blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1219764

EP1219764 - Method for making a civil engineering construction, especially swimming pools or water basins and means for carrying out this method [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.11.2007
Database last updated on 27.07.2024
Most recent event   Tooltip16.11.2007Application deemed to be withdrawnpublished on 19.12.2007  [2007/51]
Applicant(s)For all designated states
Queirel, Joel
39, rue Jules-Lebocey
10000 Troyes / FR
[2002/27]
Inventor(s)01 / see applicant
...
 [2002/27]
Representative(s)Lerner, François
5, rue Jules Lefèbvre
75009 Paris / FR
[2002/27]
Application number, filing date01403288.218.12.2001
[2002/27]
Priority number, dateFR2001000001402.01.2001         Original published format: FR 0100014
[2002/27]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1219764
Date:03.07.2002
Language:FR
[2002/27]
Search report(s)(Supplementary) European search report - dispatched on:EP23.04.2002
ClassificationIPC:E04H4/00
[2002/27]
CPC:
E04H4/0075 (EP,US)
Designated contracting statesDE,   ES,   IT,   PT [2003/13]
Former [2002/27]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE,  TR 
TitleGerman:Herstellungsverfahren für Bauwerke, insbesondere für Schwimmbäder oder Wasserbecken und Vorrichtung zum Durchführen des Verfahrens[2002/27]
English:Method for making a civil engineering construction, especially swimming pools or water basins and means for carrying out this method[2002/27]
French:Procédé pour la réalisation d'ouvrages de génie civil, et notamment de piscines ou bassins de retenue d'eau, et moyens pour sa mise en oeuvre[2002/27]
Examination procedure06.12.2002Examination requested  [2003/06]
04.01.2003Loss of particular rights, legal effect: designated state(s)
19.05.2003Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, CY, DK, FI, FR, GB, GR, IE, LU, MC, NL, SE, TR
13.04.2005Despatch of a communication from the examining division (Time limit: M04)
02.08.2005Reply to a communication from the examining division
06.06.2006Despatch of a communication from the examining division (Time limit: M04)
05.10.2006Reply to a communication from the examining division
02.03.2007Communication of intention to grant the patent
03.07.2007Application deemed to be withdrawn, date of legal effect  [2007/51]
03.08.2007Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2007/51]
Fees paidRenewal fee
06.12.2003Renewal fee patent year 03
27.12.2004Renewal fee patent year 04
12.12.2005Renewal fee patent year 05
Penalty fee
Penalty fee Rule 85a EPC 1973
17.02.2003AT   M01   Not yet paid
17.02.2003BE   M01   Not yet paid
17.02.2003CH   M01   Not yet paid
17.02.2003CY   M01   Not yet paid
17.02.2003DK   M01   Not yet paid
17.02.2003FI   M01   Not yet paid
17.02.2003FR   M01   Not yet paid
17.02.2003GB   M01   Not yet paid
17.02.2003GR   M01   Not yet paid
17.02.2003IE   M01   Not yet paid
17.02.2003LU   M01   Not yet paid
17.02.2003MC   M01   Not yet paid
17.02.2003NL   M01   Not yet paid
17.02.2003SE   M01   Not yet paid
17.02.2003TR   M01   Not yet paid
Additional fee for renewal fee
31.12.200606   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO0046456  (WALLIN ARNE B [CA]) [A] 1,4 * page 3, line 6 - page 6, line 23 * * page 9, line 19 - page 11, line 13 * * figures 7-11 *;
 [A]FR2518613  (DESJOYAUX CATHERINE [FR]) [A] 1,5 * the whole document *;
 [A]EP1035273  (ABRIBLUE [FR]) [A] 1,5 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.