blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4124493

EP4124493 - CHARGING APPARATUS AND NEW ENERGY VEHICLE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  08.09.2023
Database last updated on 24.08.2024
FormerRequest for examination was made
Status updated on  30.12.2022
Most recent event   Tooltip11.06.2024New entry: Reply to examination report 
Applicant(s)For all designated states
Huawei Digital Power Technologies Co., Ltd.
Office 01, 39th Floor, Block A
Antuoshan Headquarters Towers
33 Antuoshan 6th Road
Futian District
Shenzhen, 518043 / CN
[2023/05]
Inventor(s)01 / HU, Yanjun
Shenzhen / CN
02 / WEN, Feng
Shenzhen / CN
03 / WANG, Tianyu
Shenzhen / CN
 [2023/05]
Representative(s)Maiwald GmbH
Elisenhof
Elisenstraße 3
80335 München / DE
[2023/05]
Application number, filing date22187710.329.07.2022
[2023/05]
Priority number, dateCN20211087693531.07.2021         Original published format: CN202110876935
[2023/05]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4124493
Date:01.02.2023
Language:EN
[2023/05]
Search report(s)(Supplementary) European search report - dispatched on:EP04.01.2023
ClassificationIPC:B60L1/00, B60L50/70, B60L58/18, B60L58/20, B60L58/26, B60L58/27, B60L58/30, B60L58/40
[2023/05]
CPC:
B60L50/70 (EP); B60L53/22 (US); B60L1/00 (EP);
B60L53/20 (EP); B60L53/305 (US); B60L58/18 (EP);
B60L58/20 (EP); B60L58/26 (EP); B60L58/27 (EP);
B60L58/30 (EP); B60L58/40 (EP); B60L2240/545 (EP);
B60L2240/547 (EP); B60L2240/549 (EP); Y02T10/70 (EP);
Y02T10/7072 (EP); Y02T90/14 (EP); Y02T90/16 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/05]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:LADEGERÄT UND FAHRZEUG MIT NEUER ENERGIE[2023/05]
English:CHARGING APPARATUS AND NEW ENERGY VEHICLE[2023/05]
French:APPAREIL DE CHARGE ET VÉHICULE À ÉNERGIE NOUVELLE[2023/05]
Examination procedure29.07.2022Examination requested  [2023/05]
20.06.2023Amendment by applicant (claims and/or description)
20.06.2023Date on which the examining division has become responsible
11.09.2023Despatch of a communication from the examining division (Time limit: M04)
30.11.2023Reply to a communication from the examining division
15.03.2024Despatch of a communication from the examining division (Time limit: M04)
10.06.2024Reply to a communication from the examining division
Fees paidRenewal fee
31.03.2024Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US8860363  (ANG WANLENG [JP]);
 [X]US2018105058  (SYMANOW DAVID ANTHONY [US], et al);
 [X]US2019176642  (DIAB MOUSTAPHA [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.