blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0895333

EP0895333 - System for consumption and/or tariff dependent control of power loads, in particular electrical power loads [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.01.2001
Database last updated on 17.05.2024
Most recent event   Tooltip19.01.2001Application deemed to be withdrawnpublished on 07.03.2001 [2001/10]
Applicant(s)For all designated states
ITF-EDV Fröschl GmbH
Hauserbachstrasse 8-10
93194 Walderbach / DE
[1999/05]
Inventor(s)01 / Fröschl, Wilfried
Wagnerbergstr. 9
93152 Etterzhausen / DE
02 / Zintl, Peter
Wagnersiedlung 8
93092 Friesheim/Barbing / DE
[1999/05]
Representative(s)Graf, Helmut, et al
Graf Glück Habersack Kritzenberger
Postfach 10 08 26
93008 Regensburg / DE
[N/P]
Former [1999/05]Graf, Helmut, Dipl.-Ing., et al
Postfach 10 08 26
93008 Regensburg / DE
Application number, filing date98112329.203.07.1998
[1999/05]
Priority number, dateDE199713256529.07.1997         Original published format: DE 19732565
[1999/05]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP0895333
Date:03.02.1999
Language:DE
[1999/05]
Type: A3 Search report 
No.:EP0895333
Date:17.11.1999
[1999/46]
Search report(s)(Supplementary) European search report - dispatched on:EP04.10.1999
ClassificationIPC:H02J13/00
[1999/05]
CPC:
H02J13/00022 (EP); H02J13/00002 (EP); Y02E60/00 (EP);
Y04S10/30 (EP); Y04S40/126 (EP)
Designated contracting states(deleted) [2000/30]
Former [1999/05]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:System zur energie- und/oder tarif-abhängigen Steuerung von Leistungsverbrauchern, insbesondere elektrischen Leistungsverbrauchern[1999/05]
English:System for consumption and/or tariff dependent control of power loads, in particular electrical power loads[1999/05]
French:Système pour commander des charges en fonction de la consommation et/ou de la tarification, en particulier pour des charges électriques[1999/05]
Examination procedure18.05.2000Application deemed to be withdrawn, date of legal effect  [2001/10]
15.09.2000Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2001/10]
Fees paidPenalty fee
Penalty fee Rule 85b EPC 1973
04.07.2000M01   Not yet paid
Additional fee for renewal fee
31.07.200003   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US4513382  (FAULKNER JR JAMES V [US]) [A] 1-3 * column W *;
 [X]EP0285035  (SIEMENS AG [DE]) [X] 1 * the whole document *;
 [Y]US5212645  (WILDES DOUGLAS G [US], et al) [Y] 2,5 * column W *;
 [A]US5237507  (CHASEK NORMAN E [US]) [A] 1-3 * column W *;
 [X]EP0571889  (ALCATEL STANDARD ELECTRICA [ES]) [X] 1 * the whole document *;
 [XY]EP0582012  (EURO CP SARL [FR]) [X] 1,4 * the whole document * [Y] 2,5;
 [X]WO9500994  (REMOTE METERING SYSTEMS LTD [GB], et al) [X] 1 * the whole document *;
 [A]US5541589  (DELANEY PATRICK J [US]) [A] 1-3* column W *;
 [A]DE19502786  (DAIMLER BENZ AG [DE], et al) [A] 1-3 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.