EP0806598 - Merging pipe and method of manufacturing the same [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 03.05.2002 Database last updated on 27.07.2024 | Most recent event Tooltip | 03.05.2002 | Application deemed to be withdrawn | published on 19.06.2002 [2002/25] | Applicant(s) | For all designated states SANGO CO., LTD. 3-1, Mutsuno-1-chome Atsuta-ku Nagoya Aichi-ken / JP | [N/P] |
Former [1997/46] | For all designated states SANGO CO., LTD. 3-1, Mutsuno-1-chome Atsuta-ku Nagoya Aichi-ken / JP | Inventor(s) | 01 /
Kurimoto, Tooru 2-15, Tennodai, Miyoshicho Nishikamo-gun, Aichi-ken / JP | [1997/46] | Representative(s) | Pellmann, Hans-Bernd, et al Patentanwaltsbüro Tiedtke-Bühling-Kinne & Partner Bavariaring 4-6 80336 München / DE | [N/P] |
Former [1997/46] | Pellmann, Hans-Bernd, Dipl.-Ing., et al Patentanwaltsbüro Tiedtke-Bühling-Kinne & Partner Bavariaring 4 80336 München / DE | Application number, filing date | 97107585.8 | 07.05.1997 | [1997/46] | Priority number, date | JP19960113464 | 08.05.1996 Original published format: JP 11346496 | [1997/46] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP0806598 | Date: | 12.11.1997 | Language: | EN | [1997/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.09.1997 | Classification | IPC: | F16L41/02, F01N7/08, F01N7/10, F01N7/18 | [1997/46] | CPC: |
F01N13/18 (EP,US);
F01N13/08 (EP,US);
F01N13/10 (EP,US);
F16L41/023 (EP,US);
F01N2240/20 (EP,US)
| Designated contracting states | DE, FR, GB, IT [1997/46] | Title | German: | Abzweigrohr und Verfahren zu dessen Herstellung | [1997/46] | English: | Merging pipe and method of manufacturing the same | [1997/46] | French: | Conduite de dérivation et son procédé de fabrication | [1997/46] | Examination procedure | 15.04.1998 | Examination requested [1998/25] | 19.01.2000 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2000 | Reply to a communication from the examining division | 30.06.2000 | Despatch of a communication from the examining division (Time limit: M04) | 01.09.2000 | Reply to a communication from the examining division | 27.09.2000 | Despatch of communication of intention to grant (Approval: Yes) | 08.12.2000 | Communication of intention to grant the patent | 09.03.2001 | Fee for grant paid | 09.03.2001 | Fee for publishing/printing paid | 01.12.2001 | Application deemed to be withdrawn, date of legal effect [2002/25] | 11.01.2002 | Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time [2002/25] | Fees paid | Renewal fee | 31.05.1999 | Renewal fee patent year 03 | 29.05.2000 | Renewal fee patent year 04 | Penalty fee | Additional fee for renewal fee | 31.05.2001 | 05   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [YDA]JPH02141623U (...) [YD] 1,2 * figure - * [A] 3; | [Y]DE670287 (SULZER AG) [Y] 1,2 * figure - *; | [AD]JPS4631288Y (...) [AD] 3 * figures 6,7 * |