blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0463925

EP0463925 - Construction method adjacent to mountain side, of a semi-buried structure and thus realized structure [Right-click to bookmark this link]
StatusOpposition rejected
Status updated on  18.06.1999
Database last updated on 11.09.2024
Most recent event   Tooltip05.10.2005Change: Appeal number 
Applicant(s)For all designated states
Matière, Marcel
17, avenue Aristide Briand
F-15000 Aurillac / FR
[1992/01]
Inventor(s)01 / see applicant
...
[1992/01]
Representative(s)Phélip, Bruno, et al
Cabinet Harlé & Phélip 7, rue de Madrid
75008 Paris / FR
[N/P]
Former [1992/01]Phélip, Bruno, et al
c/o Cabinet Harlé & Phélip 21, rue de La Rochefoucauld
F-75009 Paris / FR
Application number, filing date91401620.917.06.1991
[1992/01]
Priority number, dateFR1990000787722.06.1990         Original published format: FR 9007877
[1992/01]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP0463925
Date:02.01.1992
Language:FR
[1992/01]
Type: B1 Patent specification 
No.:EP0463925
Date:23.08.1995
Language:FR
[1995/34]
Search report(s)(Supplementary) European search report - dispatched on:EP01.10.1991
ClassificationIPC:E01F7/04, E04B7/08
[1992/01]
CPC:
E04B7/08 (EP,US); E01F7/045 (EP,US)
Designated contracting statesAT,   BE,   CH,   DE,   DK,   ES,   GB,   GR,   IT,   LI,   LU,   NL,   SE [1992/01]
TitleGerman:Verfahren zur Herstellung eines halbunterirdischen Bauwerks an einem Bergabhang und auf diese Weise hergestelltes Bauwerk[1992/01]
English:Construction method adjacent to mountain side, of a semi-buried structure and thus realized structure[1992/01]
French:Procédé de réalisation, à flanc de montagne, d'une structure semi-enterrée et structure ainsi réalisée[1992/01]
Examination procedure11.06.1992Examination requested  [1992/32]
26.07.1993Despatch of a communication from the examining division (Time limit: M05)
23.12.1993Reply to a communication from the examining division
14.09.1994Despatch of communication of intention to grant (Approval: Yes)
30.11.1994Communication of intention to grant the patent
09.02.1995Fee for grant paid
09.02.1995Fee for publishing/printing paid
Opposition(s)Opponent(s)01  23.05.1996  07.06.1996  ADMISSIBLE
SOGEA S.A.
3, cours Ferdinand de Lesseps
92851 RUEIL-MALMAISON / FR
Opponent's representative
Derambure, Christian
BREESE DERAMBURE MAJEROWICZ
38, avenue de l'Opéra
75002 Paris / FR
 [N/P]
Former [1996/29]
Opponent(s)01  23.05.1996  07.06.1996  ADMISSIBLE
SOGEA S.A.
3, cours Ferdinand de Lesseps
92851 RUEIL-MALMAISON / FR
Opponent's representative
Derambure, Christian
BREESE DERAMBURE MAJEROWICZ 38, avenue de l'Opéra
75002 Paris / FR
10.07.1996Invitation to proprietor to file observations on the notice of opposition
11.02.1997Reply of patent proprietor to notice(s) of opposition
16.06.1998Date of oral proceedings
14.08.1998Despatch of minutes of oral proceedings
14.08.1998Date of despatch of rejection of opposition
28.04.1999Legal effect of rejection of opposition [1999/31]
Appeal following opposition12.10.1998Appeal received No.  T1010/98
14.12.1998Statement of grounds filed
28.04.1999Result of appeal procedure: appeal of the opponent withdrawn
Fees paidRenewal fee
10.05.1993Renewal fee patent year 03
18.04.1994Renewal fee patent year 04
26.06.1995Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipDK23.08.1995
GB23.08.1995
GR23.08.1995
NL23.08.1995
SE23.11.1995
DE24.11.1995
BE30.06.1996
LU30.06.1996
[2003/07]
Former [2000/05]DK23.08.1995
GB23.08.1995
GR23.08.1995
SE23.11.1995
DE24.11.1995
BE30.06.1996
LU30.06.1996
Former [1998/15]DK23.08.1995
GB23.08.1995
SE23.11.1995
DE24.11.1995
BE30.06.1996
Former [1997/25]GB23.08.1995
SE23.11.1995
DE24.11.1995
BE30.06.1996
Former [1996/30]GB23.08.1995
SE23.11.1995
DE24.11.1995
Former [1996/14]SE23.11.1995
DE24.11.1995
Documents cited:Search[A]FR510802  (PERRET FRERES);
 [AD]CH402919  (SARRASIN ALEXANDRE [CH], et al);
 [AD]US3282056  (FISHER CHRISTOPHER L);
 [A]EP0277399  (NIHON SAMICON COMPANY LIMITED [JP])
 [AD]  - STRASSE UND VERKEHR/ROUTE ET TRAFIC. no. 6, 2 Juin 1967, ZURICH CH pages 260 - 261; CH.CLEUSIX: 'route de la Forclaz '
 [A]  - STRASSE UND VERKEHR/ROUTE ET TRAFIC. no. 3, 11 Mars 1974, ZURICH CH pages 109 - 113; E.STUCKI ET AL: 'Steinschlaggalerie Güetli '
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.