blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1327732

EP1327732 - Edge shuttering for concrete slabs [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.03.2013
Database last updated on 07.10.2024
Most recent event   Tooltip30.05.2014Lapse of the patent in a contracting state
New state(s): LU
published on 02.07.2014  [2014/27]
Applicant(s)For all designated states
System Albanese
Amelenweg 16
8400 Winterthur / CH
[2003/29]
Inventor(s)01 / Albanese, Giulio
Amelenweg 16
8400 Winterthur / CH
 [2003/29]
Representative(s)Gachnang, Hans Rudolf, et al
Gachnang AG Patentanwälte
Badstrasse 5
8500 Frauenfeld / CH
[N/P]
Former [2012/18]Gachnang, Hans Rudolf, et al
Patentanwalt H.R. Gachnang Badstrasse 5 Postfach
8501 Frauenfeld / CH
Former [N/P]Gachnang, Hans Rudolf, et al
Badstrasse 5 Postfach 323
8501 Frauenfeld / CH
Former [2003/29]Gachnang, Hans Rudolf, et al
Patentanwalt, Badstrasse 5 Postfach 323
8501 Frauenfeld / CH
Application number, filing date02406137.623.12.2002
[2003/29]
Priority number, dateCH2001000233824.12.2001         Original published format: CH 23382001
[2003/29]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1327732
Date:16.07.2003
Language:DE
[2003/29]
Type: B1 Patent specification 
No.:EP1327732
Date:02.05.2012
Language:DE
[2012/18]
Search report(s)(Supplementary) European search report - dispatched on:EP07.04.2003
ClassificationIPC:E04G11/36
[2003/29]
CPC:
E04B5/32 (EP); E04B2005/322 (EP); E04B2005/324 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SI,   SK,   TR [2003/29]
TitleGerman:Deckenrand-Abschalelement für Betondecken[2003/29]
English:Edge shuttering for concrete slabs[2003/29]
French:Coffrage de rive pour dalles en béton[2003/29]
Examination procedure27.12.2003Examination requested  [2004/10]
05.01.2006Despatch of a communication from the examining division (Time limit: M06)
11.07.2006Reply to a communication from the examining division
27.03.2007Despatch of a communication from the examining division (Time limit: M04)
21.07.2007Reply to a communication from the examining division
18.10.2007Despatch of a communication from the examining division (Time limit: M04)
31.01.2008Reply to a communication from the examining division
25.05.2011Despatch of a communication from the examining division (Time limit: M04)
28.09.2011Reply to a communication from the examining division
25.11.2011Communication of intention to grant the patent
22.03.2012Fee for grant paid
22.03.2012Fee for publishing/printing paid
Divisional application(s)EP07014365.6  / EP1842984
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.01.2006
Opposition(s)05.02.2013No opposition filed within time limit [2013/15]
Fees paidRenewal fee
06.12.2004Renewal fee patent year 03
28.11.2005Renewal fee patent year 04
04.12.2006Renewal fee patent year 05
05.12.2007Renewal fee patent year 06
22.12.2008Renewal fee patent year 07
14.11.2009Renewal fee patent year 08
12.02.2011Renewal fee patent year 09
19.11.2011Renewal fee patent year 10
Penalty fee
Additional fee for renewal fee
31.12.201009   M06   Fee paid on   12.02.2011
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
TR02.05.2012
BG02.08.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
IE23.12.2012
LU23.12.2012
BE31.12.2012
MC31.12.2012
[2014/27]
Former [2014/21]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
TR02.05.2012
BG02.08.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
IE23.12.2012
BE31.12.2012
MC31.12.2012
Former [2013/47]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
BG02.08.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
IE23.12.2012
BE31.12.2012
MC31.12.2012
Former [2013/44]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
BG02.08.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
BE31.12.2012
MC31.12.2012
Former [2013/34]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
BG02.08.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
MC31.12.2012
Former [2013/33]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
MC31.12.2012
Former [2013/22]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
GR03.08.2012
ES13.08.2012
PT03.09.2012
Former [2013/11]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
IT02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
GR03.08.2012
PT03.09.2012
Former [2013/10]CY02.05.2012
CZ02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
SK02.05.2012
GR03.08.2012
PT03.09.2012
Former [2013/09]CY02.05.2012
DK02.05.2012
EE02.05.2012
FI02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
GR03.08.2012
PT03.09.2012
Former [2013/08]CY02.05.2012
DK02.05.2012
FI02.05.2012
NL02.05.2012
SE02.05.2012
SI02.05.2012
GR03.08.2012
PT03.09.2012
Former [2013/01]CY02.05.2012
FI02.05.2012
SE02.05.2012
SI02.05.2012
GR03.08.2012
PT03.09.2012
Former [2012/51]CY02.05.2012
FI02.05.2012
SE02.05.2012
SI02.05.2012
GR03.08.2012
Former [2012/50]CY02.05.2012
FI02.05.2012
SE02.05.2012
GR03.08.2012
Former [2012/49]CY02.05.2012
FI02.05.2012
SE02.05.2012
Former [2012/48]FI02.05.2012
SE02.05.2012
Documents cited:Search[A]US3759009  (RANSOME F) [A] 9* column 1, line 49 - line 68; figures 1-3 *;
 [X]DE8328378U  (BAUER, ANTON) [X] 1,2,5,10,11 * page 4, line 1 - line 20; figures 1-5 *;
 [XY]DE8505592U  (PRIX-WERK WIEHOFSKY) [X] 1,2,4,5 * the whole document * [Y] 6-8,12;
 [A]DE3542651  (EGCO AG [CH]) [A] 4,5 * page 9, line 17 - page 10, line 19; figures 2,3 *;
 [DYA]EP0927796  (SYSTEM ALBANESE [CH]) [DY] 6-8,12 * page 9, paragraph 42 - page 10, paragraph 47; figures 1,16,20 * [A] 3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.