blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0305763

EP0305763 - Energy-delivering installation [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.05.1992
Database last updated on 14.09.2024
Most recent event   Tooltip14.05.1992No opposition filed within time limitpublished on 01.07.1992 [1992/27]
Applicant(s)For all designated states
MTU MOTOREN- UND TURBINEN-UNION MÜNCHEN GMBH
Postfach 50 06 40
80976 München / DE
[N/P]
Former [1989/10]For all designated states
MTU MOTOREN- UND TURBINEN-UNION MÜNCHEN GMBH
Postfach 50 06 40
D-80976 München / DE
Inventor(s)01 / Rohra, Alois
Bacherstr. 45
D-8000 München 90 / DE
02 / Albers, Martin, Dr.
Borinskistr. 2a
D-8000 München 60 / DE
03 / Weist, Günther
Lerchenweg 4c
D-8138 Andechs / DE
04 / Grieb, Hubert, Dr. Ing.
Nimrodstr. 38
D-8034 Germering / DE
05 / Moddemann, Horst
Im Alefoldchen 1
D-5340 Bad Honnef 6 / DE
[1989/10]
Application number, filing date88112754.205.08.1988
[1989/10]
Priority number, dateDE1987372610406.08.1987         Original published format: DE 3726104
[1989/10]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0305763
Date:08.03.1989
Language:DE
[1989/10]
Type: B1 Patent specification 
No.:EP0305763
Date:10.07.1991
Language:DE
[1991/28]
Search report(s)(Supplementary) European search report - dispatched on:EP22.12.1988
ClassificationIPC:F01D15/10, H02K7/18, F01D5/02
[1989/10]
CPC:
F02C7/24 (EP); B63G8/12 (EP); F01D15/10 (EP);
F02C3/34 (EP); F02C7/20 (EP); H02K7/1823 (EP)
Designated contracting statesDE,   FR,   GB,   IT,   NL,   SE [1989/17]
Former [1989/10]AT,  BE,  CH,  DE,  ES,  FR,  GB,  GR,  IT,  LI,  LU,  NL,  SE 
TitleGerman:Energieversorgungsanlage[1989/10]
English:Energy-delivering installation[1989/10]
French:Centrale de délivrance d'énergie[1989/10]
Examination procedure06.09.1988Loss of particular rights, legal effect: designated state(s)
05.12.1988Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, ES, GR, LI, LU
03.03.1989Examination requested  [1989/18]
22.02.1990Despatch of a communication from the examining division (Time limit: M04)
09.06.1990Reply to a communication from the examining division
12.12.1990Despatch of communication of intention to grant (Approval: Yes)
11.01.1991Communication of intention to grant the patent
22.03.1991Fee for grant paid
22.03.1991Fee for publishing/printing paid
Opposition(s)11.04.1992No opposition filed within time limit [1992/27]
Fees paidRenewal fee
21.08.1990Renewal fee patent year 03
Penalty fee
Penalty fee Rule 85a EPC 1973
05.09.1988AT   M02   Not yet paid
05.09.1988BE   M02   Not yet paid
05.09.1988CH   M02   Not yet paid
05.09.1988ES   M02   Not yet paid
05.09.1988GR   M02   Not yet paid
05.09.1988LU   M02   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]DE305955  ;
 [A]US3039007  (WILLIAMS ALFRED L W, et al);
 [A]DE2105494  (BABCOCK & WILCOX AG);
 [A]US2984751  (ROBERT CLIBORN);
 [A]EP0026584  (NEEDHAM ROBERT WILLIAMS [GB], et al);
 [A]GB191223689  (ROLFE ARTHUR [GB]);
 [A]FR534202  (LEBLANC VICKERS MAURICE SA [FR]);
 [A]GB1141001  (ROLLS ROYCE)
ExaminationWO8403538
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.