EP0855249 - Grindstone and method of manufacturing the same [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 13.06.2003 Database last updated on 19.10.2024 | Most recent event Tooltip | 13.06.2003 | Application deemed to be withdrawn | published on 30.07.2003 [2003/31] | Applicant(s) | For all designated states Sanwa Kenma Kogyo Co., Ltd. 22-1, Kaminoyama, Okubo-cho Uji-shi Kyoto / JP | [N/P] |
Former [1998/31] | For all designated states Sanwa Kenma Kogyo Co., Ltd. 22-1, Kaminoyama, Okubo-cho Uji-shi, Kyoto / JP | Inventor(s) | 01 /
Sunagawa, Katsuji c/o Sanwa Kenma Kogyo Co., Ltd., 22-1, Kaminoyama Okubo-cho, Uji-shi, Kyoto / JP | [1998/31] | Representative(s) | Prüfer, Lutz H., et al PRÜFER & PARTNER GbR Patentanwälte Harthauser Strasse 25d 81545 München / DE | [N/P] |
Former [1998/31] | Prüfer, Lutz H., Dipl.-Phys., et al PRÜFER & PARTNER, Patentanwälte, Harthauser Strasse 25d 81545 München / DE | Application number, filing date | 97119463.4 | 06.11.1997 | [1998/31] | Priority number, date | JP19970010416 | 23.01.1997 Original published format: JP 1041697 | [1998/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP0855249 | Date: | 29.07.1998 | Language: | EN | [1998/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.02.1998 | Classification | IPC: | B24D7/06, B24D13/14 | [1998/31] | CPC: |
B24B13/01 (EP,US);
B24D13/14 (EP,US);
B24D7/063 (EP,US)
| Designated contracting states | CH, DE, ES, FR, GB, IT, LI [1999/15] |
Former [1998/31] | AT, BE, CH, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE | Title | German: | Schleifwerkzeug und Verfahren zur Herstellung desselben | [1998/31] | English: | Grindstone and method of manufacturing the same | [1998/31] | French: | Outil de meulage et procédé pour sa fabrication | [1998/31] | Examination procedure | 06.11.1997 | Request for accelerated examination filed | 27.01.1999 | Examination requested [1999/13] | 07.04.1999 | Despatch of a communication from the examining division (Time limit: M06) | 07.04.1999 | Decision about request for accelerated examination - accepted: Yes | 30.09.1999 | Reply to a communication from the examining division | 19.09.2001 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2001 | Reply to a communication from the examining division | 04.09.2002 | Communication of intention to grant the patent | 15.01.2003 | Application deemed to be withdrawn, date of legal effect [2003/31] | 03.03.2003 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time [2003/31] | Fees paid | Renewal fee | 30.11.1999 | Renewal fee patent year 03 | 28.11.2000 | Renewal fee patent year 04 | 23.11.2001 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.11.2002 | 06   M06   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [X]US5247765 (QUINTANA JESUS B [ES]) [X] 1-7 * column 2, line 33 - line 47; figures 4A,4B * * column 5, line 24 - line 46 *; | [X]US4010583 (HIGHBERG CARLE W) [X] 1-5 * column 8, line 38 - line 63; figures 4-9 * * column 9, line 38 - column 10, line 4; figure 10 *; | [X]GB2043501 (INTERFACE DEVELOPMENTS LTD) [X] 1-5 * page 2, line 47 - line 81; figure - * |