blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1385352

EP1385352 - Monitoring unit for ISDN U interface [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  05.07.2013
Database last updated on 13.11.2024
Most recent event   Tooltip30.08.2013Rights in Rem or Legal Means of Executionpublished on 02.10.2013  [2013/40]
Applicant(s)For all designated states
Alcatel Lucent
3, avenue Octave Gréard
75007 Paris / FR
[N/P]
Former [2012/08]For all designated states
Alcatel Lucent
3 avenue Octave Gréard
75007 Paris / FR
Former [2007/14]For all designated states
Alcatel Lucent
54 rue La Boétie
75008 Paris / FR
Former [2004/05]For all designated states
ALCATEL
54, rue La Boétie
75008 Paris / FR
Inventor(s)01 / Aschrafi, Bagher
Schwenkgasse 63
73240 Wendlingen / DE
 [2004/05]
Representative(s)Menzietti, Domenico, et al
Alcatel Lucent
Intellectual Property & Standards
70430 Stuttgart / DE
[N/P]
Former [2004/05]Menzietti, Domenico, Dipl.-Ing, et al
Alcatel Intellectual Property Department, Stuttgart
70430 Stuttgart / DE
Application number, filing date02360222.024.07.2002
[2004/05]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1385352
Date:28.01.2004
Language:DE
[2004/05]
Search report(s)(Supplementary) European search report - dispatched on:EP25.03.2003
ClassificationIPC:H04Q11/04
[2004/05]
CPC:
H04Q11/045 (EP); H04Q2213/13034 (EP); H04Q2213/13039 (EP);
H04Q2213/1305 (EP); H04Q2213/13103 (EP); H04Q2213/13106 (EP);
H04Q2213/1316 (EP); H04Q2213/13176 (EP); H04Q2213/1319 (EP);
H04Q2213/13194 (EP); H04Q2213/13202 (EP); H04Q2213/13203 (EP);
H04Q2213/13209 (EP); H04Q2213/13214 (EP); H04Q2213/13216 (EP);
H04Q2213/13292 (EP); H04Q2213/13302 (EP) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SK,   TR [2004/05]
TitleGerman:ISDN U-Schnittstellenüberwachungsvorrichtung[2004/05]
English:Monitoring unit for ISDN U interface[2004/05]
French:Unité de surveillance d'une interface U RNIS[2004/05]
Examination procedure02.04.2004Examination requested  [2004/23]
20.08.2010Despatch of a communication from the examining division (Time limit: M04)
20.12.2010Reply to a communication from the examining division
01.10.2012Communication of intention to grant the patent
11.02.2013Fee for grant paid
11.02.2013Fee for publishing/printing paid
12.02.2013Application deemed to be withdrawn, date of legal effect  [2013/32]
20.03.2013Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2013/32]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  20.08.2010
Fees paidRenewal fee
30.06.2004Renewal fee patent year 03
14.07.2005Renewal fee patent year 04
13.07.2006Renewal fee patent year 05
28.07.2007Renewal fee patent year 06
15.07.2008Renewal fee patent year 07
20.07.2009Renewal fee patent year 08
27.07.2010Renewal fee patent year 09
25.07.2011Renewal fee patent year 10
23.07.2012Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Rights in Rem or Legal Means of ExecutionID:01
For:all designated states
Date:10.04.2013
[2013/40]
Documents cited:Search[XAY]EP0573735  (TELEFONBAU & NORMALZEIT GMBH [DE]) [X] 1-4,7-9 * abstract * * column 3, lines 16-48 * * figures 1-3; claims 1,2,4 * [A] 6 [Y] 5;
 [A]US5708713  (HARTE RENE ANTONIE [NL]) [A] 1-9 * column 9, line 63 - column 10, line 42 * * figure 1 *;
 [Y]WO9966700  (NOKIA NETWORKS OY [FI], et al) [Y] 5 * page 3, lines 23-28 * * figure 5 *;
 [A]EP1006750  (LUCENT TECHNOLOGIES INC [US]) [A] 1-9 * page 3, paragraphs 15-21 * * figure 3 *;
 [A]FR2818477  (FRANCE TELECOM [FR]) [A] 5,6 * page 2, line 20 - page 3, line 2 ** figure 1 *;
 [A]  - DASPIT N R ET AL, "5ESS SWITCH ISDN BETA SITE USERS GROUP", PROCEEDINGS OF THE NATIONAL COMMUNICATIONS FORUM, NATIONAL ENGINEERING CONSORTIUM INC. OAK BROOK, ILLINOIS, US, (19880930), vol. 42, no. 2, pages 1182 - 1188, XP000053895 [A] 1-9 * page 1184, column L * * figure 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.