blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4336696

EP4336696 - DATA CENTER BALANCE OF PLANT INTEGRATED INTO FUEL CELL SYSTEM DESIGN [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  20.09.2024
Database last updated on 07.10.2024
FormerThe application has been published
Status updated on  09.02.2024
Most recent event   Tooltip20.09.2024The date on which the examining division becomes responsible, has been established 
20.09.2024Request for examination filedpublished on 23.10.2024 [2024/43]
20.09.2024Change - designated statespublished on 23.10.2024 [2024/43]
Applicant(s)For all designated states
Google LLC
1600 Amphitheatre Parkway
Mountain View, CA 94043 / US
[2024/11]
Inventor(s)01 / CHHIBA, Priya
Mountain View, 94043 / US
02 / SUBRAMANIAN, Hariharan
Mountain View, 94043 / US
03 / SAKALKAR, Varun
Mountain View, 94043 / US
04 / KOWALSKI, Thomas
Mountain View, 94043 / US
05 / SANDHU, Angad
Mountain View, 94043 / US
 [2024/11]
Representative(s)Betten & Resch
Patent- und Rechtsanwälte PartGmbB
Maximiliansplatz 14
80333 München / DE
[2024/11]
Application number, filing date23186175.818.07.2023
[2024/11]
Priority number, dateUS202263401287P26.08.2022         Original published format: US 202263401287 P
US20231819889618.05.2023         Original published format: US202318198896
[2024/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP4336696
Date:13.03.2024
Language:EN
[2024/11]
Search report(s)(Supplementary) European search report - dispatched on:EP13.02.2024
ClassificationIPC:H02J3/32, H02J3/38
[2024/11]
CPC:
H02J3/32 (EP); H01M8/04029 (US); G06F1/189 (US);
G06F1/206 (US); H01M8/04208 (US); H01M8/1018 (US);
H02J3/381 (EP); H05K7/2079 (US); H01M2008/1095 (US);
H01M2250/10 (US); H02J15/008 (EP); H02J2300/30 (EP);
H02J2310/16 (EP); Y02B90/10 (EP); Y02E60/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   ME,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2024/43]
Former [2024/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  ME,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:DATENZENTRUMSBALANCE EINER IN EIN BRENNSTOFFZELLENSYSTEMDESIGN INTEGRIERTEN ANLAGE[2024/11]
English:DATA CENTER BALANCE OF PLANT INTEGRATED INTO FUEL CELL SYSTEM DESIGN[2024/11]
French:BALANCE DE CENTRE DE DONNÉES D'UNE INSTALLATION INTÉGRÉE DANS UNE CONCEPTION DE SYSTÈME DE PILE À COMBUSTIBLE[2024/11]
Examination procedure13.09.2024Amendment by applicant (claims and/or description)
13.09.2024Examination requested  [2024/43]
13.09.2024Date on which the examining division has become responsible
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2004265662  (BRIGNONE CYRIL [FR], et al) [X] 1,9 * paragraph [0024] - paragraph [0053] *;
 [XI]US2013163192  (BALLANTINE ARNE [US], et al) [X] 1,6-9,13-15 * paragraph [0008] - paragraph [0127] * [I] 5,12;
 [XI]US2018316030  (CADER TAHIR [US], et al) [X] 1-4,8-11,15 * paragraph [0016] - paragraph [0047] * [I] 5,12;
 [A]  - GUIZZI GIUSEPPE LEO ET AL, "Fuel cell-based cogeneration system covering data centers' energy needs", ENERGY, AMSTERDAM, NL, vol. 41, no. 1, doi:10.1016/j.energy.2011.07.030, ISSN 0360-5442, (20120501), pages 56 - 64, URL: https://art.torvergata.it/bitstream/2108/51234/13/EGY_2012_3707_accepted_manuscript.pdf, (20240122), XP093122015 [A] 1-15 * page 59 - page 62; figure 3 *

DOI:   http://dx.doi.org/10.1016/j.energy.2011.07.030
 [A]  - JONATHAN J DOGTEROM ET AL, "Powering Change with Fuel Cells in the Telecommunication Industry", TELECOMMUNICATIONS CONFERENCE, 2005. INTELEC '05. TWENTY-SEVENTH INTERNATIONAL, IEEE, PI, (20050901), ISBN 978-3-8007-2905-0, pages 401 - 405, XP031063318 [A] 1-15 * page 402 - page 402 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.