blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1030135

EP1030135 - Process for controled cooling by evaporating liquid nitrogen [Right-click to bookmark this link]
Former [2000/34]Process and apparatus for controled cooling by evaporating liquid nitrogen
[2002/02]
StatusNo opposition filed within time limit
Status updated on  18.07.2003
Database last updated on 05.07.2024
Most recent event   Tooltip21.03.2008Lapse of the patent in a contracting state
New state(s): IT
published on 23.04.2008  [2008/17]
Applicant(s)For all designated states
Lauda Dr. R. Wobser GmbH & Co. KG
Pfarrstrasse 41/43
97922 Lauda-Königshofen / DE
[2000/34]
Inventor(s)01 / Semrau, Alfred
Häldenweg 7/1
97980 Bad Mergentheim / DE
[2000/34]
Representative(s)Schubert, Siegmar
Patentanwälte
Dannenberg Schubert Gudel
Grosse Eschenheimer Strasse 39
60313 Frankfurt / DE
[N/P]
Former [2000/34]Schubert, Siegmar, Dipl.-Ing.
Patentanwälte Dannenberg Schubert Gudel Grosse Eschenheimer Strasse 39
60313 Frankfurt / DE
Application number, filing date99125892.224.12.1999
[2000/34]
Priority number, dateEP1999010335520.02.1999         Original published format: EP 99103355
[2000/34]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1030135
Date:23.08.2000
Language:DE
[2000/34]
Type: B1 Patent specification 
No.:EP1030135
Date:11.09.2002
Language:DE
[2002/37]
Search report(s)(Supplementary) European search report - dispatched on:EP06.04.2000
ClassificationIPC:F25D3/10, F25B25/00, F25D17/02
[2000/34]
CPC:
F25D17/02 (EP); F25B25/00 (EP); F25D3/10 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2000/34]
TitleGerman:Verfahren zur geregelten Kühlung durch Verdampfen flüssigen Stickstoffs[2002/02]
English:Process for controled cooling by evaporating liquid nitrogen[2002/02]
French:Procédé pour le refroidissement controlé utilisant l'evaporation d'azote liquide[2002/02]
Former [2000/34]Verfahren und Einrichtung zur geregelten Kühlung durch Verdampfen flüssigen Stickstoffs
Former [2000/34]Process and apparatus for controled cooling by evaporating liquid nitrogen
Former [2000/34]Procédé et dispositif pour le refroidissement controlée utilisant l'evaporation d'azote liquide
Examination procedure16.01.2001Examination requested  [2001/12]
22.03.2001Request for accelerated examination filed
04.04.2001Despatch of a communication from the examining division (Time limit: M06)
04.04.2001Decision about request for accelerated examination - accepted: Yes
04.10.2001Reply to a communication from the examining division
13.12.2001Despatch of communication of intention to grant (Approval: Yes)
27.03.2002Communication of intention to grant the patent
27.06.2002Fee for grant paid
27.06.2002Fee for publishing/printing paid
Opposition(s)12.06.2003No opposition filed within time limit [2003/36]
Fees paidRenewal fee
20.11.2001Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipFI11.09.2002
GR11.09.2002
IT11.09.2002
NL11.09.2002
DK11.12.2002
SE11.12.2002
PT17.12.2002
LU24.12.2002
CY31.12.2002
ES28.03.2003
[2008/17]
Former [2007/21]FI11.09.2002
GR11.09.2002
NL11.09.2002
DK11.12.2002
SE11.12.2002
PT17.12.2002
LU24.12.2002
CY31.12.2002
ES28.03.2003
Former [2004/39]FI11.09.2002
GR11.09.2002
NL11.09.2002
SE11.12.2002
PT17.12.2002
LU24.12.2002
CY31.12.2002
ES28.03.2003
Former [2004/10]FI11.09.2002
GR11.09.2002
NL11.09.2002
SE11.12.2002
PT17.12.2002
CY31.12.2002
ES28.03.2003
Former [2004/05]FI11.09.2002
GR11.09.2002
NL11.09.2002
SE11.12.2002
PT17.12.2002
ES28.03.2003
Former [2003/22]FI11.09.2002
GR11.09.2002
NL11.09.2002
SE11.12.2002
PT17.12.2002
Former [2003/20]FI11.09.2002
GR11.09.2002
SE11.12.2002
Former [2003/14]FI11.09.2002
SE11.12.2002
Documents cited:Search[DXY]EP0922916  (MESSER GRIESHEIM GMBH) [DX] 1,4,5,8 * the whole document * * column 2, line 13 - line 30 * [Y] 2,3,9-12;
 [Y]EP0787957  (BOC GROUP INC) [Y] 2,3 * the whole document *;
 [YA]GB1252664  (CATALANA DE GAS Y ELECTRICIDAD, S.A.) [Y] 9 * the whole document * * page 2, line 107 - line 117 * [A] 13;
 [Y]DE29617526U  (STALKE DIETMAR PROF DR ;KOTTKE THOMAS DR (DE)) [Y] 10 * the whole document *;
 [Y]EP0713718  (BAYER AG) [Y] 11 * the whole document *;
 [YA]DE3317510  (THERMAL WAERME KAELTE KLIMA) [Y] 12 * the whole document * [A] 13;
 [DA]EP0427112  (WESTFALEN AG) [DA] 1-18 * the whole document *;
 [A]EP0851179  (BAUER ALBERT) [A] 6,7 * figure 10 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.