| EP4263189 - PRODUCTION SYSTEM, METHOD AND COMPUTER PROGRAM PRODUCT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.07.2025 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 08.08.2024 | ||
| Former | Grant of patent is intended Status updated on 21.04.2024 | ||
| Former | Request for examination was made Status updated on 22.09.2023 | ||
| Former | The international publication has been made Status updated on 12.08.2022 | ||
| Former | unknown Status updated on 20.02.2022 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): BE | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy A/S Borupvej 16 7330 Brande / DK | [2023/43] | Inventor(s) | 01 /
KASER, Kenneth Lee Huntington Beach, CA 92647 / US | 02 /
LUECHT, Daniel 22081 Hamburg / DE | 03 /
GÜLINK, Hendrik 22399 Hamburg / DE | 04 /
MAINSTONE, Fionnan Theodore 21037 Hamburg / DE | 05 /
STEGE, Jason 7100 Vejle / DK | 06 /
SVENDSEN, Bjarne Haahr 9000 Aalborg / DK | [2023/43] | Representative(s) | SGRE-Association Siemens Energy Global GmbH & Co. KG SE I IM P Intellectual Property Siemenspromenade 9 91058 Erlangen / DE | [2024/37] |
| Former [2023/43] | SGRE-Association Siemens Gamesa Renewable Energy GmbH & Co KG Schlierseestraße 28 81539 München / DE | Application number, filing date | 22703635.7 | 03.02.2022 | [2023/43] | WO2022EP52596 | Priority number, date | EP20210382093 | 04.02.2021 Original published format: EP 21382093 | [2023/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2022167531 | Date: | 11.08.2022 | Language: | EN | [2022/32] | Type: | A1 Application with search report | No.: | EP4263189 | Date: | 25.10.2023 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.08.2022 takes the place of the publication of the European patent application. | [2023/43] | Type: | B1 Patent specification | No.: | EP4263189 | Date: | 11.09.2024 | Language: | EN | [2024/37] | Search report(s) | International search report - published on: | EP | 11.08.2022 | Classification | IPC: | B29C70/30, B29C70/54, B29D99/00, G01B11/00 | [2023/43] | CPC: |
B29C70/30 (EP,US);
B29D99/0025 (EP,US);
B29C70/54 (US);
B29C70/541 (EP);
G01B11/16 (US);
Y02P70/50 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | PRODUKTIONSSYSTEM, VERFAHREN UND COMPUTERPROGRAMMPRODUKT | [2023/43] | English: | PRODUCTION SYSTEM, METHOD AND COMPUTER PROGRAM PRODUCT | [2023/43] | French: | SYSTÈME DE PRODUCTION, PROCÉDÉ ET PRODUIT PROGRAMME INFORMATIQUE | [2024/20] |
| Former [2023/43] | SYSTÈME DE FABRICATION, PROCÉDÉ ET PRODUIT-PROGRAMME INFORMATIQUE | Entry into regional phase | 17.07.2023 | National basic fee paid | 17.07.2023 | Designation fee(s) paid | 17.07.2023 | Examination fee paid | Examination procedure | 17.07.2023 | Examination requested [2023/43] | 17.07.2023 | Date on which the examining division has become responsible | 16.01.2024 | Amendment by applicant (claims and/or description) | 22.04.2024 | Communication of intention to grant the patent | 31.07.2024 | Fee for grant paid | 31.07.2024 | Fee for publishing/printing paid | 31.07.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 12.06.2025 | No opposition filed within time limit [2025/34] | Fees paid | Renewal fee | 29.02.2024 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 11.09.2024 | BG | 11.09.2024 | CZ | 11.09.2024 | EE | 11.09.2024 | FI | 11.09.2024 | HR | 11.09.2024 | LV | 11.09.2024 | MC | 11.09.2024 | RO | 11.09.2024 | SK | 11.09.2024 | SM | 11.09.2024 | NO | 11.12.2024 | RS | 11.12.2024 | GR | 12.12.2024 | IS | 11.01.2025 | LU | 03.02.2025 | BE | 28.02.2025 | CH | 28.02.2025 | [2026/09] |
| Former [2025/48] | AT | 11.09.2024 | |
| BG | 11.09.2024 | ||
| CZ | 11.09.2024 | ||
| EE | 11.09.2024 | ||
| FI | 11.09.2024 | ||
| HR | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| MC | 11.09.2024 | ||
| RO | 11.09.2024 | ||
| SK | 11.09.2024 | ||
| SM | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| RS | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| IS | 11.01.2025 | ||
| LU | 03.02.2025 | ||
| CH | 28.02.2025 | ||
| Former [2025/47] | AT | 11.09.2024 | |
| BG | 11.09.2024 | ||
| CZ | 11.09.2024 | ||
| EE | 11.09.2024 | ||
| FI | 11.09.2024 | ||
| HR | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| MC | 11.09.2024 | ||
| RO | 11.09.2024 | ||
| SK | 11.09.2024 | ||
| SM | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| RS | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| IS | 11.01.2025 | ||
| LU | 03.02.2025 | ||
| Former [2025/43] | AT | 11.09.2024 | |
| BG | 11.09.2024 | ||
| CZ | 11.09.2024 | ||
| EE | 11.09.2024 | ||
| FI | 11.09.2024 | ||
| HR | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| MC | 11.09.2024 | ||
| RO | 11.09.2024 | ||
| SK | 11.09.2024 | ||
| SM | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| RS | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| IS | 11.01.2025 | ||
| Former [2025/23] | AT | 11.09.2024 | |
| BG | 11.09.2024 | ||
| CZ | 11.09.2024 | ||
| EE | 11.09.2024 | ||
| FI | 11.09.2024 | ||
| HR | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| RO | 11.09.2024 | ||
| SK | 11.09.2024 | ||
| SM | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| RS | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| IS | 11.01.2025 | ||
| Former [2025/11] | BG | 11.09.2024 | |
| FI | 11.09.2024 | ||
| HR | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| RS | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| Former [2025/09] | BG | 11.09.2024 | |
| FI | 11.09.2024 | ||
| LV | 11.09.2024 | ||
| NO | 11.12.2024 | ||
| GR | 12.12.2024 | ||
| Former [2025/08] | FI | 11.09.2024 | |
| NO | 11.12.2024 | ||
| GR | 12.12.2024 | Cited in | International search | [XI] EP0470901 (AEROSPATIALE et al.) [X] 1-7,9-15 * column 1, lines 1-3; claim 1 * * column 2, line 48 - column 4, line 39; figures 1,2 *[I] 8 | [X] US6064429 (BELK JOHN HUNTLEY et al.) [X] 1-9,13-15 * claim 1 * * column 7, line 28 - line 30 * * column 7, line 34 - line 50; figure 11 * | [A] US2004021828 (EVANS CHARLES R et al.) [A] 1-15 * figures 1-5; claim 1 * | [A] ANONYMOUS: "Advanced rotor blade manufacturing using LAP's laser projection system COMPOSITE PRO", WINDFAIR ALL IN WIND, 15 September 2016 (2016-09-15), XP055556775, Retrieved from the Internet |