blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0576195

EP0576195 - Nuclear reactor reflector [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.07.1997
Database last updated on 14.09.2024
Most recent event   Tooltip18.07.1997No opposition filed within time limitpublished on 03.09.1997 [1997/36]
Applicant(s)For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building, Gateway Center Pittsburgh
Pennsylvania 15222 / US
[N/P]
Former [1993/52]For all designated states
WESTINGHOUSE ELECTRIC CORPORATION
Westinghouse Building Gateway Center
Pittsburgh Pennsylvania 15222 / US
Inventor(s)01 / Hopkins, Ronald Jacobs
8270 Strasbourg Road
Pensacola, FL 32514 / US
02 / Misvel, Michael C.
4572 Whisper Circle
Pensacola, FL 32504 / US
03 / Land, John Thomas
4020 Belvedere Drive
Pensacola, FL 32514 / US
[1993/52]
Representative(s)Van Berlyn, Ronald Gilbert
30 The Green Calne
Wiltshire SN11 8DJ / GB
[N/P]
Former [1993/52]van Berlyn, Ronald Gilbert
23, Centre Heights
London NW3 6JG / GB
Application number, filing date93304674.016.06.1993
[1993/52]
Priority number, dateUS1992090363424.06.1992         Original published format: US 903634
[1993/52]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP0576195
Date:29.12.1993
Language:EN
[1993/52]
Type: B1 Patent specification 
No.:EP0576195
Date:11.09.1996
Language:EN
[1996/37]
Search report(s)(Supplementary) European search report - dispatched on:EP15.10.1993
ClassificationIPC:G21C11/06
[1993/52]
CPC:
G21C11/06 (EP,US); Y02E30/30 (EP,US)
Designated contracting statesDE,   ES,   FR,   GB,   IT [1993/52]
TitleGerman:Kernreaktorreflektor[1993/52]
English:Nuclear reactor reflector[1993/52]
French:Reflecteur de réacteur nucléaire[1993/52]
Examination procedure29.06.1994Examination requested  [1994/34]
18.05.1995Despatch of a communication from the examining division (Time limit: M04)
22.09.1995Reply to a communication from the examining division
17.10.1995Despatch of communication of intention to grant (Approval: Yes)
11.01.1996Communication of intention to grant the patent
16.02.1996Fee for grant paid
16.02.1996Fee for publishing/printing paid
Opposition(s)12.06.1997No opposition filed within time limit [1997/36]
Fees paidRenewal fee
28.06.1995Renewal fee patent year 03
07.06.1996Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]EP0488890  (FRAMATOME SA [FR]);
 [Y]EP0323306  (FRAMATOME SA [FR]);
 [A]EP0367963  (WESTINGHOUSE ELECTRIC CORP [US]);
 [AD]US4849162  (GARNER DANIEL C [US], et al);
 [AD]EP0117168  (FRAMATOME & CIE [FR])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.