| EP0259718 - Process for bonding together separate building elements [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.08.1991 Database last updated on 19.03.2026 | Most recent event Tooltip | 24.08.1991 | No opposition filed within time limit | published on 16.10.1991 [1991/42] | Applicant(s) | For all designated states MTU MOTOREN- UND TURBINEN-UNION MÜNCHEN GMBH Postfach 50 06 40 80976 München / DE | [N/P] |
| Former [1988/11] | For all designated states MTU MOTOREN- UND TURBINEN-UNION MÜNCHEN GMBH Postfach 50 06 40 D-80976 München / DE | Inventor(s) | 01 /
Nustede, Fritz Wehrstaudenstrasse 10 D-8047 Karlsfeld / DE | 02 /
Hanninger, Josef Tonnenweg 4 D-8061 Sixtnitgern / DE | 03 /
Schallinger, Josef Am Schwimmbad 2 D-8221 Vachendorf / DE | [1988/11] | Application number, filing date | 87112523.3 | 28.08.1987 | [1988/11] | Priority number, date | DE19863631154 | 12.09.1986 Original published format: DE 3631154 | [1988/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP0259718 | Date: | 16.03.1988 | Language: | DE | [1988/11] | Type: | A3 Search report | No.: | EP0259718 | Date: | 25.01.1989 | Language: | DE | [1989/04] | Type: | B1 Patent specification | No.: | EP0259718 | Date: | 24.10.1990 | Language: | DE | [1990/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.12.1988 | Classification | IPC: | B23K37/04, B23K11/30 | [1988/11] | CPC: |
B23K35/0205 (EP,US);
B23K11/002 (EP,US);
B23K11/11 (EP,US);
B23K11/30 (EP,US);
B23K11/3009 (EP,US);
B23K37/04 (EP,US);
| Designated contracting states | DE, FR, GB, IT, SE [1988/11] | Title | German: | Verfahren zum Zusammenfügen einzelner Bauelemente | [1988/11] | English: | Process for bonding together separate building elements | [1988/11] | French: | Procédé pour joindre ensemble des éléments de construction séparés | [1988/11] | Examination procedure | 17.02.1989 | Examination requested [1989/16] | 21.07.1989 | Despatch of a communication from the examining division (Time limit: M04) | 23.11.1989 | Reply to a communication from the examining division | 14.02.1990 | Despatch of communication of intention to grant (Approval: Yes) | 07.03.1990 | Communication of intention to grant the patent | 17.05.1990 | Fee for grant paid | 17.05.1990 | Fee for publishing/printing paid | Opposition(s) | 25.07.1991 | No opposition filed within time limit [1991/42] | Fees paid | Renewal fee | 21.08.1989 | Renewal fee patent year 03 | 21.08.1990 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | Examination | DIN ISO 1089 |