Extract from the Register of European Patents

EP About this file: EP0828326

EP0828326 - Energy column [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.11.2002
Database last updated on 09.04.2026
Most recent event   Tooltip22.11.2002No opposition filed within time limitpublished on 08.01.2003  [2003/02]
Applicant(s)For all designated states
Tehalit GmbH & Co. KG
Seebergstrasse 37
67716 Heltersberg / DE
[2001/26]
Former [1998/11]For all designated states
Tehalit GmbH
Postfach 128
D-67716 Heltersberg / DE
Inventor(s)01 / Scherer, Peter, Dipl.-Ing.
Am Mainzer Tor 2
67655 Kaiserslautern / DE
02 / Kauf, Peter, Dipl.-Ing.
Frühlingsstrasse 3
66482 Zweibrücken / DE
03 / Schneckmann, Horst
Am Hohenrech 7
67705 Trippstadt / DE
04 / Tinz, Bernhard H.
Wöhrwoldweg 46
72766 Reutlingen / DE
05 / Dumpf, Ulrich, Dipl.-Des.
Marienstrasse 1
73249 Wernau / DE
[1998/11]
Representative(s)Patentanwälte Dr. Keller, Schwertfeger Partnerschaft mbB
Westring 17
76829 Landau / DE
[N/P]
Former [1998/11]Patentanwälte Möll und Bitterich
Westring 17
76829 Landau / DE
Application number, filing date97114684.025.08.1997
[1998/11]
Priority number, dateDE1996215033U29.08.1996         Original published format: DE 29615033 U
[1998/11]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP0828326
Date:11.03.1998
Language:DE
[1998/11]
Type: A3 Search report 
No.:EP0828326
Date:10.03.1999
[1999/10]
Type: B1 Patent specification 
No.:EP0828326
Date:16.01.2002
Language:DE
[2002/03]
Search report(s)(Supplementary) European search report - dispatched on:EP21.01.1999
ClassificationIPC:H02B1/50
[1998/11]
CPC:
H02B1/50 (EP); H02G3/0493 (EP)
Designated contracting statesAT,   BE,   CH,   DE,   DK,   ES,   FI,   FR,   GB,   IT,   LI,   NL,   SE [1999/47]
Former [1998/11]AT,  BE,  CH,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:Energiesäule[1998/11]
English:Energy column[1998/11]
French:Colonne d'énergie[1998/11]
Examination procedure12.04.1999Examination requested  [1999/23]
27.11.2000Despatch of a communication from the examining division (Time limit: M04)
20.02.2001Reply to a communication from the examining division
26.04.2001Despatch of communication of intention to grant (Approval: Yes)
13.07.2001Communication of intention to grant the patent
05.10.2001Fee for grant paid
05.10.2001Fee for publishing/printing paid
Opposition(s)17.10.2002No opposition filed within time limit [2003/02]
Fees paidRenewal fee
06.08.1999Renewal fee patent year 03
03.08.2000Renewal fee patent year 04
08.08.2001Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X] EP0514862  (ABB ELETTROCONDUTTURE SPA et al.) [X] 1-6 * column 2, line 28 - line 35 * * column 3, line 15 - line 34 * * column 4, line 20 - line 30; figures 1,2,5; claims 1-5 *
 [X] FR2727577  (ELECTRIC PRODUCTION et al.) [X] 1-3 * page 1 - page 3 * * page 7, paragraph 2 - page 8, paragraph 1 * * page 12, paragraph 3; figure 2 *
 [A] GB1453952  (SPACE TASKS LTD et al.) [A] 1 * the whole document *
 [A] FR2290064  (BAUER AG et al.) [A] 1 * page 3, line 28 - line 37; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.