blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0239029

EP0239029 - End closure for shirred casing sticks and method for making the same [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.07.1991
Database last updated on 22.08.2024
Most recent event   Tooltip20.07.1991No opposition filed within time limitpublished on 11.09.1991 [1991/37]
Applicant(s)For all designated states
VISKASE CORPORATION
6855 West 65th Street
Chicago, Illinois 60638 / US
[1987/40]
Inventor(s)01 / Beardsly, Robert Alan
700 West Hale
Osceola, Arkansas / US
[1987/40]
Representative(s)Schwan, Gerhard
Schwan Schwan Schorer
Patentanwälte
Bauerstrasse 22
80796 München / DE
[N/P]
Former [1987/40]Schwan, Gerhard, Dipl.-Ing.
Elfenstrasse 32
D-81739 München / DE
Application number, filing date87104129.920.03.1987
[1987/40]
Priority number, dateUS1986084222521.03.1986         Original published format: US 842225
[1987/40]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP0239029
Date:30.09.1987
Language:EN
[1987/40]
Type: B1 Patent specification 
No.:EP0239029
Date:19.09.1990
Language:EN
[1990/38]
Search report(s)(Supplementary) European search report - dispatched on:EP05.08.1987
ClassificationIPC:A22C13/02
[1987/40]
CPC:
A22C13/0009 (EP,US)
Designated contracting statesBE,   DE,   ES,   FR,   GB [1987/40]
TitleGerman:Endverschluss für geraffte Schlauchhülle und Verfahren zu seiner Herstellung[1987/40]
English:End closure for shirred casing sticks and method for making the same[1987/40]
French:Obturateur d'extrémité pour boyau plissé et procédé pour sa fabrication[1987/40]
Examination procedure20.10.1987Examination requested  [1987/52]
17.04.1989Despatch of a communication from the examining division (Time limit: M04)
17.08.1989Reply to a communication from the examining division
27.12.1989Despatch of communication of intention to grant (Approval: Yes)
15.03.1990Communication of intention to grant the patent
08.05.1990Fee for grant paid
08.05.1990Fee for publishing/printing paid
Opposition(s)20.06.1991No opposition filed within time limit [1991/37]
Fees paidRenewal fee
29.03.1989Renewal fee patent year 03
12.03.1990Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]DE3339457  (BECKER & CO NATURINWERK [DE]);
 [A]EP0123933  (UNION CARBIDE CORP [US]);
 [AD]EP0114397  (HOECHST AG [DE]);
 [AD]US3383222  (ALSYS CLARENCE M, et al);
 [A]GB2070909  (DEVRO INC);
 [A]DE3416125  (UNION CARBIDE CORP [US]);
 [AD]US3892869  (SHERIDAN ARTHUR L, et al);
 [A]EP0129100  (TEE PAK INC [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.