EP1364121 - CLAMPING ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.05.2008 Database last updated on 06.11.2024 | Most recent event Tooltip | 30.05.2008 | No opposition filed within time limit | published on 02.07.2008 [2008/27] | Applicant(s) | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | [2007/30] |
Former [2003/48] | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
NIESLONY, Markus Schulstrasse 12/1 73084 Salach / DE | [2003/48] | Application number, filing date | 02712737.2 | 01.02.2002 | [2003/48] | WO2002DE00371 | Priority number, date | DE2001108201 | 21.02.2001 Original published format: DE 10108201 | [2003/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO02066823 | Date: | 29.08.2002 | Language: | DE | [2002/35] | Type: | A1 Application with search report | No.: | EP1364121 | Date: | 26.11.2003 | Language: | DE | The application published by WIPO in one of the EPO official languages on 29.08.2002 takes the place of the publication of the European patent application. | [2003/48] | Type: | B1 Patent specification | No.: | EP1364121 | Date: | 25.07.2007 | Language: | DE | [2007/30] | Search report(s) | International search report - published on: | EP | 29.08.2002 | Classification | IPC: | F02M61/16, F16L37/088 | [2003/48] | CPC: |
F16L19/0231 (EP,US);
F02M61/168 (EP,US);
F16L37/088 (EP,US);
F02M2200/8076 (EP,US);
F16B2200/67 (EP,US);
Y10S285/921 (EP,US)
| Designated contracting states | DE, ES, FR, GB, IT [2007/30] |
Former [2003/48] | AT, BE, CH, CY, DE, DK, ES, FI, FR, GB, GR, IE, IT, LI, LU, MC, NL, PT, SE, TR | Title | German: | SPANNBAUGRUPPE | [2003/48] | English: | CLAMPING ASSEMBLY | [2003/48] | French: | MODULE DE SERRAGE | [2003/48] | Entry into regional phase | 22.09.2003 | National basic fee paid | 22.09.2003 | Designation fee(s) paid | 22.09.2003 | Examination fee paid | Examination procedure | 22.09.2003 | Examination requested [2003/48] | 11.05.2006 | Despatch of a communication from the examining division (Time limit: M04) | 15.09.2006 | Reply to a communication from the examining division | 31.01.2007 | Communication of intention to grant the patent | 11.06.2007 | Fee for grant paid | 11.06.2007 | Fee for publishing/printing paid | Opposition(s) | 28.04.2008 | No opposition filed within time limit [2008/27] | Fees paid | Renewal fee | 01.03.2004 | Renewal fee patent year 03 | 28.02.2005 | Renewal fee patent year 04 | 28.02.2006 | Renewal fee patent year 05 | 28.02.2007 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [A]US1771949 (BLANCHARD ARTHUR D) [A] 1 * page 2, line 10 - line 39; figure - *; | [DA]DE2303506 (BOSCH GMBH ROBERT) [DA] 1* figure . * | by applicant | DE2303506 |