Extract from the Register of European Patents

EP About this file: EP0989525

EP0989525 - Management system for construction machines [Right-click to bookmark this link]
StatusThe application has been refused
Status updated on  17.09.2010
Database last updated on 11.04.2026
Most recent event   Tooltip17.09.2010Refusal of applicationpublished on 20.10.2010  [2010/42]
Applicant(s)For all designated states
KABUSHIKI KAISHA KOBE SEIKO SHO
3-18, Wakinohama-cho 1-Chome, Chuo-ku, Kobe-shi
Hyogo 651-0072 / JP
[N/P]
Former [2000/13]For all designated states
Kabushiki Kaisha Kobe Seiko Sho
3-18, Wakinohama-cho 1-Chome, Chuo-ku, Kobe-shi
Hyogo 651-0072 / JP
Inventor(s)01 / Kinugawa, Hideki, c/o Yutani Heavy Industries, Ltd
12-4, Gion 3-chome, Asaminami-ku
Hiroshima-shi, Hiroshima / JP
[2000/13]
Representative(s)TBK
Bavariaring 4-6
80336 München / DE
[N/P]
Former [2008/22]TBK-Patent
Bavariaring 4-6
80336 München / DE
Former [2005/33]TBK-Patent
Bavariaring 4-6
80336 München / DE
Former [2002/38]Leson, Thomas Johannes Alois, Dipl.-Ing., et al
c/o TBK-Patent, P.O. Box 20 19 18
80019 München / DE
Former [2000/13]Tiedtke, Harro, Dipl.-Ing., et al
Patentanwaltsbüro Tiedtke-Bühling-Kinne & Partner Bavariaring 4
80336 München / DE
Application number, filing date99117026.730.08.1999
[2000/13]
Priority number, dateJP1998024600231.08.1998         Original published format: JP 24600298
JP1998024600331.08.1998         Original published format: JP 24600398
[2000/13]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP0989525
Date:29.03.2000
Language:EN
[2000/13]
Type: A3 Search report 
No.:EP0989525
Date:19.09.2001
[2001/38]
Search report(s)(Supplementary) European search report - dispatched on:EP06.08.2001
ClassificationIPC:G07C5/00, G07C3/00, G07C5/08
[2001/38]
CPC:
E02F9/20 (EP,US); B60R25/00 (EP,US); B60R25/04 (EP,US);
B60R25/33 (EP,US); E02F9/24 (EP,US); G07C3/00 (EP,US);
G07C5/008 (EP,US); G07C5/0841 (EP,US); G07C5/085 (EP,US) (-)
Former IPC [2000/13]G07C5/00
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2000/13]
TitleGerman:Verwaltungssystem für Baumaschinen[2000/13]
English:Management system for construction machines[2000/13]
French:Système de gestion pour machines de chantier[2000/13]
Examination procedure31.08.1999Examination requested  [2000/13]
19.03.2002Despatch of a communication from the examining division (Time limit: M04)
19.07.2002Reply to a communication from the examining division
03.06.2003Date of oral proceedings
24.07.2003Minutes of oral proceedings despatched
23.03.2006Despatch of a communication from the examining division (Time limit: M04)
31.07.2006Reply to a communication from the examining division
27.05.2008Application refused, date of legal effect [2010/42]
27.05.2008Date of oral proceedings
12.06.2008Despatch of communication that the application is refused, reason: substantive examination [2010/42]
12.06.2008Minutes of oral proceedings despatched
Appeal following examination29.09.2003Appeal received No.  T0141/04
21.11.2003Statement of grounds filed
09.11.2005Result of appeal procedure: continuation of examination procedure
09.11.2005Date of oral proceedings
24.07.2003Minutes of oral proceedings despatched
Divisional application(s)EP05024226.2  / EP1632904
EP05024227.0  / EP1632905
Fees paidRenewal fee
29.08.2001Renewal fee patent year 03
29.08.2002Renewal fee patent year 04
28.08.2003Renewal fee patent year 05
30.08.2004Renewal fee patent year 06
30.08.2005Renewal fee patent year 07
30.08.2006Renewal fee patent year 08
30.08.2007Renewal fee patent year 09
31.03.2008Renewal fee patent year 10
Penalty fee
Additional fee for renewal fee
31.08.200911   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY] US5475597  (BUCK JAMES C et al.) [X] 1-7 * abstract * * column 3, line 7 - column 6, line 21 *[Y] 10-13
 [XA] US5714946  (GOTTSHALL PAUL C et al.) [X] 1,6,7 * the whole document *[A] 2,3
 [Y] EP0839697  (HILLE FRIEDRICH et al.) [Y] 10-13 * the whole document *
 [A] US5719563  (THOMPSON JR DARWIN O et al.) [A] 1-3 * abstract * * column 2, line 40 - column 3, line 20 * * column 4, line 26 - column 5, line 64 *
 [A] US5586130  (DOYLE THOMAS F et al.) [A]
 [A] US5646845  (GUDAT ADAM J et al.) [A]
ExaminationWO9627513
 US4979170
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.