blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0788572

EP0788572 - BUILDING UNDERPINNING PROCESS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.05.2002
Database last updated on 20.07.2024
Most recent event   Tooltip17.04.2015Change - lapse in a contracting statepublished on 20.05.2015  [2015/21]
Applicant(s)For all designated states
Beck, Roland
Hirschweg 2
84048 Mainburg / DE
[1997/33]
Inventor(s)01 / see applicant
...
[1997/33]
Representative(s)Röss, Walter Josef Alfred
Winter, Brandl, Fürniss, Hübner
Röss, Kaiser, Polte
Partnerschaft
Patent- und Rechtsanwaltskanzlei, Alois-Steinecker-Strasse 22
85354 Freising / DE
[N/P]
Former [2009/48]Röss, Walter Josef Alfred
Winter, Brandl, Fürniss, Hübner, Röss, Kaiser, Polte Partnerschaft Patent- und Rechtsanwaltskanzlei Alois-Steinecker-Strasse 22
85354 Freising / DE
Former [1997/33]Röss, Walter Josef
KUHNEN, WACKER & PARTNER, Alois-Steinecker-Strasse 22
85354 Freising / DE
Application number, filing date96938908.916.08.1996
[1997/33]
WO1996DE01526
Priority number, dateDE199513030417.08.1995         Original published format: DE 19530304
DE199514776320.12.1995         Original published format: DE 19547763
[1997/33]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO9707295
Date:27.02.1997
Language:DE
[1997/10]
Type: A1 Application with search report 
No.:EP0788572
Date:13.08.1997
Language:DE
The application published by WIPO in one of the EPO official languages on 27.02.1997 takes the place of the publication of the European patent application.
[1997/33]
Type: B1 Patent specification 
No.:EP0788572
Date:11.07.2001
Language:DE
[2001/28]
Search report(s)International search report - published on:EP27.02.1997
ClassificationIPC:E02D35/00, E02D27/48
[1997/33]
CPC:
E02D27/48 (EP,US); E02D35/00 (EP,US)
Designated contracting statesAT,   BE,   CH,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [1997/33]
TitleGerman:VERFAHREN ZUM UNTERFANGEN VON BAUWERKEN[1997/33]
English:BUILDING UNDERPINNING PROCESS[1997/33]
French:PROCEDE DE REPRISE EN SOUS-OEUVRE DE BATIMENTS[1997/33]
Entry into regional phase09.05.1997National basic fee paid 
09.05.1997Designation fee(s) paid 
09.05.1997Examination fee paid 
Examination procedure09.05.1997Examination requested  [1997/33]
10.02.1998Request for accelerated examination filed
20.04.1998Despatch of a communication from the examining division (Time limit: M06)
20.04.1998Decision about request for accelerated examination - accepted: Yes
08.09.1998Reply to a communication from the examining division
22.12.1998Despatch of a communication from the examining division (Time limit: M06)
06.05.1999Reply to a communication from the examining division
29.05.2000Despatch of communication of intention to grant (Approval: Yes)
14.09.2000Communication of intention to grant the patent
18.12.2000Fee for grant paid
18.12.2000Fee for publishing/printing paid
Opposition(s)12.04.2002No opposition filed within time limit [2002/27]
Fees paidRenewal fee
28.08.1998Renewal fee patent year 03
11.01.2000Renewal fee patent year 04
29.08.2000Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.08.199904   M06   Fee paid on   11.01.2000
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Former [2002/48]IE11.07.2001
Cited inInternational search[XA]US3345824  (TURZILLO LEE A) [X] 1,2 * column 2, line 17 - column 4, line 44; figures 1-11 * [A] 5;
 [XA]WO8603532  (GKN KELLER GMBH [DE]) [X] 1,2,5,7,8 * page 6, line 7 - page 11, line 16; figures 1-11 * [A] 6,9;
 [X]GB2254631  (GUARDIAN FOUNDATIONS PLC [GB]) [X] 1,5,11-13 * the whole document *;
 [A]FR2686356  (FREYSSINET INT & CO [FR]) [A] 17,18 * the whole document *;
 [A]DE4210196  (GUDEHUS GERD PROF DR ING [DE]) [A] 1,17* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.