EP4236500 - BEAM MANAGEMENT USING SYNCHRONIZATION SIGNALS THROUGH CHANNEL FEEDBACK FRAMEWORK [Right-click to bookmark this link] | Status | Request for examination was made Status updated on 28.07.2023 Database last updated on 17.07.2024 | Most recent event Tooltip | 17.04.2024 | Amendment by applicant | Applicant(s) | For all designated states QUALCOMM Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2023/35] | Inventor(s) | 01 /
SUBRAMANIAN, Sundar San Diego, CA, 92121-1714 / US | 02 /
WANG, Xiao Feng San Diego, CA, 92121-1714 / US | 03 /
LI, Junyi San Diego, CA, 92121-1714 / US | 04 /
CEZANNE, Juergen San Diego, CA, 92121-1714 / US | 05 /
SAMPATH, Ashwin Skillman, NJ, 08558 / US | [2023/35] | Representative(s) | Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2023/35] | Application number, filing date | 23177631.1 | 03.04.2018 | [2023/35] | Priority number, date | US201762481658P | 04.04.2017 Original published format: US 201762481658 P | US201815943586 | 02.04.2018 Original published format: US201815943586 | [2023/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP4236500 | Date: | 30.08.2023 | Language: | EN | [2023/35] | Type: | A3 Search report | No.: | EP4236500 | Date: | 18.10.2023 | Language: | EN | [2023/42] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.09.2023 | Classification | IPC: | H04B7/06, H04L5/00, H04L25/02, H04W56/00 | [2023/42] | CPC: |
H04B7/0619 (EP);
H04B7/06952 (KR);
H04B7/0626 (CN,KR,US);
H04B17/328 (KR);
H04B7/0408 (CN);
H04B7/0608 (US);
H04B7/0617 (CN);
H04B7/063 (EP,US);
H04B7/0632 (EP,CN);
H04B7/0643 (EP);
H04B7/0695 (EP,CN,US);
H04L25/0224 (EP,US);
H04L5/0048 (EP,KR,US);
H04W24/08 (KR);
H04W24/10 (CN,KR,US);
H04W56/001 (KR);
H04W56/0015 (EP,CN,US);
H04W72/23 (KR);
|
Former IPC [2023/35] | H04W56/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2023/35] | Title | German: | STRAHLVERWALTUNG UNTER VERWENDUNG VON SYNCHRONISATIONSSIGNALEN DURCH KANALRÜCKMELDUNGSRAHMEN | [2023/35] | English: | BEAM MANAGEMENT USING SYNCHRONIZATION SIGNALS THROUGH CHANNEL FEEDBACK FRAMEWORK | [2023/35] | French: | GESTION DE FAISCEAU UTILISANT DES SIGNAUX DE SYNCHRONISATION PAR L'INTERMÉDIAIRE D'UNE STRUCTURE DE RÉTROACTION DE CANAL | [2023/35] | Examination procedure | 06.06.2023 | Examination requested [2023/35] | 16.04.2024 | Amendment by applicant (claims and/or description) | 16.04.2024 | Date on which the examining division has become responsible | Parent application(s) Tooltip | EP18719735.5 / EP3607666 | Fees paid | Renewal fee | 06.06.2023 | Renewal fee patent year 03 | 06.06.2023 | Renewal fee patent year 04 | 06.06.2023 | Renewal fee patent year 05 | 06.06.2023 | Renewal fee patent year 06 | 18.03.2024 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [A]US2013301454 (SEOL JI-YUN [KR], et al) [A] 1-15 * paragraph [0037] - paragraph [0042] * * paragraph [0068] - paragraph [0080] * * paragraph [0097] - paragraph [0104] *; | [XI]US2016087706 (GUEY JIANN-CHING [TW], et al) [X] 1-3,5-15 * abstract * * paragraph [0002] * * paragraph [0051] - paragraph [0052] * * paragraph [0059] * * paragraph [0061] * * paragraph [0068] * * paragraph [0076] - paragraph [0078] * [I] 4; | [XI] - QUALCOMM, "Beam management for NR", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1705581_BEAM_MANAGEMENT_FOR_NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051243709 [X] 1-3,5-15 * 1. Introduction * * 2. SS and periodic CSI-RS for beam discovery and monitoring * * 3. Details of reports on SS and beam swept CSI-RS for beam management * [I] 4 | [XI] - ERICSSON, "RS for beam management", vol. RAN WG1, no. Reno, Nevada; 20161114 - 20161118, (20161105), 3GPP DRAFT; R1-1612346 RS FOR BEAM MANAGEMENT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_87/Docs/, (20161105), XP051190406 [X] 1-3,5-15 * 1. Introduction * * 2. Discussion * * 2.2 Mobility Reference Signal (MRS) for Beam Management * [I] 4 | [XI] - ZTE ET AL, "Discussion on beam recovery mechanism", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1704400 DISCUSSION ON BEAM RECOVERY MECHANISM, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051242548 [X] 1-3,5-15 * 1. Introduction * * 2. Beam monitoring * * 4. Triggering condition * [I] 4 |