blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1225287

EP1225287 - Device for the processing and/or the applying of plate-like construction elements on scaffoldings [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  10.11.2006
Database last updated on 24.08.2024
Most recent event   Tooltip19.09.2008Change - representativepublished on 22.10.2008  [2008/43]
Applicant(s)For all designated states
Deutsche Rockwool Mineralwoll GmbH & Co. OHG
Rockwool Strasse 37-41
45966 Gladbeck / DE
[2002/30]
Inventor(s)01 / Gerd-Rüdiger, Klose, Dr.-Ing.
Lembecker Strasse 76
46286 Dorsten / DE
 [2002/30]
Representative(s)Wanischeck-Bergmann, Axel
Stenger - Watzke - Ring intellectual property Am Seestern 8
40547 Düsseldorf / DE
[2008/43]
Former [2002/30]Wanischeck-Bergmann, Axel
Köhne & Wanischeck-Bergmann & Schwarz, Rondorfer Strasse 5a
50968 Köln / DE
Application number, filing date02000364.605.01.2002
[2002/30]
Priority number, dateDE200110212218.01.2001         Original published format: DE 10102122
DE200111794010.04.2001         Original published format: DE 10117940
[2002/30]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1225287
Date:24.07.2002
Language:DE
[2002/30]
Type: A3 Search report 
No.:EP1225287
Date:19.11.2003
[2003/47]
Search report(s)(Supplementary) European search report - dispatched on:EP07.10.2003
ClassificationIPC:E04G1/26, E04F21/02, E04F21/06
[2003/47]
CPC:
E04F21/02 (EP); E04G5/00 (EP); E04G5/003 (EP);
E04F21/1861 (EP)
Former IPC [2002/30]E04G1/26
Designated contracting statesAT,   DE [2004/33]
Former [2002/30]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE,  TR 
TitleGerman:Vorrichtung zur Bearbeitung und/oder Verarbeitung von plattenförmigen Bauelementen auf Baugerüsten[2002/30]
English:Device for the processing and/or the applying of plate-like construction elements on scaffoldings[2002/30]
French:Dispositif pour le traitement et/ou la pose d'éléments de construction en forme de plaque sur des échafaudages[2002/30]
Examination procedure21.04.2004Examination requested  [2004/26]
02.06.2004Loss of particular rights, legal effect: designated state(s)
07.09.2004Despatch of communication of loss of particular rights: designated state(s) BE, CH, CY, DK, ES, FI, FR, GB, GR, IE, IT, LU, MC, NL, PT, SE, TR
24.10.2006Application withdrawn by applicant  [2006/50]
Fees paidRenewal fee
14.01.2004Renewal fee patent year 03
12.01.2005Renewal fee patent year 04
24.06.2006Renewal fee patent year 05
Penalty fee
Penalty fee Rule 85a EPC 1973
23.06.2004BE   M01   Not yet paid
23.06.2004CH   M01   Not yet paid
23.06.2004CY   M01   Not yet paid
23.06.2004DK   M01   Not yet paid
23.06.2004ES   M01   Not yet paid
23.06.2004FI   M01   Not yet paid
23.06.2004FR   M01   Not yet paid
23.06.2004GB   M01   Not yet paid
23.06.2004GR   M01   Not yet paid
23.06.2004IE   M01   Not yet paid
23.06.2004IT   M01   Not yet paid
23.06.2004LU   M01   Not yet paid
23.06.2004MC   M01   Not yet paid
23.06.2004NL   M01   Not yet paid
23.06.2004PT   M01   Not yet paid
23.06.2004SE   M01   Not yet paid
23.06.2004TR   M01   Not yet paid
Additional fee for renewal fee
31.01.200605   M06   Fee paid on   24.06.2006
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]US5027921  (DUEZ ALAIN [FR]) [X] 1,5 * column 3, line 13 - column 3, line 56 * * figures 1,2; claim 1 * [Y] 2-4,6-12,14,18,23;
 [Y]FR2631061  (BOUYGUES SA [FR]) [Y] 2,3 * page 1, line 16 - page 2, line 16 * * figure 1 *;
 [Y]EP0182727  (LEFORT JOEL [FR], et al) [Y] 4,6-8,10,18 * page 4, line 22 - page 4, line 40 * * page 8, line 21 - page 8, line 39 * * figures 1,3,4 *;
 [Y]DE9317184U  (JOHANN DEMMLER KG FAHRZEUGBAU [DE]) [Y] 4,6,9,10,23 * the whole document *;
 [DYA]DE8810244U  (MÖLLER HANS) [DY] 11,12 * figures 1,2 * [A] 15,20;
 [Y]DE8409221U  (SCHÜTZ HORST) [Y] 10,14 * page 6, line 1 - page 7, line 23 * * figures 1,2; claim 1 *;
 [A]DE29906684U  (MARMORIT GMBH [DE]) [A] 17,22 * figures 1,2 *;
 [A]NL6714274  (SCHOLTEN RESEARCH NV) [A] 21 * page 4, line 29 - page 5, line 18 * * figures 1-3 *;
 [A]US3788424  (CHABOT S) [A] 24 * column 2, line 36 - column 2, line 64 * * figures 1-4 *
by applicantDE8810244U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.