.2022
[2024/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4303177
Date:10.01.2024
Language:EN
[2024/02]
Search report(s)(Supplementary) European search report - dispatched on:EP17.01.2023
ClassificationIPC:C01B3/38
[2024/02]
CPC:
C01B3/38 (EP); C01B2203/0238 (EP); C01B2203/1241 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:KATALYSIERTE PYROLYSE VON GESCHMOLZENEM METALL[2024/02]
English:MOLTEN METAL CATALYSED PYROLYSIS[2024/02]
French:PYROLYSE CATALYSÉE PAR MÉTAL FONDU[2024/02]
Examination procedure17.01.2024Despatch of communication that the application is refused, reason: Examination on filing A.90(5) {1}
Fees paidPenalty fee
Additional fee for renewal fee
31.07.202403   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]US2020283293  (MCFARLAND ERIC W [US], et al) [X] 1 * paragraphs [0025] , [0036] , [0037]; figures 4,15,16 * * paragraphs [0076] , [0084] * * paragraphs [0111] - [0113] * * paragraph [0115] * * examples 6,7,9 * * paragraphs [0144] , [0145] *[I] 2-14;
 [XAI]  - LE SACHÉ E ET AL, "Analysis of Dry Reforming as direct route for gas phase CO2 conversion. The past, the present and future of catalytic DRM technologies", PROGRESS IN ENERGY AND COMBUSTION SCIENCE, ELSEVIER SCIENCE PUBLISHERS, AMSTERDAM, NL, vol. 89, doi:10.1016/J.PECS.2021.100970, ISSN 0360-1285, (20211213), (20211213), XP086905620 [X] 1-3,5-7,9 * Section 7.6;; figure 17 * [A] 4,8,11-14 [I] 10

DOI:   http://dx.doi.org/10.1016/j.pecs.2021.100970
 [XAI]  - YANG QINGHAI ET AL, "Methane dry reforming in a coking- and sintering-free liquid alloy-salt catalytic system", SUSTAINABLE ENERGY & FUELS, (20200101), vol. 4, no. 6, doi:10.1039/D0SE00433B, pages 2768 - 2774, XP093012272 [X] 1-3,5-7,9 * abstract * * page 2769, column l, paragraph l - column r, line 13; figure 1 * * Experimental section - Bubble column reactors * [A] 4,8,11-14 [I] 10

DOI:   http://dx.doi.org/10.1039/D0SE00433B
by applicantEP0655084
 US6110239
 US8309049
 WO2019226416
 WO2020161192
 US2020283293
    - KANG et al., ACS Catal., (20200000), vol. 10, no. 13, pages 7032 - 7042
    - RAHIMI et al., Carbon, (20190000), vol. 151, pages 181 - 191
    - ADACHI et al., J. Nucl. Sci. Technol., (19880000), vol. 25, no. 9, pages 712 - 720
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.