blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4236500

EP4236500 - BEAM MANAGEMENT USING SYNCHRONIZATION SIGNALS THROUGH CHANNEL FEEDBACK FRAMEWORK [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  28.07.2023
Database last updated on 17.07.2024
Most recent event   Tooltip17.04.2024Amendment by applicant 
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2023/35]
Inventor(s)01 / SUBRAMANIAN, Sundar
San Diego, CA, 92121-1714 / US
02 / WANG, Xiao Feng
San Diego, CA, 92121-1714 / US
03 / LI, Junyi
San Diego, CA, 92121-1714 / US
04 / CEZANNE, Juergen
San Diego, CA, 92121-1714 / US
05 / SAMPATH, Ashwin
Skillman, NJ, 08558 / US
 [2023/35]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2023/35]
Application number, filing date23177631.103.04.2018
[2023/35]
Priority number, dateUS201762481658P04.04.2017         Original published format: US 201762481658 P
US20181594358602.04.2018         Original published format: US201815943586
[2023/35]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP4236500
Date:30.08.2023
Language:EN
[2023/35]
Type: A3 Search report 
No.:EP4236500
Date:18.10.2023
Language:EN
[2023/42]
Search report(s)(Supplementary) European search report - dispatched on:EP15.09.2023
ClassificationIPC:H04B7/06, H04L5/00, H04L25/02, H04W56/00
[2023/42]
CPC:
H04B7/0619 (EP); H04B7/06952 (KR); H04B7/0626 (CN,KR,US);
H04B17/328 (KR); H04B7/0408 (CN); H04B7/0608 (US);
H04B7/0617 (CN); H04B7/063 (EP,US); H04B7/0632 (EP,CN);
H04B7/0643 (EP); H04B7/0695 (EP,CN,US); H04L25/0224 (EP,US);
H04L5/0048 (EP,KR,US); H04W24/08 (KR); H04W24/10 (CN,KR,US);
H04W56/001 (KR); H04W56/0015 (EP,CN,US); H04W72/23 (KR);
H04L5/0023 (EP,US); H04L5/0053 (EP,US) (-)
Former IPC [2023/35]H04W56/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/35]
TitleGerman:STRAHLVERWALTUNG UNTER VERWENDUNG VON SYNCHRONISATIONSSIGNALEN DURCH KANALRÜCKMELDUNGSRAHMEN[2023/35]
English:BEAM MANAGEMENT USING SYNCHRONIZATION SIGNALS THROUGH CHANNEL FEEDBACK FRAMEWORK[2023/35]
French:GESTION DE FAISCEAU UTILISANT DES SIGNAUX DE SYNCHRONISATION PAR L'INTERMÉDIAIRE D'UNE STRUCTURE DE RÉTROACTION DE CANAL[2023/35]
Examination procedure06.06.2023Examination requested  [2023/35]
16.04.2024Amendment by applicant (claims and/or description)
16.04.2024Date on which the examining division has become responsible
Parent application(s)   TooltipEP18719735.5  / EP3607666
Fees paidRenewal fee
06.06.2023Renewal fee patent year 03
06.06.2023Renewal fee patent year 04
06.06.2023Renewal fee patent year 05
06.06.2023Renewal fee patent year 06
18.03.2024Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US2013301454  (SEOL JI-YUN [KR], et al) [A] 1-15 * paragraph [0037] - paragraph [0042] * * paragraph [0068] - paragraph [0080] * * paragraph [0097] - paragraph [0104] *;
 [XI]US2016087706  (GUEY JIANN-CHING [TW], et al) [X] 1-3,5-15 * abstract * * paragraph [0002] * * paragraph [0051] - paragraph [0052] * * paragraph [0059] * * paragraph [0061] * * paragraph [0068] * * paragraph [0076] - paragraph [0078] * [I] 4;
 [XI]  - QUALCOMM, "Beam management for NR", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1705581_BEAM_MANAGEMENT_FOR_NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051243709 [X] 1-3,5-15 * 1. Introduction * * 2. SS and periodic CSI-RS for beam discovery and monitoring * * 3. Details of reports on SS and beam swept CSI-RS for beam management * [I] 4
 [XI]  - ERICSSON, "RS for beam management", vol. RAN WG1, no. Reno, Nevada; 20161114 - 20161118, (20161105), 3GPP DRAFT; R1-1612346 RS FOR BEAM MANAGEMENT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_87/Docs/, (20161105), XP051190406 [X] 1-3,5-15 * 1. Introduction * * 2. Discussion * * 2.2 Mobility Reference Signal (MRS) for Beam Management * [I] 4
 [XI]  - ZTE ET AL, "Discussion on beam recovery mechanism", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1704400 DISCUSSION ON BEAM RECOVERY MECHANISM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051242548 [X] 1-3,5-15 * 1. Introduction * * 2. Beam monitoring * * 4. Triggering condition * [I] 4
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.