EP1249101 - A PROTOCOL FOR NEIGHBORHOOD-ESTABLISHED TRANSMISSION SCHEDULING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.06.2012 Database last updated on 19.10.2024 | Most recent event Tooltip | 17.05.2013 | Lapse of the patent in a contracting state New state(s): LU | published on 19.06.2013 [2013/25] | Applicant(s) | For all designated states Nokia Inc. 6021 Connection Drive, MS 2-5-520 Irving, TX 75039 / US | [2011/32] |
Former [2008/38] | For all designated states Nokia Inc. 6021 Connection Drive MS 2-5-520 Irving, TX 75039 / US | ||
Former [2005/01] | For all designated states Nokia, Inc. 313 Fairchild Drive Mountain View, CA 94043 / US | ||
Former [2002/42] | For all designated states Nokia Wireless Routers, Inc. 313 Fairchild Drive Mountain View, CA 94043 / US | Inventor(s) | 01 /
GARCIA-LUNA-ACEVES, J., Joaquin 82 Lakewood Circle San Mateo, CA 94402 / US | 02 /
FULLMER, Chane, L. P.O. Box 759 Santa Cruz, CA 95061 / US | 03 /
BEYER, David, A. 468 Paco Drive Los Altos, CA 94024 / US | [2002/42] | Representative(s) | Nokia EPO representatives Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [N/P] |
Former [2011/03] | Nokia Corporation Intellectual Property Rights P.O. Box 226 00045 Nokia Group / FI | ||
Former [2010/49] | Tognetty, Virpi Maria Nokia Corporation IPR Department Keilalahdentie 4 01250 Espoo / FI | ||
Former [2007/19] | Böck, Bernhard, et al Böck, Tappe, v.d. Steinen, Weigand Patent- und Rechtsanwälte Widenmayerstrasse 4 80538 München / DE | ||
Former [2002/42] | Kirschner, Klaus Dieter, Dipl.-Phys. Schneiders & Behrendt Rechtsanwälte - Patentanwälte Sollner Strasse 38 81479 München / DE | Application number, filing date | 00986792.0 | 16.10.2000 | [2002/42] | WO2000US41179 | Priority number, date | US19990418899 | 15.10.1999 Original published format: US 418899 | [2002/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO0128170 | Date: | 19.04.2001 | Language: | EN | [2001/16] | Type: | A2 Application without search report | No.: | EP1249101 | Date: | 16.10.2002 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.04.2001 takes the place of the publication of the European patent application. | [2002/42] | Type: | B1 Patent specification | No.: | EP1249101 | Date: | 10.08.2011 | Language: | EN | [2011/32] | Search report(s) | International search report - published on: | EP | 01.08.2002 | Classification | IPC: | H04W74/04 | [2011/20] | CPC: |
H04W74/04 (EP,US);
H04L45/02 (EP,US);
H04L45/44 (EP,US)
|
Former IPC [2002/42] | H04L12/56, H04L12/28 | Designated contracting states | AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE [2002/42] | Extension states | AL | Not yet paid | LT | Not yet paid | LV | Not yet paid | MK | Not yet paid | RO | Not yet paid | SI | Not yet paid | Title | German: | PROTOKOLL ZUR ABLAUFSTEUERUNG VON IN DER NACHBARSCHAFT AUFGEBAUTEN ÜBERTRAGUNGEN | [2002/42] | English: | A PROTOCOL FOR NEIGHBORHOOD-ESTABLISHED TRANSMISSION SCHEDULING | [2002/42] | French: | PROTOCOLE POUR L'ORDONNANCEMENT DE TRANSMISSIONS ETABLIES EN FONCTION DU VOISINAGE | [2002/42] | Entry into regional phase | 15.05.2002 | National basic fee paid | 15.05.2002 | Designation fee(s) paid | 15.05.2002 | Examination fee paid | Examination procedure | 15.05.2001 | Request for preliminary examination filed International Preliminary Examining Authority: US | 15.05.2002 | Examination requested [2002/42] | 24.01.2006 | Despatch of a communication from the examining division (Time limit: M04) | 26.05.2006 | Reply to a communication from the examining division | 20.09.2006 | Despatch of a communication from the examining division (Time limit: M06) | 22.03.2007 | Reply to a communication from the examining division | 06.03.2008 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2008 | Reply to a communication from the examining division | 18.04.2011 | Cancellation of oral proceeding that was planned for 12.05.2011 | 05.05.2011 | Communication of intention to grant the patent | 12.05.2011 | Date of oral proceedings (cancelled) | 28.06.2011 | Fee for grant paid | 28.06.