blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4280227

EP4280227 - CONTROL ROD ABSORBER ASSEMBLY, CONTROL ROD AND CONTROL ROD ASSEMBLY [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  20.10.2023
Database last updated on 11.09.2024
FormerThe international publication has been made
Status updated on  12.08.2022
Most recent event   Tooltip14.06.2024Change - classificationpublished on 17.07.2024  [2024/29]
14.06.2024Change - classificationpublished on 17.07.2024  [2024/29]
Applicant(s)For all designated states
China Nuclear Power Technology Research Institute Co., Ltd
Room 1502-1504, 1506, Floor 15
Science Building, West Shangbu Zhong Road
Futian District
Shenzhen, Guangdong 518031 / CN
For all designated states
China General Nuclear Power Corporation
33 Floor, South Building
CGN Tower
2002, Shennan Boulevard
Futian District
Shenzhen, Guangdong 518028 / CN
For all designated states
China Nuclear Power Engineering Company Ltd.
Engineering Company Office Building
Daya Bay Nuclear Power Base
Pengfei Road
Dapeng New District
Shenzen, Gaungdong 518000 / CN
For all designated states
CGN Power Co., Ltd.
18/F South Building
CGN Tower
2002, Shennan Boulevard
Futian District
Shenzen, Guangdong 518028 / CN
[2023/47]
Inventor(s)01 / XUE, Zhe
Shenzhen, Guangdong 518031 / CN
02 / PANG, Zhengzheng
Shenzhen, Guangdong 518031 / CN
03 / LI, Weicai
Shenzhen, Guangdong 518031 / CN
 [2023/47]
Representative(s)Westphal, Mussgnug & Partner, Patentanwälte mbB
Werinherstraße 79
81541 München / DE
[2023/47]
Application number, filing date22748792.305.01.2022
[2023/47]
WO2022CN70364
Priority number, dateCN20211017097008.02.2021         Original published format: CN202110170970
[2023/47]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2022166513
Date:11.08.2022
Language:ZH
[2022/32]
Type: A1 Application with search report 
No.:EP4280227
Date:22.11.2023
Language:EN
[2023/47]
Search report(s)International search report - published on:CN11.08.2022
ClassificationIPC:G21C7/103, G21C7/10, G21C7/11, G21C7/117
[2024/29]
CPC:
G21C7/103 (EP,CN); G21C7/10 (CN); G21C7/11 (CN);
G21C7/117 (EP); Y02E30/30 (EP)
Former IPC [2023/47]G21C7/103, G21C7/10, G21C7/11
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/47]
TitleGerman:ABSORBERANORDNUNG FÜR STEUERSTAB, STEUERSTAB UND STEUERSTABANORDNUNG[2023/47]
English:CONTROL ROD ABSORBER ASSEMBLY, CONTROL ROD AND CONTROL ROD ASSEMBLY[2023/47]
French:ENSEMBLE ABSORBEUR DE TIGE DE COMMANDE, TIGE DE COMMANDE ET ENSEMBLE TIGE DE COMMANDE[2023/47]
Entry into regional phase14.08.2023Translation filed 
14.08.2023National basic fee paid 
14.08.2023Search fee paid 
14.08.2023Designation fee(s) paid 
14.08.2023Examination fee paid 
Examination procedure14.08.2023Examination requested  [2023/47]
Fees paidRenewal fee
14.08.2023Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]EP0364910  (BBC REAKTOR GMBH [DE]);
 [XY]US2001033632  (MURAKAMI KAZUO [JP], et al);
 [Y]US2009034674  (BURGER JOSEPH M [US], et al);
 [Y]CN103971760  (CHINA NUCLEAR POWER TECHNOLOGY RES INST CO LTD, et al);
 [Y]CN110752044  (NUCLEAR POWER INST CHINA);
 [PX]CN113012828  (CHINA NUCLEAR POWER INST CO LTD, et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.