blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP0915423

EP0915423 - Computer operation management system [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.08.2011
Database last updated on 24.04.2024
Most recent event   Tooltip19.08.2011No opposition filed within time limitpublished on 21.09.2011  [2011/38]
Applicant(s)For all designated states
Hitachi, Ltd.
6 Kanda Surugadai 4-chome
Chiyoda-ku
Tokyo 100-8010 / JP
[N/P]
Former [2010/41]For all designated states
Hitachi, Ltd.
6 Kanda Surugadai 4-chome Chiyoda-ku
Tokyo 100-8010 / JP
Former [1999/19]For all designated states
Hitachi, Ltd.
6 Kanda Surugadai 4-chome
Chiyoda-ku, Tokyo 101-8010 / JP
Inventor(s)01 / Hirata, Toshiaki
6-13, Kikkodaicho-2-chome
Kashiwa-shi / JP
02 / Urano, Akihiro
5977-1-II-113 Tsujido
Fujisawa-shi / JP
03 / Fujino, Shuji
1051-F305, Kamigo
Ebina-shi / JP
04 / Matsumura, Eiji
39-5-504, Miyamotocho-2-chome, Minami-ku
Yokohama-shi / JP
[1999/19]
Representative(s)Strehl Schübel-Hopf & Partner
Maximilianstrasse 54
80538 München / DE
[1999/19]
Application number, filing date98120838.203.11.1998
[1999/19]
Priority number, dateJP1997030606707.11.1997         Original published format: JP 30606797
[1999/19]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0915423
Date:12.05.1999
Language:EN
[1999/19]
Type: A3 Search report 
No.:EP0915423
Date:16.06.2004
[2004/25]
Type: B1 Patent specification 
No.:EP0915423
Date:13.10.2010
Language:EN
[2010/41]
Search report(s)(Supplementary) European search report - dispatched on:EP07.05.2004
ClassificationIPC:G06F11/34
[1999/19]
CPC:
G06F11/3055 (EP,US); G06F11/3006 (EP,US); G06F11/3072 (EP,US);
G06F11/328 (EP,US); G06F11/3495 (EP,US); G06F11/2273 (EP,US);
H04L41/046 (EP,US); H04L41/22 (EP,US) (-)
Designated contracting statesDE,   FR,   GB [2005/10]
Former [1999/19]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:Verwaltungssystem zur Computerbedienung[1999/19]
English:Computer operation management system[1999/19]
French:Système de gestion pour l'opération d'un ordinateur[1999/19]
Examination procedure09.07.2004Examination requested  [2004/37]
13.01.2005Despatch of a communication from the examining division (Time limit: M06)
25.07.2005Reply to a communication from the examining division
07.11.2005Despatch of a communication from the examining division (Time limit: M04)
17.03.2006Reply to a communication from the examining division
16.11.2006Despatch of a communication from the examining division (Time limit: M06)
10.05.2007Reply to a communication from the examining division
20.03.2009Despatch of a communication from the examining division (Time limit: M04)
04.06.2009Reply to a communication from the examining division
31.08.2009Communication of intention to grant the patent
07.01.2010Fee for grant paid
07.01.2010Fee for publishing/printing paid
Opposition(s)14.07.2011No opposition filed within time limit [2011/38]
Fees paidRenewal fee
27.11.2000Renewal fee patent year 03
22.11.2001Renewal fee patent year 04
26.11.2002Renewal fee patent year 05
13.11.2003Renewal fee patent year 06
26.11.2004Renewal fee patent year 07
22.11.2005Renewal fee patent year 08
20.11.2006Renewal fee patent year 09
26.11.2007Renewal fee patent year 10
20.11.2008Renewal fee patent year 11
24.11.2009Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]WO9527249  (INTEL CORP [US]) [X] 1-4,7,8 * abstract * * figures 1-5 * * page 8, line 1 - page 10, line 12 * * page 11, line 4 - line 13 * * page 13, line 1 - page 46, line 9 * [Y] 5;
 [A]US5559955  (DEV ROGER H [US], et al) [A] 1-7 * abstract * * column 3, line 63 - column 5, line 43 * * column 7, line 60 - column 9, line 38 * * column 12, line 6 - column 13, line 13 * * figures 1-13 *;
 [A]JPH0950386
 [YA]  - JONG KIM ET AL, "PROCESS ALLOCATION FOR LOAD DISTRIBUTION IN FAULT-TOLERANT MULTICOMPUTERS", 25TH. INTERNATIONAL SYMPOSIUM ON FAULT TOLERANT COMPUTING. DIGEST OF PAPERS. PASADENA, JUNE 27 - 30, 1995, INTERNATIONAL SYMPOSIUM ON FAULT TOLERANT COMPUTING, LOS ALAMITOS, IEEE COMP. SOC. PRESS, US, (19950627), vol. SYMP. 25, ISBN 0-7803-2965-1, pages 174 - 183, XP000597790 [Y] 5 * page 174, column L, line 1 - page 175, column L, line L * [A] 6
 [A]  - FERIDUN M ET AL, "ANM: AUTOMATED NETWORK MANAGEMENT SYSTEM", IEEE NETWORK, IEEE INC. NEW YORK, US, (19880301), vol. 2, no. 2, ISSN 0890-8044, pages 13 - 19, XP000608853 [A] 1-7 * column W *

DOI:   http://dx.doi.org/10.1109/65.3254
 [A]  - PATENT ABSTRACTS OF JAPAN, (19970630), vol. 1997, no. 06, & JP09050386 A 19970218 (HITACHI LTD) [A] 1,7,8 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.