EP0871781 - PROCESS FOR PRODUCING FOUNDRY IRON [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.05.2003 Database last updated on 14.06.2024 | Most recent event Tooltip | 17.02.2006 | Lapse of the patent in a contracting state New state(s): FR | published on 05.04.2006 [2006/14] | Applicant(s) | For all designated states Alabama Power Company 500 North 18th Street Birmingham, AL 35291 / US | [1998/43] | Inventor(s) | 01 /
HENDRIX, Charles, F. 445 Chulavista Mountain Road Pell City, AL 35125 / US | [1998/43] | Representative(s) | Bartels und Partner, Patentanwälte Lange Strasse 51 70174 Stuttgart / DE | [N/P] |
Former [1998/43] | Patentanwälte Bartels und Partner Lange Strasse 51 70174 Stuttgart / DE | Application number, filing date | 96915821.1 | 01.05.1996 | [1998/43] | WO1996US06935 | Priority number, date | US19950431845 | 01.05.1995 Original published format: US 431845 | [1998/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO9634988 | Date: | 07.11.1996 | Language: | EN | [1996/49] | Type: | A1 Application with search report | No.: | EP0871781 | Date: | 21.10.1998 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.11.1996 takes the place of the publication of the European patent application. | [1998/43] | Type: | B1 Patent specification | No.: | EP0871781 | Date: | 24.07.2002 | Language: | EN | [2002/30] | Search report(s) | International search report - published on: | US | 07.11.1996 | (Supplementary) European search report - dispatched on: | EP | 01.07.1998 | Classification | IPC: | C21B13/12, C21B13/14, C21C1/08, C21C5/52 | [1998/43] | CPC: |
H05B7/14 (EP,US);
C21B13/12 (EP,KR,US);
C21B11/10 (EP,US);
C21C1/08 (EP,US);
C21C5/52 (EP,US);
H05B7/07 (EP,US);
H05B7/102 (EP,US);
H05B7/107 (EP,US);
Y02P10/20 (EP,US);
Y02P10/25 (EP,US)
(-)
| Designated contracting states | AT, BE, CH, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE [1998/43] | Title | German: | VERFAHREN ZUR HERSTELLUNG VON GUSSEISEN | [1998/43] | English: | PROCESS FOR PRODUCING FOUNDRY IRON | [1998/43] | French: | PROCEDE POUR PRODUIRE DE LA FONTE DE MOULAGE | [1998/43] | Entry into regional phase | 28.10.1997 | National basic fee paid | 12.02.1998 | Search fee paid | 28.10.1997 | Designation fee(s) paid | 25.11.1997 | Examination fee paid | Examination procedure | 25.11.1996 | Request for preliminary examination filed International Preliminary Examining Authority: US | 25.11.1997 | Examination requested [1998/43] | 11.09.1998 | Amendment by applicant (claims and/or description) | 26.10.1999 | Despatch of a communication from the examining division (Time limit: M06) | 04.05.2000 | Reply to a communication from the examining division | 15.03.2001 | Despatch of a communication from the examining division (Time limit: M04) | 01.06.2001 | Reply to a communication from the examining division | 18.10.2001 | Despatch of communication of intention to grant (Approval: Yes) | 05.02.2002 | Communication of intention to grant the patent | 08.05.2002 | Fee for grant paid | 08.05.2002 | Fee for publishing/printing paid | Opposition(s) | 25.04.2003 | No opposition filed within time limit [2003/29] | Fees paid | Renewal fee | 30.04.1998 | Renewal fee patent year 03 | 11.03.1999 | Renewal fee patent year 04 | 03.05.2000 | Renewal fee patent year 05 | 11.05.2001 | Renewal fee patent year 06 | 30.04.2002 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 24.07.2002 | BE | 24.07.2002 | CH | 24.07.2002 | FI | 24.07.2002 | FR | 24.07.2002 | GR | 24.07.2002 | LI | 24.07.2002 | NL | 24.07.2002 | DK | 24.10.2002 | PT | 24.10.2002 | SE | 24.10.2002 | ES | 30.01.2003 | [2006/14] |
Former [2004/04] | AT | 24.07.2002 | |
BE | 24.07.2002 | ||
CH | 24.07.2002 | ||
FI | 24.07.2002 | ||
GR | 24.07.2002 | ||
LI | 24.07.2002 | ||
NL | 24.07.2002 | ||
DK | 24.10.2002 | ||
PT | 24.10.2002 | ||
SE | 24.10.2002 | ||
ES | 30.01.2003 | ||
Former [2003/48] | AT | 24.07.2002 | |
BE | 24.07.2002 | ||
CH | 24.07.2002 | ||
FI | 24.07.2002 | ||
GR | 24.07.2002 | ||
LI | 24.07.2002 | ||
NL | 24.07.2002 | ||
DK | 24.10.2002 | ||
PT | 24.10.2002 | ||
SE | 24.10.2002 | ||
Former [2003/46] | AT | 24.07.2002 | |
CH | 24.07.2002 | ||
FI | 24.07.2002 | ||
GR | 24.07.2002 | ||
LI | 24.07.2002 | ||
NL | 24.07.2002 | ||
DK | 24.10.2002 | ||
PT | 24.10.2002 | ||
SE | 24.10.2002 | ||
Former [2003/31] | AT | 24.07.2002 | |
CH | 24.07.2002 | ||
FI | 24.07.2002 | ||
GR | 24.07.2002 | ||
LI | 24.07.2002 | ||
NL | 24.07.2002 | ||
PT | 24.10.2002 | ||
SE | 24.10.2002 | ||
Former [2003/22] | FI | 24.07.2002 | |
GR | 24.07.2002 | ||
NL | 24.07.2002 | ||
PT | 24.10.2002 | ||
SE | 24.10.2002 | ||
Former [2003/20] | FI | 24.07.2002 | |
GR | 24.07.2002 | ||
NL | 24.07.2002 | ||
SE | 24.10.2002 | ||
Former [2003/14] | FI | 24.07.2002 | |
NL | 24.07.2002 | ||
SE | 24.10.2002 | ||
Former [2003/09] | NL | 24.07.2002 | |
SE | 24.10.2002 | ||
Former [2003/03] | SE | 24.10.2002 | Documents cited: | Search | [A]US2775518 (UDY MARVIN J) [A] 1-35* figure -; claim - *; | [A]US3715200 (ARCHIBALD F, et al) [A] 1-35 * figure -; example -; claim - *; | [X]US3896257 (KINOSHITA SADAMU) [X] 1-35 * abstract *; | [X]US3985545 (KINOSHITA SADAMU) [X] 1-35 * abstract * | International search | [Y]US242219 ; | [Y]US3768997 (BLISS N, et al); | [Y]US4731112 (HOFFMAN GLENN E [US]) |