blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0175802

EP0175802 - High power step-up transmission [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.03.1990
Database last updated on 02.08.2024
Most recent event   Tooltip28.03.1990No opposition filed within time limitpublished on 16.05.1990 [1990/20]
Applicant(s)For all designated states
Braren, Rudolf
Connollystrasse 26/7
D-8000 München 40 / DE
[1986/14]
Inventor(s)01 / see applicant
...
[1986/14]
Representative(s)Flügel, Otto, et al
Flügel Preissner Kastel, Postfach 81 05 06
81905 München / DE
[N/P]
Former [1989/05]Flügel, Otto, Dipl.-Ing., et al
Lesser & Flügel, Postfach 81 05 06
D-81905 München / DE
Former [1986/14]Flügel, Otto, Dipl.-Ing.
Lesser, Flügel & Säger Patentanwälte Richard-Strauss-Strasse 56 Postfach 81 05 40
D-8000 München 80 / DE
Application number, filing date84111381.424.09.1984
[1986/14]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0175802
Date:02.04.1986
Language:DE
[1986/14]
Type: B1 Patent specification 
No.:EP0175802
Date:24.05.1989
Language:DE
[1989/21]
Search report(s)(Supplementary) European search report - dispatched on:EP19.06.1985
ClassificationIPC:F16H1/22, F16H13/02, F03D11/02
[1986/14]
CPC:
F16H13/02 (EP); F03D15/15 (EP,US); F03D15/00 (EP);
F16H1/22 (EP); F05B2260/40311 (EP); Y02E10/72 (EP)
Designated contracting statesDE,   GB [1986/25]
Former [1986/14]AT,  BE,  CH,  DE,  FR,  GB,  IT,  LI,  LU,  NL,  SE 
TitleGerman:Getriebe für die Übertragung extrem hoher Leistungen mit grossem Übersetzungsverhältnis[1986/14]
English:High power step-up transmission[1986/14]
French:Transmission de puissance à grand rapport de surmultiplication[1986/14]
File destroyed:03.03.2001
Examination procedure26.11.1985Loss of particular rights, legal effect: designated state(s)
09.01.1986Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, FR, IT, LU, NL, SE
30.09.1986Examination requested  [1986/49]
04.12.1987Despatch of a communication from the examining division (Time limit: M06)
14.06.1988Reply to a communication from the examining division
08.08.1988Despatch of communication of intention to grant (Approval: Yes)
30.11.1988Communication of intention to grant the patent
03.03.1989Fee for grant paid
03.03.1989Fee for publishing/printing paid
Opposition(s)27.02.1990No opposition filed within time limit [1990/20]
Fees paidRenewal fee
30.09.1986Renewal fee patent year 03
22.09.1987Renewal fee patent year 04
29.09.1988Renewal fee patent year 05
Penalty fee
Penalty fee Rule 85a EPC 1973
24.09.1985AT   M02   Not yet paid
24.09.1985BE   M02   Not yet paid
24.09.1985CH   M02   Not yet paid
24.09.1985FR   M02   Not yet paid
24.09.1985IT   M02   Not yet paid
24.09.1985LU   M02   Not yet paid
24.09.1985NL   M02   Not yet paid
24.09.1985SE   M02   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US1666361  (LAURENCE THOMPSON);
 [X]DE843782  (BUECHI ALFRED);
 [A]US3122932  ;
 [A]US3667319  (SCHEITER MILTON H);
 [AD]FR2278022  (BRAREN RUDOLF [DE]);
 [X]DE2528527  (VATTEROTT KARL HEINZ DIPL ING)
ExaminationEP0118358
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.