blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0871781

EP0871781 - PROCESS FOR PRODUCING FOUNDRY IRON [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.05.2003
Database last updated on 14.06.2024
Most recent event   Tooltip17.02.2006Lapse of the patent in a contracting state
New state(s): FR
published on 05.04.2006  [2006/14]
Applicant(s)For all designated states
Alabama Power Company
500 North 18th Street
Birmingham, AL 35291 / US
[1998/43]
Inventor(s)01 / HENDRIX, Charles, F.
445 Chulavista Mountain Road
Pell City, AL 35125 / US
[1998/43]
Representative(s)Bartels und Partner, Patentanwälte
Lange Strasse 51
70174 Stuttgart / DE
[N/P]
Former [1998/43]Patentanwälte Bartels und Partner
Lange Strasse 51
70174 Stuttgart / DE
Application number, filing date96915821.101.05.1996
[1998/43]
WO1996US06935
Priority number, dateUS1995043184501.05.1995         Original published format: US 431845
[1998/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO9634988
Date:07.11.1996
Language:EN
[1996/49]
Type: A1 Application with search report 
No.:EP0871781
Date:21.10.1998
Language:EN
The application published by WIPO in one of the EPO official languages on 07.11.1996 takes the place of the publication of the European patent application.
[1998/43]
Type: B1 Patent specification 
No.:EP0871781
Date:24.07.2002
Language:EN
[2002/30]
Search report(s)International search report - published on:US07.11.1996
(Supplementary) European search report - dispatched on:EP01.07.1998
ClassificationIPC:C21B13/12, C21B13/14, C21C1/08, C21C5/52
[1998/43]
CPC:
H05B7/14 (EP,US); C21B13/12 (EP,KR,US); C21B11/10 (EP,US);
C21C1/08 (EP,US); C21C5/52 (EP,US); H05B7/07 (EP,US);
H05B7/102 (EP,US); H05B7/107 (EP,US); Y02P10/20 (EP,US);
Y02P10/25 (EP,US) (-)
Designated contracting statesAT,   BE,   CH,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [1998/43]
TitleGerman:VERFAHREN ZUR HERSTELLUNG VON GUSSEISEN[1998/43]
English:PROCESS FOR PRODUCING FOUNDRY IRON[1998/43]
French:PROCEDE POUR PRODUIRE DE LA FONTE DE MOULAGE[1998/43]
Entry into regional phase28.10.1997National basic fee paid 
12.02.1998Search fee paid 
28.10.1997Designation fee(s) paid 
25.11.1997Examination fee paid 
Examination procedure25.11.1996Request for preliminary examination filed
International Preliminary Examining Authority: US
25.11.1997Examination requested  [1998/43]
11.09.1998Amendment by applicant (claims and/or description)
26.10.1999Despatch of a communication from the examining division (Time limit: M06)
04.05.2000Reply to a communication from the examining division
15.03.2001Despatch of a communication from the examining division (Time limit: M04)
01.06.2001Reply to a communication from the examining division
18.10.2001Despatch of communication of intention to grant (Approval: Yes)
05.02.2002Communication of intention to grant the patent
08.05.2002Fee for grant paid
08.05.2002Fee for publishing/printing paid
Opposition(s)25.04.2003No opposition filed within time limit [2003/29]
Fees paidRenewal fee
30.04.1998Renewal fee patent year 03
11.03.1999Renewal fee patent year 04
03.05.2000Renewal fee patent year 05
11.05.2001Renewal fee patent year 06
30.04.2002Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT24.07.2002
BE24.07.2002
CH24.07.2002
FI24.07.2002
FR24.07.2002
GR24.07.2002
LI24.07.2002
NL24.07.2002
DK24.10.2002
PT24.10.2002
SE24.10.2002
ES30.01.2003
[2006/14]
Former [2004/04]AT24.07.2002
BE24.07.2002
CH24.07.2002
FI24.07.2002
GR24.07.2002
LI24.07.2002
NL24.07.2002
DK24.10.2002
PT24.10.2002
SE24.10.2002
ES30.01.2003
Former [2003/48]AT24.07.2002
BE24.07.2002
CH24.07.2002
FI24.07.2002
GR24.07.2002
LI24.07.2002
NL24.07.2002
DK24.10.2002
PT24.10.2002
SE24.10.2002
Former [2003/46]AT24.07.2002
CH24.07.2002
FI24.07.2002
GR24.07.2002
LI24.07.2002
NL24.07.2002
DK24.10.2002
PT24.10.2002
SE24.10.2002
Former [2003/31]AT24.07.2002
CH24.07.2002
FI24.07.2002
GR24.07.2002
LI24.07.2002
NL24.07.2002
PT24.10.2002
SE24.10.2002
Former [2003/22]FI24.07.2002
GR24.07.2002
NL24.07.2002
PT24.10.2002
SE24.10.2002
Former [2003/20]FI24.07.2002
GR24.07.2002
NL24.07.2002
SE24.10.2002
Former [2003/14]FI24.07.2002
NL24.07.2002
SE24.10.2002
Former [2003/09]NL24.07.2002
SE24.10.2002
Former [2003/03]SE24.10.2002
Documents cited:Search[A]US2775518  (UDY MARVIN J) [A] 1-35* figure -; claim - *;
 [A]US3715200  (ARCHIBALD F, et al) [A] 1-35 * figure -; example -; claim - *;
 [X]US3896257  (KINOSHITA SADAMU) [X] 1-35 * abstract *;
 [X]US3985545  (KINOSHITA SADAMU) [X] 1-35 * abstract *
International search[Y]US242219  ;
 [Y]US3768997  (BLISS N, et al);
 [Y]US4731112  (HOFFMAN GLENN E [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.