blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4278790

EP4278790 - RESOURCE SELECTION IN AN ANCHOR-CLIENT NETWORK [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  20.10.2023
Database last updated on 13.09.2024
FormerThe international publication has been made
Status updated on  22.07.2022
Formerunknown
Status updated on  09.02.2022
Most recent event   Tooltip15.03.2024Change: Validation statespublished on 17.04.2024  [2024/16]
15.03.2024Change - extension statespublished on 17.04.2024  [2024/16]
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2023/47]
Inventor(s)01 / RYU, Jung Ho
San Diego, California 92121-1714 / US
02 / AKKARAKARAN, Sony
San Diego, California 92121-1714 / US
03 / LI, Junyi
San Diego, California 92121-1714 / US
04 / LUO, Tao
San Diego, California 92121-1714 / US
05 / ZHANG, Xiaoxia
San Diego, California 92121-1714 / US
06 / GAAL, Peter
San Diego, California 92121-1714 / US
07 / MONTOJO, Juan
San Diego, California 92121-1714 / US
08 / CHENDAMARAI KANNAN, Arumugam
San Diego, California 92121-1714 / US
09 / DAMNJANOVIC, Jelena
San Diego, California 92121-1714 / US
10 / WANG, Xiaojie
San Diego, California 92121-1714 / US
11 / SUN, Jing
San Diego, California 92121-1714 / US
12 / GUPTA, Piyush
San Diego, California 92121-1714 / US
13 / OZTURK, Ozcan
San Diego, California 92121-1714 / US
14 / MARSH, Gene Wesley
San Diego, California 92121-1714 / US
 [2023/47]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[2023/47]
Application number, filing date22701870.211.01.2022
[2023/47]
WO2022US70134
Priority number, dateUS20211714821313.01.2021         Original published format: US202117148213
[2023/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2022155638
Date:21.07.2022
Language:EN
[2022/29]
Type: A1 Application with search report 
No.:EP4278790
Date:22.11.2023
Language:EN
The application published by WIPO in one of the EPO official languages on 21.07.2022 takes the place of the publication of the European patent application.
[2023/47]
Search report(s)International search report - published on:EP21.07.2022
ClassificationIPC:H04W72/04
[2023/47]
CPC:
H04W72/046 (EP); H04W72/20 (US); H04W76/14 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/47]
TitleGerman:RESSOURCENAUSWAHL IN EINEM ANKER-CLIENT-NETZWERK[2023/47]
English:RESOURCE SELECTION IN AN ANCHOR-CLIENT NETWORK[2023/47]
French:SÉLECTION DE RESSOURCES DANS UN RÉSEAU D'ANCRAGE-CLIENT[2023/47]
Entry into regional phase18.05.2023National basic fee paid 
18.05.2023Designation fee(s) paid 
18.05.2023Examination fee paid 
Examination procedure18.05.2023Examination requested  [2023/47]
18.05.2023Date on which the examining division has become responsible
12.02.2024Amendment by applicant (claims and/or description)
Fees paidRenewal fee
10.11.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XA]US2015249979  (KIM JOON BEOM [US], et al) [X] 23-30 * abstract * * paragraph [0033] * * paragraph [0048] * [A] 1-22;
 [A]WO2020030162  (ZTE CORP [CN]) [A] 1-30 * abstract ** paragraph [0159] - paragraph [0160] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.