blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4207411

EP4207411 - ELECTRODE ASSEMBLY FOR SECONDARY BATTERY AND METHOD OF MANUFACTURING SAME [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  02.06.2023
Database last updated on 19.10.2024
Most recent event   Tooltip05.04.2024Amendment by applicant 
05.04.2024Change - designated statespublished on 08.05.2024  [2024/19]
Applicant(s)For all designated states
SK On Co., Ltd.
51, Jong-ro
Jongno-gu
Seoul 03161 / KR
[2023/27]
Inventor(s)01 / YANG, Ji Won
34124 Daejeon / KR
02 / OH, Young Rae
34124 Daejeon / KR
03 / JUNG, Jae Young
34124 Daejeon / KR
 [2023/27]
Representative(s)Prüfer & Partner mbB Patentanwälte · Rechtsanwälte
Sohnckestraße 12
81479 München / DE
[2023/27]
Application number, filing date22217284.330.12.2022
[2023/27]
Priority number, dateKR2021019391631.12.2021         Original published format: KR 20210193916
KR2022016913506.12.2022         Original published format: KR 20220169135
[2023/27]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP4207411
Date:05.07.2023
Language:EN
[2023/27]
Type: A3 Search report 
No.:EP4207411
Date:04.10.2023
Language:EN
[2023/40]
Search report(s)(Supplementary) European search report - dispatched on:EP06.09.2023
ClassificationIPC:H01M10/04, H01M10/0583, H01M10/0525, H01M50/406, H01M50/46, H01M50/466
[2023/40]
CPC:
H01M10/0459 (EP,CN); H01M50/461 (CN); H01M10/0431 (EP,US);
H01M10/04 (EP); H01M10/0404 (CN); H01M10/0413 (CN);
H01M10/052 (EP); H01M10/0525 (EP); H01M10/0583 (EP);
H01M50/406 (EP); H01M50/46 (CN); H01M50/466 (EP,CN);
Y02E60/10 (EP); Y02P70/50 (EP) (-)
Former IPC [2023/27]H01M10/04, H01M10/0583, H01M10/0525, H01M50/406
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   ME,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/19]
Former [2023/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  ME,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ELEKTRODENANORDNUNG FÜR SEKUNDÄRBATTERIE UND VERFAHREN ZUR HERSTELLUNG DAVON[2023/27]
English:ELECTRODE ASSEMBLY FOR SECONDARY BATTERY AND METHOD OF MANUFACTURING SAME[2023/27]
French:ENSEMBLE D'ÉLECTRODES POUR BATTERIE SECONDAIRE ET SON PROCÉDÉ DE FABRICATION[2023/27]
Examination procedure30.12.2022Examination requested  [2023/27]
04.04.2024Amendment by applicant (claims and/or description)
04.04.2024Date on which the examining division has become responsible
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]KR20000051741  (SAMSUNG SDI CO LTD) [Y] 4,5 * figure 1 *;
 [XY]KR20120118759  (SK INNOVATION CO LTD [KR]) [X] 1-3,6-12,15 * paragraph [0040]; figure 4 * [Y] 4,5,13;
 [YA]JP2013179035  (NISSAN MOTOR) [Y] 7,13,15 * paragraph [0094]; figure 5 * [A] 14;
 [Y]KR20200095896  (LG CHEMICAL LTD [KR]) [Y] 4,5 * paragraph [0011]; figure 1 *;
 [YA]US11090827  (YAMAMOTO TAKESHI [JP], et al) [Y] 7,13,15 * column 6, line 27 - column 6, line 44 *[A] 14
by applicantKR102183796B
 KR20220169135
 KR20210193916
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.