blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0609565

EP0609565 - Two stage rocket whereby the second stage is decelerated by a parachute prior to ignition [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  22.11.1996
Database last updated on 12.07.2024
Most recent event   Tooltip22.11.1996Application deemed to be withdrawnpublished on 08.01.1997 [1997/02]
Applicant(s)For all designated states
Buck Werke GmbH & Co.
Geislinger Strasse 21
73337 Bad Überkingen / DE
[N/P]
Former [1994/32]For all designated states
Buck Werke GmbH & Co
Geislinger Strasse 21
D-73337 Bad Überkingen / DE
Inventor(s)01 / Badura, Wolfgang
Märzfeld 8
D-83435 Bad Reichenhall / DE
02 / Falter, Christian
Salzburger Strasse 27
D-83435 Bad Reichenhall / DE
[1994/32]
Representative(s)Goddar, Heinz J.
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[N/P]
Former [1994/32]Goddar, Heinz J., Dr.
FORRESTER & BOEHMERT Franz-Joseph-Strasse 38
D-80801 München / DE
Application number, filing date93121001.728.12.1993
[1994/32]
Priority number, dateDE1993430307603.02.1993         Original published format: DE 4303076
[1994/32]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP0609565
Date:10.08.1994
Language:DE
[1994/32]
Search report(s)(Supplementary) European search report - dispatched on:EP21.04.1994
ClassificationIPC:F42B10/56, F42B12/62
[1994/32]
CPC:
F42B10/56 (EP,US); F42B12/625 (EP,US)
Designated contracting statesCH,   DE,   FR,   GB,   IT,   LI,   SE [1994/32]
TitleGerman:Zweistufiger Flugkörper wobei die zweite Stufe durch einem Fallschirm von der Zündung abgebremst wird[1994/32]
English:Two stage rocket whereby the second stage is decelerated by a parachute prior to ignition[1994/32]
French:Fusée à deux étages dans laquelle le deuxième étage est décéleré par un parachute avant son allumage[1994/32]
File destroyed:20.04.2002
Examination procedure13.09.1994Examination requested  [1994/46]
07.03.1996Despatch of a communication from the examining division (Time limit: M04)
18.07.1996Application deemed to be withdrawn, date of legal effect  [1997/02]
14.08.1996Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [1997/02]
Fees paidRenewal fee
20.12.1995Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US3113752  (BRESTEL PLINY C) [A] 1 * column 3, line 25 - column 4, line 9 * * figures 1-5 *;
 [A]FR1398715  (LE DIRECTEUR GENERAL ET LE DIR) [A] 1 * page 2 * * figure - *;
 [A]US3221656  (SUTTEN ADRIAN P) [A] 1 * column 2, line 57 - column 4, line 11 * * figures 1-6 *;
 [YD]DE1578193  (OERLIKON BUEHRLE HOLDING AG) [YD] 1,2 * page 3, paragraph L - page 5, paragraph 1 * * figure - *;
 [AD]DE2144400  (RHEINMETALL GMBH);
 [Y]US3727861  (SWANN E) [Y] 1,2 * column 3, line 1 - column 4, line 9 * * figure - *;
 [AD]DE3937762  (DIEHL GMBH & CO [DE])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.