blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1280305

EP1280305 - Transmission path selection method and communication network therefore [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.04.2008
Database last updated on 07.10.2024
Most recent event   Tooltip11.09.2009Lapse of the patent in a contracting state
New state(s): TR
published on 14.10.2009  [2009/42]
Applicant(s)For all designated states
Alcatel Lucent
54, rue la Boétie
75008 Paris / FR
[N/P]
Former [2007/14]For all designated states
Alcatel Lucent
54 rue La Boétie
75008 Paris / FR
Former [2003/05]For all designated states
ALCATEL
54, rue La Boétie
75008 Paris / FR
Inventor(s)01 / Fabre, Benoît
6 Impasse du Ramier des Catalans Bât. A2
31000 Toulouse / FR
02 / Canela, Zoely
14bis, chemin du Plateau
91620 La Ville du Bois / FR
03 / Randriamasy, Claire-Sabine
68 rue de la République
92190 Meudon / FR
 [2007/04]
Former [2003/05]01 / Fabre, Benoît
6 Impasse du Ramier des Catalans Bat. A2
31000 Toulouse / FR
02 / Canela, Zoely
14bis, chemin du Plateau
91620 La Ville du Bois / FR
03 / Randriamasy, Claire-Sabine
68 rue de la République
92190 Meudon / FR
Representative(s)Chaffraix, Sylvain, et al
Alcatel Lucent
Intellectual Property & Standards
54 Rue La Boétie
75008 Paris / FR
[N/P]
Former [2003/05]Chaffraix, Sylvain, et al
Compagnie Financière Alcatel Département Propriété Industrielle 30, Avenue Kléber
75116 Paris / FR
Application number, filing date02291820.518.07.2002
[2003/05]
Priority number, dateFR2001001000126.07.2001         Original published format: FR 0110001
[2003/05]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1280305
Date:29.01.2003
Language:FR
[2003/05]
Type: B1 Patent specification 
No.:EP1280305
Date:20.06.2007
Language:FR
[2007/25]
Search report(s)(Supplementary) European search report - dispatched on:EP17.12.2002
ClassificationIPC:H04L12/56
[2003/05]
CPC:
H04L45/12 (EP,US); H04L45/124 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SK,   TR [2003/05]
TitleGerman:Verfahren zur Übertragungswegeauswahl und Kommunikationssnetz dafür[2003/05]
English:Transmission path selection method and communication network therefore[2003/05]
French:Procédé de sélection de chemins de transmission et réseau de communication mettant en oeuvre ce procédé[2003/05]
Examination procedure29.07.2003Examination requested  [2003/39]
10.08.2006Despatch of a communication from the examining division (Time limit: M04)
07.12.2006Reply to a communication from the examining division
29.12.2006Communication of intention to grant the patent
08.05.2007Fee for grant paid
08.05.2007Fee for publishing/printing paid
Opposition(s)25.03.2008No opposition filed within time limit [2008/22]
Fees paidRenewal fee
21.06.2004Renewal fee patent year 03
14.07.2005Renewal fee patent year 04
13.07.2006Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT20.06.2007
CY20.06.2007
CZ20.06.2007
DK20.06.2007
EE20.06.2007
FI20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
TR20.06.2007
LU18.07.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
[2009/42]
Former [2009/38]AT20.06.2007
CY20.06.2007
CZ20.06.2007
DK20.06.2007
EE20.06.2007
FI20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
LU18.07.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2009/33]AT20.06.2007
CY20.06.2007
CZ20.06.2007
DK20.06.2007
EE20.06.2007
FI20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2009/15]AT20.06.2007
CZ20.06.2007
DK20.06.2007
EE20.06.2007
FI20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2009/10]AT20.06.2007
CZ20.06.2007
DK20.06.2007
EE20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/40]AT20.06.2007
CZ20.06.2007
DK20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BE31.07.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/23]AT20.06.2007
CZ20.06.2007
DK20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
CH31.07.2007
LI31.07.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/22]AT20.06.2007
CZ20.06.2007
DK20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
MC31.07.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/21]AT20.06.2007
CZ20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BG20.09.2007
SE20.09.2007
GR21.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/13]AT20.06.2007
CZ20.06.2007
IE20.06.2007
NL20.06.2007
SK20.06.2007
BG20.09.2007
SE20.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/10]AT20.06.2007
CZ20.06.2007
IE20.06.2007
NL20.06.2007
BG20.09.2007
SE20.09.2007
ES01.10.2007
PT20.11.2007
Former [2008/09]AT20.06.2007
NL20.06.2007
BG20.09.2007
SE20.09.2007
ES01.10.2007
Former [2008/08]AT20.06.2007
SE20.09.2007
ES01.10.2007
Former [2007/50]AT20.06.2007
SE20.09.2007
Former [2007/48]SE20.09.2007
Documents cited:Search[A]  - BORELLA A ET AL, "IMPROVING THE COST/PERFORMANCE RATIO IN MULTICAST COMMUNICATIONS", PROCEEDINGS OF THE EUROPEAN CONFERENCE ON NETWORKS AND OPTICAL COMMUNICATIONS 2000. NOC 2000. BROADBAND ACCESS, WDM METRO AND NETWORK MANAGEMENT, PROCEEDINGS OF THE EUROPEAN CONFERENCE ON NETWORKS AND OPTICAL COMMUNICATIONS. NOC, AMSTERDAM: IOS PRESS, (2000), vol. PRT 2 OF 2, ISBN 1-58603-068-X, pages 187 - 190, XP000993864 [A] 1-14 * page 187, lines 1-18, paragraph 1. * * page 188, paragraph 2 *
 [A]  - CASETTI C ET AL, "AN ADAPTIVE ROUTING ALGORITHM FOR BEST-EFFORT TRAFFIC IN INTEGRATED-SERVICES NETWORKS", PROCEEDINGS OF THE INTERNATIONAL TELETRAFFIC CONGRESS. ITC-16. TELETRAFFIC ENGINEERING IN A COMPETITIVE WORLD. EDINBURGH, UK, JUNE 7 - 11, 1999, TELETRAFFIC SCIENCE AND ENGINEERING, AMSTERDAM: ELSEVIER, NL, (19990607), vol. 3B, ISBN 0-444-50268-8, pages 1281 - 1290, XP000878159 [A] 1-14 * page 1283, lines 16-29 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.