EP4283117 - ASSEMBLIES FOR WIND TURBINES AND METHODS [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 31.05.2024 Database last updated on 14.06.2024 | |
Former | The application has been published Status updated on 27.10.2023 | Most recent event Tooltip | 11.06.2024 | Change - representative | Applicant(s) | For all designated states General Electric Renovables España S.L. C/ Roc Boronat, 78 08005 Barcelona / ES | [2023/48] | Inventor(s) | 01 /
DROTS, Thomas 44200 Nantes / FR | 02 /
BOSCH COLLADO, Josep 08005 Barcelona / ES | 03 /
POZO TORRES, Pablo 08005 Barcelona / ES | [2023/48] | Representative(s) | Bardehle Pagenberg S.L. Avenida Diagonal 598, 3º, 1ª 08021 Barcelona / ES | [N/P] |
Former [2023/48] | de Rooij, Mathieu Julien Bardehle Pagenberg S.L. Avenida Diagonal 598, 3° 1ª 08021 Barcelona / ES | Application number, filing date | 22382495.4 | 25.05.2022 | [2023/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP4283117 | Date: | 29.11.2023 | Language: | EN | [2023/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.10.2022 | Classification | IPC: | F03D1/06, F03D15/00, F03D15/20 | [2023/48] | CPC: |
F03D1/0691 (EP,CN,US);
F03D13/10 (CN,KR);
F03D15/20 (EP);
F03D9/25 (CN);
F05B2220/7066 (EP);
F05B2230/60 (EP);
F05B2230/70 (EP);
F05B2240/61 (EP);
F05B2260/301 (EP,KR,US);
Y02E10/72 (EP,KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2024/27] |
Former [2023/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | BAUGRUPPEN FÜR WINDTURBINEN UND VERFAHREN | [2023/48] | English: | ASSEMBLIES FOR WIND TURBINES AND METHODS | [2023/48] | French: | ENSEMBLES POUR ÉOLIENNES ET PROCÉDÉS | [2023/48] | Examination procedure | 29.05.2024 | Amendment by applicant (claims and/or description) | 29.05.2024 | Examination requested [2024/27] | 29.05.2024 | Date on which the examining division has become responsible | Fees paid | Renewal fee | 15.03.2024 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XAI]CN103161680B (GUODIAN UNITED POWER TECH CO); | [A]US2021033073 (HEMMELMANN JAN ERICH [DE], et al) |