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.01.2006 | Opposition(s) | 11.05.2012 | No opposition filed within time limit [2012/29] | Fees paid | Renewal fee | 21.10.2002 | Renewal fee patent year 03 | 14.10.2003 | Renewal fee patent year 04 | 14.10.2004 | Renewal fee patent year 05 | 12.10.2005 | Renewal fee patent year 06 | 12.10.2006 | Renewal fee patent year 07 | 12.10.2007 | Renewal fee patent year 08 | 31.03.2008 | Renewal fee patent year 09 | 13.10.2009 | Renewal fee patent year 10 | 11.10.2010 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 10.08.2011 | BE | 10.08.2011 | CY | 10.08.2011 | DK | 10.08.2011 | FI | 10.08.2011 | IT | 10.08.2011 | SE | 10.08.2011 | IE | 16.10.2011 | LU | 16.10.2011 | CH | 31.10.2011 | LI | 31.10.2011 | MC | 31.10.2011 | FR | 02.11.2011 | GB | 10.11.2011 | GR | 11.11.2011 | ES | 21.11.2011 | PT | 12.12.2011 | [2013/25] |
Former [2013/22] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
IE | 16.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
FR | 02.11.2011 | ||
GB | 10.11.2011 | ||
GR | 11.11.2011 | ||
ES | 21.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/47] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
IE | 16.10.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
FR | 02.11.2011 | ||
GB | 10.11.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/46] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
FR | 02.11.2011 | ||
GB | 10.11.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/37] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
FR | 02.11.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/33] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
CH | 31.10.2011 | ||
LI | 31.10.2011 | ||
MC | 31.10.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/32] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
DK | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
MC | 31.10.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/25] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
MC | 31.10.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/23] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
FI | 10.08.2011 | ||
IT | 10.08.2011 | ||
SE | 10.08.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/17] | AT | 10.08.2011 | |
BE | 10.08.2011 | ||
CY | 10.08.2011 | ||
FI | 10.08.2011 | ||
SE | 10.08.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/12] | AT | 10.08.2011 | |
CY | 10.08.2011 | ||
FI | 10.08.2011 | ||
SE | 10.08.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/11] | AT | 10.08.2011 | |
FI | 10.08.2011 | ||
SE | 10.08.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/10] | FI | 10.08.2011 | |
SE | 10.08.2011 | ||
GR | 11.11.2011 | ||
PT | 12.12.2011 | ||
Former [2012/09] | FI | 10.08.2011 | |
PT | 12.12.2011 | Cited in | International search | [XA]US5652751 (SHARONY JACOB [US]) [X] 1,2,5,12,13,38,39 * column 2, line 5 - line 27 * * column 4, line 43 - line 46 * * column 4, line 60 - line 67 * * column 5, line 1 - line 24 * * column 5, line 51 - line 54 * * column 6, line 22 - line 38 * * column 7, line 24 - line 26 * * column 9, line 41 - line 50 * * column 15, line 30 - line 62 * [A] 7-10,21; | [X]WO9946899 (SWISSCOM AG [CH], et al) [X] 1,2,12,21,38 * page 2, line 22 - page 3, line 8 * * page 5, line 5 - line 16 * * page 6, line 15 - line 22 * * page 7, line 7 - line 18 * * page 8, line 5 - line 21 * * page 11, line 24 - line 28 ** page 12, line 30 - page 13, line 5 * | Examination | - VUONG T H P ET AL, "Broadcast scheduling in packet radio networks", PROCEEDINGS OF THE INTERNATIONAL CONVERENCE ON COMPUTER COMMUNICATIONS AND NETWORKS, LAFAYETTE, USA, (19981012), doi:DOI:10.1109/ICCCN.1998.739983, ISBN 978-0-8186-9014-3, pages 714 - 721, XP010587028 DOI: http://dx.doi.org/10.1109/ICCCN.1998.739983 | - MAHAJAN A O ET AL, "Modelling and evaluating network formation functions in self-organising radio networks", GLOBAL TELECOMMUNICATIONS CONFERENCE, 1995. CONFERENCE RECORD. COMMUNI CATION THEORY MINI-CONFERENCE, GLOBECOM '95., IEEE SINGAPORE 13-17 NOV. 1995, NEW YORK, NY, USA,IEEE, US, (19951113), vol. 2, doi:DOI:10.1109/GLOCOM.1995.502653, ISBN 978-0-7803-2509-8, pages 1507 - 1511, XP010164472 DOI: http://dx.doi.org/10.1109/GLOCOM.1995.502653 | by applicant | US5652751 |