blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0533138

EP0533138 - Switch [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  12.01.1996
Database last updated on 12.10.2024
Most recent event   Tooltip12.01.1996Application deemed to be withdrawnpublished on 28.02.1996 [1996/09]
Applicant(s)For all designated states
MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD.
1006, Oaza Kadoma Kadoma-shi Osaka
571-8501 / JP
[N/P]
Former [1993/12]For all designated states
MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD.
1006, Ohaza Kadoma
Kadoma-shi, Osaka-fu, 571 / JP
Inventor(s)01 / Aimi, Mitsuo
60-5, Nasuzukuri-Kitamachi
Hirakata City 573 / JP
[1993/12]
Representative(s)advotec.
Patent- und Rechtsanwaltspartnerschaft
Tappe mbB
Widenmayerstraße 4
80538 München / DE
[N/P]
Former [1993/12]Dr. Elisabeth Jung Dr. Jürgen Schirdewahn Dipl.-Ing. Claus Gernhardt
Postfach 40 14 68
D-80714 München / DE
Application number, filing date92115850.716.09.1992
[1993/12]
Priority number, dateJP1991023607317.09.1991         Original published format: JP 23607391
[1993/12]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0533138
Date:24.03.1993
Language:EN
[1993/12]
Type: A3 Search report 
No.:EP0533138
Date:02.06.1993
Language:EN
[1993/22]
Search report(s)(Supplementary) European search report - dispatched on:EP16.04.1993
ClassificationIPC:H01H1/58, H01H5/18
[1993/12]
CPC:
H01H1/5833 (EP); H01H5/18 (EP)
Designated contracting statesDE,   FR,   GB [1993/12]
TitleGerman:Schalter[1993/12]
English:Switch[1993/12]
French:Interrupteur[1993/12]
File destroyed:20.04.2002
Examination procedure16.09.1992Examination requested  [1993/12]
13.04.1995Despatch of a communication from the examining division (Time limit: M04)
23.08.1995Application deemed to be withdrawn, date of legal effect  [1996/09]
25.09.1995Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [1996/09]
Fees paidRenewal fee
29.09.1994Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
30.09.199504   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US3965316  ;
 [X]EP0024920
 [X]  - ENGINEERING vol. 224, no. 11, December 1984, LONDON GB page 870 'Combined springs create a versatile switch'
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.