blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0780675

EP0780675 - Sensor and method of fabrication [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.12.2002
Database last updated on 03.09.2024
Most recent event   Tooltip06.12.2002No opposition filed within time limitpublished on 22.01.2003  [2003/04]
Applicant(s)For all designated states
MOTOROLA, INC.
1303 East Algonquin Road
Schaumburg, IL 60196 / US
[1997/26]
Inventor(s)01 / Mirza, Andrew
5426 E. Nisbet Road
Scottsdale, Arizona 85254 / US
02 / Seddon, Kenneth M.
1671 W. Houston Avenue
Gilbert, Arizona 85234 / US
[1997/26]
Representative(s)Hudson, Peter David, et al
Motorola
European Intellectual Property
Midpoint
Alencon Link, Basingstoke
Hampshire RG21 7PL / GB
[N/P]
Former [1997/26]Hudson, Peter David, et al
Motorola, European Intellectual Property, Midpoint, Alencon Link
Basingstoke, Hampshire RG21 1PL / GB
Application number, filing date96119688.809.12.1996
[1997/26]
Priority number, dateUS1995057594420.12.1995         Original published format: US 575944
[1997/26]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP0780675
Date:25.06.1997
Language:EN
[1997/26]
Type: B1 Patent specification 
No.:EP0780675
Date:30.01.2002
Language:EN
[2002/05]
Search report(s)(Supplementary) European search report - dispatched on:EP25.04.1997
ClassificationIPC:G01L9/06, G01L9/00
[1997/26]
CPC:
G01L9/0042 (EP,US); G01L9/0045 (EP,US)
Designated contracting statesDE,   FR,   GB,   NL [1997/26]
TitleGerman:Sensor und Herstellunsgverfahren dazu[1997/26]
English:Sensor and method of fabrication[1997/26]
French:Capteur et son procédé de fabrication[1997/26]
Examination procedure29.12.1997Examination requested  [1998/10]
07.05.1999Despatch of a communication from the examining division (Time limit: M04)
14.09.1999Reply to a communication from the examining division
29.12.1999Despatch of a communication from the examining division (Time limit: M06)
03.07.2000Reply to a communication from the examining division
18.01.2001Despatch of communication of intention to grant (Approval: Yes)
02.04.2001Communication of intention to grant the patent
12.07.2001Fee for grant paid
12.07.2001Fee for publishing/printing paid
Opposition(s)31.10.2002No opposition filed within time limit [2003/04]
Fees paidRenewal fee
04.01.1999Renewal fee patent year 03
05.01.2000Renewal fee patent year 04
07.12.2000Renewal fee patent year 05
07.12.2001Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]US5335550  (SATOU KIMITOSHI [JP]) [X] 1,3,4 * column 6, line 19 - column 7, line 8; figures 1-14 * [Y] 2,5,7-10;
 [Y]WO8606548  (WISCONSIN ALUMNI RES FOUND [US]) [Y] 9 * page 13, line 33 - page 14, line 14 *;
 [Y]JPS6413773  (NISSAN MOTOR) [Y] 2,5,7,8,10 * figures 1,2,3B *
ExaminationEP0747686
 EP0758080
 EP0811771
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.