blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1158061

EP1158061 - Production of a solid material in parallelepipedal or cylindrical shape, laminated, sintered, cut-up and thermally treated [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2005
Database last updated on 14.09.2024
Most recent event   Tooltip14.12.2007Lapse of the patent in a contracting state
New state(s): PT
published on 16.01.2008  [2008/03]
Applicant(s)For all designated states
Technodop Ltd. (Société de Droit Irlandais)
15, Anne Street South
Dublin 2 / IE
[2001/48]
Inventor(s)01 / Cohen-Adad, Marie-Thérése
43, Chemin des Petites Brosses
69300 Caluire / FR
02 / Laversenne, Laetitia
29, rue Challemel Lacour
69007 Lyon / FR
03 / Goutaudier, Christelle
8, rue Putet
69250 Fleurieu/Saone / FR
04 / Boulon, Georges
13 bis, rue de la Garenne
69005 Lyon / FR
 [2001/48]
Representative(s)Gaucherand, Michel
IXAS Conseil
15, rue Emile Zola
69002 Lyon / FR
[N/P]
Former [2001/48]Gaucherand, Michel
IXAS Conseil 15 Rue Emile Zola
69002 Lyon / FR
Application number, filing date00111372.926.05.2000
[2001/48]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1158061
Date:28.11.2001
Language:FR
[2001/48]
Type: B1 Patent specification 
No.:EP1158061
Date:29.09.2004
Language:FR
[2004/40]
Search report(s)(Supplementary) European search report - dispatched on:EP13.10.2000
ClassificationIPC:C22C1/04, B22F3/16, B22F5/12, B32B31/18
[2001/48]
CPC:
C22C49/00 (EP,US); B22F1/062 (EP,US); B32B18/00 (EP);
C03B32/00 (EP); C03B37/01291 (EP); C03B37/01297 (EP);
C04B35/653 (EP); B22F2998/10 (EP); B22F2999/00 (EP);
C03B2201/80 (EP); C03B2201/84 (EP); C04B2237/34 (EP);
C04B2237/343 (EP); C04B2237/36 (EP) (-)
C-Set:
B22F2998/10, B22F3/004, B22F3/14, B22F9/04 (EP);
B22F2999/00, B22F9/04, C22C49/00 (EP);
B22F2999/00, C22C49/00, B22F2207/01 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE [2001/48]
TitleGerman:Herstellung eines festes Werkstoffes in quader- oder zylindrischer Form, der laminiert, gesintert, geschnitten und wärmebehandelt wird[2001/48]
English:Production of a solid material in parallelepipedal or cylindrical shape, laminated, sintered, cut-up and thermally treated[2001/48]
French:Réalisation d'un matériau solide, de forme parallélépipédique ou cylindrique, stratifié, fritté, découpé et traité thermiquement[2001/48]
Examination procedure28.05.2002Examination requested  [2002/31]
02.06.2003Despatch of a communication from the examining division (Time limit: M06)
02.12.2003Reply to a communication from the examining division
12.03.2004Communication of intention to grant the patent
08.07.2004Fee for grant paid
08.07.2004Fee for publishing/printing paid
Opposition(s)30.06.2005No opposition filed within time limit [2005/38]
Fees paidRenewal fee
29.07.2002Renewal fee patent year 03
27.05.2003Renewal fee patent year 04
26.05.2004Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.05.200203   M06   Fee paid on   29.07.2002
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
IT29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
PT28.02.2005
CY26.05.2005
LU26.05.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
MC31.05.2005
[2008/03]
Former [2007/35]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
IT29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
CY26.05.2005
LU26.05.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
MC31.05.2005
Former [2007/27]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
CY26.05.2005
LU26.05.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
MC31.05.2005
Former [2007/26]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
CY26.05.2005
LU26.05.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
Former [2007/20]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
CY26.05.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
LU31.05.2005
Former [2007/08]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
LU31.05.2005
Former [2006/25]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
BE31.05.2005
CH31.05.2005
LI31.05.2005
Former [2006/14]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
CH31.05.2005
LI31.05.2005
Former [2006/13]AT29.09.2004
FI29.09.2004
GB29.09.2004
IE29.09.2004
NL29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
Former [2006/03]AT29.09.2004
FI29.09.2004
IE29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
DE30.12.2004
ES09.01.2005
Former [2005/46]AT29.09.2004
FI29.09.2004
IE29.09.2004
DK29.12.2004
GR29.12.2004
SE29.12.2004
ES09.01.2005
Former [2005/27]AT29.09.2004
FI29.09.2004
IE29.09.2004
GR29.12.2004
SE29.12.2004
ES09.01.2005
Former [2005/24]AT29.09.2004
FI29.09.2004
IE29.09.2004
GR29.12.2004
SE29.12.2004
Former [2005/18]AT29.09.2004
FI29.09.2004
GR29.12.2004
SE29.12.2004
Former [2005/13]AT29.09.2004
FI29.09.2004
SE29.12.2004
Former [2005/11]FI29.09.2004
SE29.12.2004
Former [2005/10]SE29.12.2004
Documents cited:Search[A]RU2089347  ;
 [X]JPS56155046  ;
 [A]GB565520  (CUTANIT, et al) [A] 1,10 * page 2, lignes 43-63 *;
 [X]US4217399  (DOBO EMERICK J [US]) [X] 10,11 * abrégé; revendications *;
 [X]US5424282  (YAMAMOTO SUSUMU [JP], et al) [X] 10,11 * revendication 1 *;
 [X]EP0870919  (YAMAHA MOTOR CO LTD [JP]) [X] 1-3,5,10 * revendications 1 et 13; figures *;
 [A]  - DATABASE WPI, 1, Derwent World Patents Index, vol. 1998, no. 18, Database accession no. 1998-205532, XP002149221 & RU2089347 C 19970910 (SINELSHCHIKOV V V) [A] 1 * abstract *
 [X]  - PATENT ABSTRACTS OF JAPAN, (19820312), vol. 006, no. 040, Database accession no. (C - 094), & JP56155046 A 19811201 (NIPPON TELEGR & TELEPH CORP) [X] 12,13 * abstract *
 [A]  - LIN C -Y ET AL, "EXTRUSION PROCESS FOR MANUFACTURE OF BULK FUNCTIONALLY GRADED MATERIALS", POWDER METALLURGY,GB,METALS SOCIETY. LONDON, (1996), vol. 39, no. 3, ISSN 0032-5899, pages 219 - 222, XP000641583 [A] 1 * page 219 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.