blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1059274

EP1059274 - Silicon-doped boron nitride coated fibers in silicon melt infiltrated composites [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.11.2006
Database last updated on 03.10.2024
Most recent event   Tooltip03.11.2006No opposition filed within time limitpublished on 06.12.2006  [2006/49]
Applicant(s)For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
[N/P]
Former [2000/50]For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
Inventor(s)01 / Corman, Gregory Scott
16 Edwin Drive
Ballston Lake, New York 12019 / US
02 / Luthra, Krishan Lal
780 Red Oak Drive
Schenectady, New York 12309 / US
[2000/50]
Representative(s)Pedder, James Cuthbert, et al
London Patent Operation
General Electric International, Inc.
15 John Adam Street
London WC2N 6LU / GB
[N/P]
Former [2000/50]Pedder, James Cuthbert, et al
GE London Patent Operation, Essex House, 12/13 Essex Street
London WC2R 3AA / GB
Application number, filing date99304405.607.06.1999
[2000/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1059274
Date:13.12.2000
Language:EN
[2000/50]
Type: B1 Patent specification 
No.:EP1059274
Date:28.12.2005
Language:EN
[2005/52]
Search report(s)(Supplementary) European search report - dispatched on:EP25.10.1999
ClassificationIPC:C04B35/80, C04B35/573
[2000/50]
CPC:
B32B18/00 (EP); C04B35/573 (EP,US); C04B35/62847 (EP);
C04B35/62849 (EP); C04B35/62852 (EP); C04B35/62855 (EP);
C04B35/62857 (EP); C04B35/6286 (EP); C04B35/62863 (EP);
C04B35/62865 (EP); C04B35/62868 (EP,US); C04B35/62871 (EP);
C04B35/62873 (EP); C04B35/62894 (EP); C04B35/62897 (EP);
C04B35/80 (EP,US); C04B2235/3826 (EP); C04B2235/421 (EP);
C04B2235/425 (EP); C04B2235/428 (EP); C04B2235/5244 (EP);
C04B2235/5248 (EP); C04B2235/5268 (EP); C04B2235/5276 (EP);
C04B2235/5292 (EP); C04B2235/6562 (EP); C04B2235/6567 (EP);
C04B2235/6581 (EP); C04B2235/80 (EP); C04B2235/9684 (EP);
C04B2237/341 (EP); C04B2237/345 (EP); C04B2237/346 (EP);
C04B2237/348 (EP); C04B2237/361 (EP); C04B2237/363 (EP);
C04B2237/365 (EP); C04B2237/366 (EP); C04B2237/38 (EP) (-)
Designated contracting statesCH,   DE,   FR,   GB,   IT,   LI,   SE [2001/36]
Former [2000/50]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE 
TitleGerman:Mit Silicium dotiertem Bornitrid beschichtete Fiber für Verbundwerkstoffe, die mit geschmolzenen Silicium infiltriert sind[2000/50]
English:Silicon-doped boron nitride coated fibers in silicon melt infiltrated composites[2000/50]
French:Fibres revêtues de nitrure de bore dopé au silicium dans des composites infiltrés par du silicium fondue[2000/50]
Examination procedure13.06.2001Examination requested  [2001/32]
25.11.2002Despatch of a communication from the examining division (Time limit: M06)
04.06.2003Reply to a communication from the examining division
30.06.2003Despatch of a communication from the examining division (Time limit: M06)
16.02.2004Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
26.04.2004Reply to a communication from the examining division
10.06.2005Communication of intention to grant the patent
20.10.2005Fee for grant paid
20.10.2005Fee for publishing/printing paid
Opposition(s)29.09.2006No opposition filed within time limit [2006/49]
Request for further processing for:22.04.2004Request for further processing filed
22.04.2004Full payment received (date of receipt of payment)
Request granted
13.05.2004Decision despatched
Fees paidRenewal fee
02.07.2001Renewal fee patent year 03
01.07.2002Renewal fee patent year 04
30.06.2003Renewal fee patent year 05
30.06.2004Renewal fee patent year 06
30.06.2005Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US5593728  (MOORE ARTHUR W [US], et al) [Y] 1-13 * column 1, line 51 - column 2, line 35 * * column 3, line 56 - line 64 * * column 8, line 14 - line 36 *;
 [Y]EP0798281  (TOSHIBA KK [JP]) [Y] 1-13 * page 3, line 20 - page 4, line 32 * * page 5, line 26 - line 46 * * page 6, line 2 - line 10 * * examples 1-4 *;
 [Y]US5643514  (CHWASTIAK STEPHEN [US], et al) [Y] 1-13 * column 2, line 58 - column 3, line 13 * * examples 1,2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.