EP0674568 - SAW ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.06.1998 Database last updated on 28.06.2024 | Most recent event Tooltip | 17.12.1999 | Lapse of the patent in a contracting state | published on 02.02.2000 [2000/05] | Applicant(s) | For all designated states HULTDIN INVEST AB Skolgatan 12 S-930 70 Mala / SE | [1995/40] | Inventor(s) | 01 /
ÖRNBERG, Rolf Box 71 S-930 70 Mal / SE | [1995/40] | Representative(s) | Lundquist, Lars-Olof L-O Lundquist Patentbyra AB Box 80 651 03 Karlstad / SE | [N/P] |
Former [1995/40] | Lundquist, Lars-Olof L-O Lundquist Patentbyra Box 80 S-651 03 Karlstad / SE | Application number, filing date | 92912411.3 | 08.05.1992 | [1995/40] | WO1992SE00300 | Filing language | SV | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO9323218 | Date: | 25.11.1993 | Language: | EN | [1993/28] | Type: | A1 Application with search report | No.: | EP0674568 | Date: | 04.10.1995 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.11.1993 takes the place of the publication of the European patent application. | [1995/40] | Type: | B1 Patent specification | No.: | EP0674568 | Date: | 30.07.1997 | Language: | EN | [1997/31] | Search report(s) | International search report - published on: | SE | 25.11.1993 | Classification | IPC: | B27B17/14, A01G23/08 | [1995/40] | CPC: |
A01G23/091 (EP,US);
B27B17/14 (EP,US);
Y10T83/7258 (EP,US)
| Designated contracting states | AT, BE, CH, DE, DK, ES, FR, GB, GR, IT, LI, NL, SE [1995/40] | Title | German: | SÄGENAUFBAU | [1995/40] | English: | SAW ASSEMBLY | [1995/40] | French: | ENSEMBLE SCIE | [1995/40] | Entry into regional phase | 25.11.1993 | Translation filed | 13.10.1994 | National basic fee paid | 13.10.1994 | Designation fee(s) paid | 13.10.1994 | Examination fee paid | Examination procedure | 11.11.1993 | Request for preliminary examination filed International Preliminary Examining Authority: DE | 13.10.1994 | Examination requested [1995/40] | 11.10.1996 | Despatch of communication of intention to grant (Approval: Yes) | 23.01.1997 | Communication of intention to grant the patent | 26.03.1997 | Fee for grant paid | 26.03.1997 | Fee for publishing/printing paid | Opposition(s) | 05.05.1998 | No opposition filed within time limit [1998/30] | Fees paid | Renewal fee | 13.10.1994 | Renewal fee patent year 03 | 12.05.1995 | Renewal fee patent year 04 | 08.05.1996 | Renewal fee patent year 05 | 20.05.1997 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | GR | 30.07.1997 | [2000/05] | Cited in | International search | [A]SU745440 ; | [A]US4382334 (REYNOLDS MICHAEL J) | [A] - DERWENT'S ABSTRACT No. C09 61 D/10; & SU,A,745440, publ. week 8110 (FOREST POWER MECHN INST)., & SU745440 A 00000000 |