blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4310393

EP4310393 - INSTALLATION FOR PRODUCING ELECTRICITY OR MECHANICAL POWER, COMPRISING A COMBINED CYCLE GAS TURBINE, AND CO2 CAPTURE AND WATER ELECTROLYSIS UNITS [Right-click to bookmark this link]
StatusThe application has been published
Status updated on  22.12.2023
Database last updated on 14.09.2024
Most recent event   Tooltip05.09.2024New entry: Additional fee for renewal fee: despatch of communication + time limit 
Applicant(s)For all designated states
TotalEnergies OneTech
La Défense 6
2 Place Jean Millier
92400 Courbevoie / FR
[2024/04]
Inventor(s)01 / AIT BENGRIR, Idar
03700 BELLERIVE SUR ALLIER / FR
02 / HACHEM, Joe
78000 VERSAILLES / FR
 [2024/04]
Representative(s)Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[2024/04]
Application number, filing date22306075.720.07.2022
[2024/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4310393
Date:24.01.2024
Language:EN
[2024/04]
Search report(s)(Supplementary) European search report - dispatched on:EP05.01.2023
ClassificationIPC:F22B1/00
[2024/04]
CPC:
F22B1/006 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/04]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:ANLAGE ZUM PRODUZIEREN VON ELEKTRIZITÄT ODER MECHANISCHER ENERGIE, DIE EINE GASTURBINE MIT KOMBINIERTEM ZYKLUS UND CO2-ABSCHLUSS- UND WASSERELEKTROLYSEEINHEITEN UMFASST[2024/04]
English:INSTALLATION FOR PRODUCING ELECTRICITY OR MECHANICAL POWER, COMPRISING A COMBINED CYCLE GAS TURBINE, AND CO2 CAPTURE AND WATER ELECTROLYSIS UNITS[2024/04]
French:INSTALLATION POUR PRODUIRE DE L'ÉLECTRICITÉ OU DE L'ÉNERGIE MÉCANIQUE, COMPRENANT UNE TURBINE À GAZ À CYCLE COMBINÉ, ET CAPTURE DE CO2 ET UNITÉS D'ÉLECTROLYSE DE L'EAU[2024/04]
Examination procedure14.08.2024Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time
Fees paidPenalty fee
Additional fee for renewal fee
31.07.202403   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]AU2010362092  (SILICON FIRE AG) [A] 1-14 * abstract ** paragraphs [0094] - [0107] *;
 [A]WO2021205011  (TECHNIP FRANCE [FR]) [A] 1-14 * abstract * * page 9, line 22 - page 10, line 16 * * page 11, line 1 - page 12, line 18 * * page 19, lines 2-4 * * page 20, lines 5-15 * * page 21, lines 1-7 * * page 21, line 25 - page 23, line 6 *;
 [A]US2022065162  (HUNT DAVID [US], et al) [A] 1-14 * abstract * * paragraphs [0004] , [00 5] , [0 19] , [0 22] - [0024] - [0 27] - [0031] - [0 63] - [0071] - [0 74] - [0083] - [0 88] - [0099] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.