blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0171617

EP0171617 - Method and device to operate an indirect converter with limitation of the surge current [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.07.1989
Database last updated on 05.10.2024
Most recent event   Tooltip24.07.1989No opposition filed within time limitpublished on 13.09.1989 [1989/37]
Applicant(s)For all designated states
SIEMENS AKTIENGESELLSCHAFT
Werner-von-Siemens-Str. 1
DE-80333 München / DE
[N/P]
Former [1986/08]For all designated states
SIEMENS AKTIENGESELLSCHAFT
Wittelsbacherplatz 2
D-80333 München / DE
Inventor(s)01 / Blaschke, Felix, Dr.
Steinforststrasse 19
D-8520 Erlangen / DE
[1986/08]
Application number, filing date85108740.312.07.1985
[1986/08]
Priority number, dateDE1984342784127.07.1984         Original published format: DE 3427841
[1986/08]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0171617
Date:19.02.1986
Language:DE
[1986/08]
Type: B1 Patent specification 
No.:EP0171617
Date:28.09.1988
Language:DE
[1988/39]
Search report(s)(Supplementary) European search report - dispatched on:EP18.12.1985
ClassificationIPC:H02P7/628, H02P7/62
[1986/08]
CPC:
H02P21/10 (EP,US)
Designated contracting statesAT,   DE,   FR,   GB,   IT,   SE [1986/08]
TitleGerman:Verfahren und Vorrichtung zum Betrieb eines Zwischenkreisumrichters mit Stromanstiegsbegrenzung[1986/08]
English:Method and device to operate an indirect converter with limitation of the surge current[1986/08]
French:Méthode et dispositif pour l'exploitation d'un convertisseur indirect avec limitation de la montée de courant[1986/08]
Examination procedure07.03.1986Examination requested  [1986/19]
17.03.1987Despatch of a communication from the examining division (Time limit: M04)
04.06.1987Reply to a communication from the examining division
27.07.1987Despatch of a communication from the examining division (Time limit: M04)
12.10.1987Reply to a communication from the examining division
26.10.1987Despatch of a communication from the examining division (Time limit: M02)
09.11.1987Reply to a communication from the examining division
18.12.1987Despatch of communication of intention to grant (Approval: Yes)
09.03.1988Communication of intention to grant the patent
25.03.1988Fee for grant paid
25.03.1988Fee for publishing/printing paid
Opposition(s)29.06.1989No opposition filed within time limit [1989/37]
Fees paidRenewal fee
24.07.1987Renewal fee patent year 03
25.07.1988Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[AD]DE2144422  ;
 [A]US3824437  (BLASCHKE F);
 [A]DE3015144  (GEN ELECTRIC);
 [A]EP0084367  (HITACHI LTD [JP])
 [A]  - IEEE TRANSACTIONS ON INDUSTRY APPLICATION, Band IA-16, Nr. 2, März/April 1980, Seiten 193-202, IEEE, New York, US; L.H. WALKER et al.: "A high-performance controlled-current inverter drive"
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.