| EP4174481 - PHASE ANALYZER, SAMPLE ANALYZER, AND ANALYSIS METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.06.2025 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 05.07.2024 | ||
| Former | Grant of patent is intended Status updated on 12.03.2024 | ||
| Former | Request for examination was made Status updated on 27.10.2023 | ||
| Former | The application has been published Status updated on 31.03.2023 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states JEOL Ltd. 3-1-2 Musashino Akishima Tokyo 196-8558 / JP | [N/P] |
| Former [2024/31] | For all designated states JEOL Ltd. 3-1-2 Musashino Akishima Tokyo 196-8558 / JP | ||
| Former [2023/18] | For all designated states Jeol Ltd. 3-1-2 Musashino Akishima-shi, Tokyo 196-8558 / JP | Inventor(s) | 01 /
OTAKE, Yuka Tokyo, 196-8558 / JP | 02 /
FUJII, Atsuhiro Tokyo, 196-8558 / JP | [2023/18] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2023/18] | Application number, filing date | 22204572.6 | 28.10.2022 | [2023/18] | Priority number, date | JP20210179616 | 02.11.2021 Original published format: JP 2021179616 | [2023/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4174481 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Type: | B1 Patent specification | No.: | EP4174481 | Date: | 07.08.2024 | Language: | EN | [2024/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.02.2023 | Classification | IPC: | G01N23/2252, G01N23/2209 | [2023/18] | CPC: |
G01N23/2252 (EP);
H01J37/28 (US);
H01J37/261 (US);
G01N2223/405 (EP);
G01N2223/605 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/48] |
| Former [2023/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, ME, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PHASENANALYSATOR, PROBENANALYSATOR UND ANALYSEVERFAHREN | [2023/18] | English: | PHASE ANALYZER, SAMPLE ANALYZER, AND ANALYSIS METHOD | [2023/18] | French: | ANALYSEUR DE PHASE, ANALYSEUR D'ÉCHANTILLON ET PROCÉDÉ D'ANALYSE | [2023/18] | Examination procedure | 25.10.2023 | Amendment by applicant (claims and/or description) | 25.10.2023 | Examination requested [2023/48] | 25.10.2023 | Date on which the examining division has become responsible | 13.03.2024 | Communication of intention to grant the patent | 26.06.2024 | Fee for grant paid | 26.06.2024 | Fee for publishing/printing paid | 26.06.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 08.05.2025 | No opposition filed within time limit [2025/29] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.10.2022 | AT | 07.08.2024 | BG | 07.08.2024 | CZ | 07.08.2024 | DK | 07.08.2024 | EE | 07.08.2024 | ES | 07.08.2024 | FI | 07.08.2024 | HR | 07.08.2024 | IT | 07.08.2024 | LV | 07.08.2024 | MC | 07.08.2024 | NL | 07.08.2024 | PL | 07.08.2024 | RO | 07.08.2024 | SE | 07.08.2024 | SK | 07.08.2024 | SM | 07.08.2024 | IE | 28.10.2024 | LU | 28.10.2024 | BE | 31.10.2024 | FR | 31.10.2024 | NO | 07.11.2024 | RS | 07.11.2024 | GR | 08.11.2024 | IS | 07.12.2024 | PT | 09.12.2024 | [2026/16] |
| Former [2026/10] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| IT | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| IE | 28.10.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| FR | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/52] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| IE | 28.10.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| FR | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/48] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| IE | 28.10.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| FR | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/42] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| FR | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/35] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| FR | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/34] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| LU | 28.10.2024 | ||
| BE | 31.10.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/33] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/23] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/11] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| ES | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/09] | AT | 07.08.2024 | |
| BG | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/08] | FI | 07.08.2024 | |
| NL | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| PT | 09.12.2024 | Documents cited: | Search | [I] BOTHA PIETER: "Working with High-Dimensional Data Part 2: Classification by Cluster Analysis - MinAssist", 28 November 2017 (2017-11-28), XP093023602, Retrieved from the Internet | [I] BOTHA PIETER: "Augmenting SEM-EDS Phase Classification using Data Projection and Cluster Analysis", 16 October 2018 (2018-10-16), XP093023727, Retrieved from the Internet | [I] ALESSANDRA GENGA ET AL: "SEM-EDS investigation on PM10 data collected in Central Italy: Principal Component Analysis and Hierarchical Cluster Analysis", CHEMISTRY CENTRAL JOURNAL, BIOMED CENTRAL LTD, LO, vol. 6, no. Suppl 2, 2 May 2012 (2012-05-02), pages S3, XP021125566, ISSN: 1752-153X, DOI: 10.1186/1752-153X-6-S2-S3 [I] 1-8 * the whole document * DOI: http://dx.doi.org/10.1186/1752-153X-6-S2-S3 | [A] PAVEL POTAPOV ET AL: "Optimal principal component Analysis of STEM XEDS spectrum images", ARXIV.ORG, CORNELL UNIVERSITY LIBRARY, 201 OLIN LIBRARY CORNELL UNIVERSITY ITHACA, NY 14853, 14 October 2019 (2019-10-14), XP081515912, DOI: 10.1186/S40679-019-0066-0 [A] 4 * abstract * DOI: http://dx.doi.org/10.1186/s40679-019-0066-0 | Examination | JP2021131412 | BOTHA PIETER: "Augmenting SEM-EDS Phase Classification using Data Projection and Cluster Analysis", 16 October 2018 (2018-10-16), XP093023624, Retrieved from the Internet | MNCH B. ET AL: "Segmentation of elemental EDS maps by means of multiple clustering combined with phase identification : SEGMENTATION OF ELEMENTAL EDS MAPS", JOURNAL OF MICROSCOPY, vol. 260, no. 3, 14 September 2015 (2015-09-14), GB, pages 411 - 426, XP093024652, ISSN: 0022-2720, DOI: 10.1111/jmi.12309 [I] 1-8 * the whole document * DOI: http://dx.doi.org/10.1111/jmi.12309 | by applicant | JP2018200270 |