EP1170811 - Fuel cell system and method for operating the system [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 29.10.2004 Database last updated on 22.01.2025 | Most recent event Tooltip | 29.10.2004 | Application deemed to be withdrawn | published on 15.12.2004 [2004/51] | Applicant(s) | For all designated states Ballard Power Systems AG Neue Strasse 95 73230 Kirchheim / Teck-Nabern / DE | [2002/24] |
Former [2002/02] | For all designated states XCELLSIS GmbH Neue Strasse 95 73230 Kirchheim/Teck-Nabern / DE | Inventor(s) | 01 /
Derflinger, Monika Kirchstrasse 60/1 73272 Neidlingen / DE | 02 /
Haas, Isabel Limburgstrasse 42 73230 Kirchheim / DE | 03 /
Kaufmann, Lars Krebenstrasse 27 73230 Kirchheim / DE | [2002/02] | Representative(s) | Beyer, Andreas, et al Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstrasse 2 81541 München / DE | [N/P] |
Former [2002/48] | Beyer, Andreas, Dr., et al Wuesthoff & Wuesthoff, Patent- und Rechtsanwälte, Schweigerstrasse 2 81541 München / DE | ||
Former [2002/02] | Kocher, Klaus-Peter Dipl.-Phys, et al DaimlerChrysler AG, Intellectual Property Management, FTP/A-C106 70546 Stuttgart / DE | Application number, filing date | 01115438.2 | 27.06.2001 | [2002/02] | Priority number, date | DE20001032667 | 05.07.2000 Original published format: DE 10032667 | [2002/02] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP1170811 | Date: | 09.01.2002 | Language: | DE | [2002/02] | Type: | A3 Search report | No.: | EP1170811 | Date: | 10.09.2003 | [2003/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.07.2003 | Classification | IPC: | H01M8/06, H01M8/04 | [2002/02] | CPC: |
H01M8/0662 (EP,US);
C01B3/32 (EP,US);
H01M8/0625 (EP,US);
C01B2203/025 (EP,US);
C01B2203/0495 (EP,US);
C01B2203/066 (EP,US);
C01B2203/1638 (EP,US);
H01M8/04164 (EP,US);
H01M8/0668 (EP,US);
Y02E60/50 (EP)
(-)
| Designated contracting states | DE, FR, GB, IT [2004/23] |
Former [2002/02] | AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE, TR | Title | German: | Brennstoffzellensystem und Verfahren zum Betreiben desselben | [2002/02] | English: | Fuel cell system and method for operating the system | [2002/02] | French: | Système de piles à combustible et méthode de faire fontionner un tel système | [2002/02] | Examination procedure | 11.03.2004 | Application deemed to be withdrawn, date of legal effect [2004/51] | 12.07.2004 | Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time [2004/51] | Fees paid | Renewal fee | 12.06.2003 | Renewal fee patent year 03 | 14.06.2004 | Renewal fee patent year 04 | Penalty fee | Penalty fee Rule 85b EPC 1973 | 23.04.2004 | M01   Not yet paid |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XY]US4098960 (GAGNON RICHARD N) [X] 1,2,8 * column 3, line 29 - column 4, line 7; figure 2 * [Y] 3-5,9-11; | [XY]US4098959 (FANCIULLO SALVATORE) [X] 1,8 * column 3, line 28 - column 4, line 9; figure 1 * [Y] 3-5,9-11; | [X]US4670359 (BESHTY BAHJAT S [US], et al) [X] 1,4,5,8,10,11 * column 6, lines 27-29 * * column 5, line 56 - column 6, line 57; figure 2 *; | [Y]US5360679 (BUSWELL RICHARD F [US], et al) [Y] 3-5,9-11 * column 10, lines 10-18 * * column 10, lines 38-43; figure 1 *; | [PA]EP1033769 (DAIMLER CHRYSLER AG [DE]) [PA] 1,3-5,7-11* paragraph [0027]; figures 1-4 * |