blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4324148

EP4324148 - MULTI-SLOT TRANSMISSION FOR MULTI-TRANSMISSION RECEPTION POINTS [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  19.01.2024
Database last updated on 12.07.2024
FormerThe international publication has been made
Status updated on  21.10.2022
Formerunknown
Status updated on  24.05.2022
Most recent event   Tooltip14.06.2024Change: Validation statespublished on 17.07.2024 [2024/29]
14.06.2024Change - extension statespublished on 17.07.2024 [2024/29]
Applicant(s)For all designated states
QUALCOMM INCORPORATED
ATTN: International IP Administration
5775 Morehouse Drive
San Diego, California 92121-1714 / US
[2024/08]
Inventor(s)01 / LY, Hung Dinh
San Diego, California 92121-1714 / US
02 / SRIDHARAN, Gokul
San Diego, California 92121-1714 / US
 [2024/08]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[2024/08]
Application number, filing date22723510.812.04.2022
[2024/08]
WO2022US24418
Priority number, dateUS20211722955913.04.2021         Original published format: US202117229559
[2024/08]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2022221277
Date:20.10.2022
Language:EN
[2022/42]
Type: A1 Application with search report 
No.:EP4324148
Date:21.02.2024
Language:EN
The application published by WIPO in one of the EPO official languages on 20.10.2022 takes the place of the publication of the European patent application.
[2024/08]
Search report(s)International search report - published on:EP20.10.2022
ClassificationIPC:H04L5/00, H04W72/04
[2024/08]
CPC:
H04L5/0044 (EP,KR); H04W72/1273 (KR,US); H04L5/0012 (EP,KR,US);
H04L5/0053 (EP,KR); H04W72/0446 (KR,US); H04W72/0453 (KR,US);
H04W72/535 (KR,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/08]
TitleGerman:MEHRSCHLITZÜBERTRAGUNG FÜR MEHRFACHSENDEEMPFANGSPUNKTE[2024/08]
English:MULTI-SLOT TRANSMISSION FOR MULTI-TRANSMISSION RECEPTION POINTS[2024/08]
French:TRANSMISSION À CRÉNEAUX MULTIPLES POUR POINTS DE RÉCEPTION À TRANSMISSIONS MULTIPLES[2024/08]
Entry into regional phase03.08.2023National basic fee paid 
03.08.2023Designation fee(s) paid 
03.08.2023Examination fee paid 
Examination procedure03.08.2023Examination requested  [2024/08]
03.08.2023Date on which the examining division has become responsible
21.05.2024Amendment by applicant (claims and/or description)
Fees paidRenewal fee
09.02.2024Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XI]US2020146034  (BAGHERI HOSSEIN [US], et al) [X] 1,9,17,25 * paragraph [0078] - paragraph [0094] * [I] 2-8,10-16,18-24,26-30;
 [XI]WO2020145368  (SHARP KK [JP], et al) [X] 1,2,4,6-10,12,14-18,20,22-26,28,30 * abstract * [I] 3,5,11,13,19,21,27,29;
 [XI]WO2020145772  (LG ELECTRONICS INC [KR]) [X] 1,9,17,25 * abstract * [I] 2-8,10-16,18-24,26-30;
 [P]EP3911074  (SHARP KK [JP], et al) [P] * paragraph [0213] - paragraph [0216] *;
 US2022132495  [ ] (BAE DUCKHYUN [KR], et al) [ ] * paragraph [0176] * * paragraph [0218] *;
 [XI]  - MODERATOR (NOKIA ET AL, "FL summary of TB processing over multi-slot PUSCH (AI 8.8.1.2)", vol. RAN WG1, no. e-Meeting; 20210125 - 20210205, (20210208), 3GPP DRAFT; R1-2102241, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_104-e/Docs/R1-2102241.zip R1-2102241 FL Summary of TB processing over multi-slot PUSCH.docx, (20210208), XP051977803 [X] 1,9,17,25 * Sect. 2.2.1: Ericsson contribution * [I] 2-8,10-16,18-24,26-30
 [XI]  - NOKIA, "Introduction of NR - U", vol. RAN WG1, no. Reno, USA; 20191118 - 20191122, (20191206), 3GPP DRAFT; R1-1913633, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: https://ftp.3gpp.org/tsg_ran/WG1_RL1/TSGR1_99/Docs/R1-1913633.zip R1- 1913633.docx, (20191206), XP051838410 [X] 1,9,17,25 * Sect.s 6.1.2.3.1 and 6.3 * [I] 2-8,10-16,18-24,26-30
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.