EP0840837 - PROCESS FOR RUNNING A GAS AND STEAM TURBINE PLANT AND PLANT RUN BY THIS PROCESS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2002 Database last updated on 14.06.2024 | Most recent event Tooltip | 17.04.2015 | Change - lapse in a contracting state | published on 20.05.2015 [2015/21] | Applicant(s) | For all designated states SIEMENS AKTIENGESELLSCHAFT Werner-von-Siemens-Str. 1 DE-80333 München / DE | [N/P] |
Former [1998/20] | For all designated states SIEMENS AKTIENGESELLSCHAFT Wittelsbacherplatz 2 80333 München / DE | Inventor(s) | 01 /
BRÜCKNER, Hermann Boggasse 3 D-91080 Uttenreuth / DE | 02 /
KÖHLER, Georg Am Hohen Zorn 13 D-91301 Forchheim / DE | [1998/20] | Application number, filing date | 96922762.8 | 10.07.1996 | [1998/20] | WO1996DE01244 | Priority number, date | DE1995127537 | 27.07.1995 Original published format: DE 19527537 | [1998/20] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO9705366 | Date: | 13.02.1997 | Language: | DE | [1997/08] | Type: | A1 Application with search report | No.: | EP0840837 | Date: | 13.05.1998 | Language: | DE | The application published by WIPO in one of the EPO official languages on 13.02.1997 takes the place of the publication of the European patent application. | [1998/20] | Type: | B1 Patent specification | No.: | EP0840837 | Date: | 29.08.2001 | Language: | DE | [2001/35] | Search report(s) | International search report - published on: | EP | 13.02.1997 | Classification | IPC: | F01K23/10 | [1998/20] | CPC: |
F01K23/106 (EP,US);
F01K23/10 (KR)
| Designated contracting states | CH, DE, ES, FR, GB, IT, LI, NL, SE [1998/20] | Title | German: | VERFAHREN ZUM BETREIBEN EINER GAS- UND DAMPFTURBINENANLAGE SOWIE DANACH ARBEITENDE ANLAGE | [1998/20] | English: | PROCESS FOR RUNNING A GAS AND STEAM TURBINE PLANT AND PLANT RUN BY THIS PROCESS | [1998/20] | French: | PROCEDE D'EXPLOITATION D'UNE INSTALLATION DE TURBINES A GAZ ET A VAPEUR ET INSTALLATION EXPLOITEE SELON CE PROCEDE | [1998/20] | Entry into regional phase | 21.01.1998 | National basic fee paid | 21.01.1998 | Designation fee(s) paid | 21.01.1998 | Examination fee paid | Examination procedure | 18.10.1996 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 21.01.1998 | Examination requested [1998/20] | 22.11.2000 | Despatch of communication of intention to grant (Approval: Yes) | 14.12.2000 | Communication of intention to grant the patent | 05.03.2001 | Fee for grant paid | 05.03.2001 | Fee for publishing/printing paid | Opposition(s) | 30.05.2002 | No opposition filed within time limit [2002/34] | Fees paid | Renewal fee | 20.07.1998 | Renewal fee patent year 03 | 20.07.1999 | Renewal fee patent year 04 | 17.07.2000 | Renewal fee patent year 05 | 27.06.2001 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | |||
Former [2003/21] | FR | 25.01.2002 | Cited in | International search | [A]EP0523467 (SIEMENS AG [DE]) [A] 1 * column 4, line 9 - line 39; figure - *; | [A]EP0410111 (SIEMENS AG [DE]) |